Suche
 
Folgen Sie uns auf:

North Arrow Intersects 7.55 m Grading 4.91 g/t Gold at Hope Bay Oro Project, Nunavut

09.11.2011  |  Marketwired

VANCOUVER, BRITISH COLUMBIA -- (Marketwire) -- 11/09/11 -- North Arrow Minerals Inc. (TSX VENTURE: NAR) -


Highlights



-- 10 of 11 drill holes at Hope Bay-Oro property intersect Elu shear and
significant gold mineralization including 7.55 m @ 4.91 g/t gold and
2.00 m @ 20.22 g/t Au
-- Prospecting at Greenstone Lake property identifies 600 m x 50 m corridor
of gold-mineralized shears
-- Brian McEwen appointed CEO


North Arrow Minerals Inc. is pleased to announce successful exploration results for its Hope Bay Oro and Anialik - Greenstone Lake gold projects, located in Nunavut, Canada. In particular, at the Hope Bay Oro gold property a total of 11 holes (1,225 m) were drilled on the Elu shear with highlight intervals of 7.55 m grading 4.91 g/t Au in hole 11-HB-04 including 8.00 g/t Au over 4.20 m, and 2.00 m grading 20.22 g/t Au in hole 11-HB-10.


The Oro program was managed by North Arrow and funded by Sennen Resources Ltd. ('Sennen') (TSX VENTURE: SN). Sennen funded the program as part of their option agreement to earn a 60% interest in the property (please see North Arrow news release #11-07). Most of the North Arrow's 2011 field programs on Canadian properties were funded through option or joint venture agreements, allowing the Company to focus its resources on the acquisition and development of advanced exploration properties in South America.


Brian McEwen, President and CEO of North Arrow, commented, 'We are pleased with the outcome of this year's program at the Oro and Greenstone Lake properties. Drilling at Oro successfully identified significant near-surface gold mineralization over 300 metres of strike length, and the zone remains open to the north, south and at depth. We look forward to continued work to delineate the Elu shear and identify similar zones within the property. In addition, prospecting at the Greenstone Lake property has identified a large new zone of gold-mineralized shears for follow-up.'


Oro Gold Property Drill Program Results


The 10,000-acre Oro property adjoins the Doris North mine property being brought into production by Hope Bay Mining Ltd (a wholly owned subsidiary of Newmont Mining Corporation) and covers the northern 10 km of the prolific 80 km long Archean Hope Bay Greenstone belt. The belt contains an estimated 10.6 million ounces of gold(1) including Hope Bay Mining's Doris, Boston and Madrid deposits that collectively represent one of the largest undeveloped gold deposits in Canada. The purpose of the drill program was to further define the extent of mineralization within the previously identified Elu shear. Previous surface trenching over a 400 m strike length returned significant gold values including 11.6 grams per tonne gold (g/t Au) over 1.9 m and 24.7 g/t Au over 5.0 m. A four hole diamond drill program in 1998 returned downhole intersections of 14.3 g/t Au over 2.0 m and 5.5 g/t Au over 6.0 m.


The 2011 drilling tested 300 metres of strike length. All holes except for hole 11-HB-03 intersected the Elu shear and returned significant gold values. As well, substantial gold values were returned for the Elu splay and Elu shear east, which occur sub parallel to the Elu shear to the northwest and the southeast of the Elu shear, respectively. Intervals with material gold grades are summarized in the following table.


(1) The Northern Miner, November 7, 2011



--------------------------------------------------------------------------
From To Gold
DDH Angle Azimuth (m) (m) Length g/t Zone
--------------------------------------------------------------------------
11-HB-01 -50 81 66.85 71.22 4.37 3.02 Elu
--------------------------------------------------------------------------

--------------------------------------------------------------------------
11-HB-02 -45 120 53.40 59.80 6.40 2.92 Elu
--------------------------------------------------------------------------
including 53.40 56.70 3.30 4.31
--------------------------------------------------------------------------
76.80 79.58 3.58 4.16 Elu East
--------------------------------------------------------------------------

--------------------------------------------------------------------------
11-HB-04 -45 120 38.40 45.95 7.55 4.91 Elu
--------------------------------------------------------------------------
including 38.40 42.60 4.20 8.00
--------------------------------------------------------------------------

--------------------------------------------------------------------------
11-HB-05 -45 120 48.70 49.10 0.40 5.03 Elu
--------------------------------------------------------------------------

--------------------------------------------------------------------------
11-HB-06 -45 120 15.45 18.25 2.80 3.08 Elu Splay
--------------------------------------------------------------------------
43.55 45.00 1.45 31.92 Isolated Quartz
Vein
--------------------------------------------------------------------------
71.30 73.45 2.15 2.57 Elu
--------------------------------------------------------------------------

--------------------------------------------------------------------------
11-HB-07 -45 120 47.55 47.95 0.40 4.23 Elu
--------------------------------------------------------------------------

--------------------------------------------------------------------------
11-HB-08 -45 120 42.60 46.60 4.00 7.04 Elu
--------------------------------------------------------------------------
55.95 56.75 0.80 1.38 Elu East
--------------------------------------------------------------------------

--------------------------------------------------------------------------
11-HB-09 -45 120 96.10 97.20 1.10 13.70 Elu
--------------------------------------------------------------------------

--------------------------------------------------------------------------
11-HB-10 -54 78 124.95 126.95 2.00 20.22 Elu
--------------------------------------------------------------------------

--------------------------------------------------------------------------
11-HB-11 -45 120 78.50 79.00 0.5 1.95 Elu
--------------------------------------------------------------------------

--------------------------------------------------------------------------


The most northerly intersection of the Elu shear was in hole 11-HB-10 where the host rock was a foliated feldspar quartz porphyry with moderate sericite alteration, quartz carbonate veining and related sulphide mineralization. The surface expression and all other intersections of the Elu shear are within an Archean mafic volcanic sequence. This means the Elu shear is not constrained by stratigraphy and is open to the north as well as down dip and to the south of current drilling. Hole 11-HB-03 which was collared approximately 50 m north of hole 11-HB-10 was terminated after drilling over 42 m of tonolite at the bottom of the hole. The discovery of the Elu shear in altered felsic intrusive rocks suggests that hole 11-HB-03 should have been allowed to continue farther to the east.


North Arrow's 2011 drilling program has confirmed continuity of gold mineralization for the Elu shear and that additional drilling is warranted to fully outline gold mineralization associated with the Elu shear. Further work to identify other gold mineralized shears on the Oro property is also warranted. This would include prospecting and the application of soil sampling to test for potentially hidden mineralized shears in overburden covered areas.


Anialik - Greenstone Lake Property Sampling Results


The 762-acre Greenstone Lake property is part of Inuit Owned Land parcel CO-30 under option from Nunavut Tunngavik Incorporated (NTI) by North Arrow. The property lies approximately 575 km north northeast of Yellowknife, Northwest Territories in the Anialik River volcanic belt, an Archean greenstone terrain that is favourable for volcanogenic massive sulphide (VMS) and gold deposits.


The initial Greenstone Lake showing was discovered in 1989 when a single sample returned 2.78 g/t gold from a quartz vein with 4% pyrite. Sampling in 2005 returned assays of over 1 g/t gold for six of eight samples described as being from sheared mafic volcanics with carbonate alteration, and included assays of 33.83, 22.63 and 7.98 g/t gold respectively.


This fall, prospecting identified additional mineralized shears with six of twelve samples returning assays of greater than 1 g/t gold and including assays of 11.2, 6.8 and 3.6 g/t gold respectively. All samples were from shear zones within mafic volcanic flows, tuffs and pillow lavas. The shears strike just east of north, have sub-vertical dips and tend to occupy depressions. Width potential for individual shears is estimated between 1 to 20 metres. The sampling carried out to date has therefore identified a series of subparallel shears within a corridor measuring over 600 m long and over 50 m wide. A program of detailed geologic mapping, sampling and ground geophysics is planned for the 2012 field season.


Quality Assurance


North Arrow's exploration programs are conducted under the supervision of Gordon Clarke, P.Geol. (NT&NU), Vice President, Exploration for North Arrow and a qualified person under NI 43-101. Samples selected for analysis for both projects were sent to Acme Analytical Laboratories' sample preparation lab in Yellowknife, Northwest Territories where samples were crushed and a 250 g split collected and pulverized to 200 mesh. Acme Analytical Laboratories is an accredited ISO 9000:2001 full-service commercial laboratory with its head office located in Vancouver British Columbia. Sample pulps were forwarded to Acme's Vancouver lab for analysis. For the Hope Bay project samples were subjected to an aqua regia digestion and analysis for 20 elements by inductively coupled plasma (ICP) emission spectrometry as well as fire assay fusion for gold on a 30 g sample with an inductively coupled plasma (ICP) emission spectrometry finish, plus a gravimetric finish for samples over 10 ppm. Along with laboratory inserted duplicates and standards, additional standards, blanks and duplicate samples were inserted in the field to provide optimum precision and accuracy. The Greenstone Lake samples were subjected to a four acid digestion and analysis for 40 elements using a combination of ICP and ICP mass spectrometry methods. Laboratory inserted duplicates and standards provided optimum precision and accuracy.


Corporate Update


On behalf of the Board of Directors, Mr. Gren Thomas is pleased to announce the appointment of Mr. Brian McEwen to the role of President & Chief Executive Officer, effective immediately. Mr. McEwen joined North Arrow in March 2011 as the Company's President and Chief Operating Officer and since that time has identified several exciting new opportunities for the Company in South America, including the Agua Grande copper-gold project in Chile that is currently undergoing a due diligence program.


At the Annual General and Special Meeting of Shareholders in Vancouver on November 3rd shareholders elected four directors to the Board, including Gren Thomas (Chair), Ken Armstrong, Karl Fix and Blair Murdoch.


'The Board welcomes Brian to the role of CEO, and as Chairman I look forward to continuing to work with him to drive the growth of the company for our shareholders,' commented Mr Thomas. 'We would also like to welcome Karl Fix to the Board of North Arrow, and at the same time thank out-going directors Gord Clarke and Lou Covello for all of their previous contributions.'


At the meeting shareholders also approved the re-appointment of Davidson and Company, LLP, Chartered Accountants as auditors for the Company. The Company's 10% Rolling Stock Option Plan and, by special resolution, certain amendments to the Company's Articles were also approved. Finally, a majority of the Company's disinterested shareholders approved the creation of a Control Person, namely D. Grenville Thomas and Anglo-Celtic Exploration Ltd.


Pursuant to the terms of the Company's Stock Option Plan, a total of 170,000 stock options, priced at $0.20 per stock option and exercisable until November 3, 2016 were granted to a Director.


About North Arrow Minerals


North Arrow Minerals is a well-established junior exploration company with a diversified portfolio of gold, base metal and diamond projects. Most of the North Arrow's 2011 field programs on Canadian properties were funded through option or joint venture agreements, allowing the Company to focus its resources on the acquisition and development of advanced exploration properties in South America. North Arrow has signed a letter of intent to acquire the Agua Grade gold-copper project in Chile and is currently conducting a due diligence program.


North Arrow Minerals Inc.


Brian McEwen, President and COO


Cautionary Note Regarding Forward-Looking Statements - The information in this press release includes certain 'forward-looking statements' All statements, other than statements of historical fact, included herein including, without limitation, plans for and intentions with respect to the company's properties, statements regarding intentions with respect to obligations due for various projects, strategic alternatives, quantity of resources or reserves, timing of permitting, construction and production and other milestones, are forward looking statements. Statements concerning Mineral Reserves and Mineral Resources are also forward-looking statements in that they reflect an assessment, based on certain assumptions, of the mineralization that would be encountered and mining results if the project were developed and mined in the manner described. Forward-looking statements involve various risks and uncertainties. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from NAR's expectations include the uncertainties involving the need for additional financing to explore and develop properties and availability of financing in the debt and capital markets; uncertainties involved in the interpretation of drilling results and geological tests and the estimation of reserves and resources; the need for cooperation of government agencies and First Nation groups in the exploration, and development of properties; and the need to obtain permits and governmental approval. NAR's forward looking statements reflect the beliefs, opinions and projections of management on the date the statements are made. NAR assumes no obligation to update the forward looking statements if management's beliefs, opinions, projections, or other factors should they change.


Neither the TSX Venture Exchange nor its Regulation Services Provider accepts responsibility for the adequacy or accuracy of this release.

Contacts:

North Arrow Minerals Inc.

Julie Hajduk

Corporate Communications

604-681-5543 or Cell: 778-240-7077
julie@northarrowminerals.com
www.northarrowminerals.com



Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!




Mineninfo
North Arrow Minerals Inc.
Bergbau
A40G3U
CA6572805092
Minenprofile
Alle Angaben ohne Gewähr! Copyright © by GoldSeiten.de 1999-2024.
Die Reproduktion, Modifikation oder Verwendung der Inhalte ganz oder teilweise ohne schriftliche Genehmigung ist untersagt!

"Wir weisen Sie ausdrücklich auf unser virtuelles Hausrecht hin!"