Suche
 
Folgen Sie uns auf:

Silvercorp Surface Diamond Drilling Intercepted 3.13 Meters of 432 Grams per Tonne Silver at the GC Silver-Lead-Zinc Project in Guangdong Province, Southern China

17.01.2012  |  Marketwired

VANCOUVER, BRITISH COLUMBIA -- (Marketwire) -- 01/17/12 -- Silvercorp Metals Inc. ('Silvercorp') (TSX: SVM)(NYSE: SVM) is pleased to report the results for its 2011 surface drilling program at the GC silver-lead-zinc project located in Guangdong Province, Southern China. The drill program has discovered four new high grade silver (Ag), lead (Pb), and zinc (Zn) veins and a number of vein structures and isolated mineralized pockets, increasing the total number of mineralized veins at the GC property to 33 veins. The program also successfully extended the existing veins further to down dip and striking directions.


Selected significant intercepts are as follows:



-- Hole ZK40605 intercepted 0.40m interval of the V6 vein grading 2,450 g/t
Ag, 1.29% Pb, 11.65% Zn, and 0.41% tin (Sn);

-- Hole ZK2406 intersected 3.13 m interval of the V9W-2 vein grading 432
g/t Ag, including 0.40 m interval containing 3120 g/t Ag, 0.95% Pb,
3.67% Zn, and 0.38% Sn;

-- Hole ZK40603 intercepted 1.15 m interval of the V6 vein grading 489 g/t
Ag, 2.57% Pb, 3.81% Zn, and 0.70% Sn;

-- Hole ZK40604 intercepted 0.55 m interval of the V6-0 vein grading 1,495
g/t Ag, 6.72% Pb, 7.76% Zn and 0.41% Sn;

-- Hole ZK40203 intercepted 0.40 m interval of the V6 vein grading 637 g/t
Ag, 0.91% Pb, 1.13% Zn, 0.05% Sn;

-- Hole ZK3208 intercepted 1.86 m interval of the V14 vein grading 525 g/t
Ag, 2.45% Pb, 1.55% Zn, and 0.07% Sn, including 0.56 m interval
containing 1,595 g/t Ag, 7.90% Pb, 3.97% Zn, and 0.16% Sn;

-- Hole ZK1204 intersected 3.42 m interval of the V6-0 vein grading 305 g/t
Ag and 2.48% Pb, 2.03% Zn, and 0.34% Sn, including 1.26 m interval
containing 566 g/t Ag, 0.55% Pb, 0.69% Zn, and 0.17% Sn; 0.55 m interval
of the vein V8-2 grading 1,060 g/t Ag, 2.06% Pb, 0.52% Zn, and 0.04% Sn;
and

-- Hole ZK2006 intercepted 0.64 m interval of the V9 vein grading 470 g/t
Ag, 0.39% Pb, 3.42% Zn, and 0.16% Sn.


The surface drilling program aimed to upgrade inferred mineral resources to the indicated and measured categories, and to explore and define new mineralized veins at the GC project. During 2011, a total of 14,370 meters (m) comprising of 34 holes were completed by two drill rigs at the property. Table 1 below lists assay results for 22 holes which intercepted Ag-Pb-Zn mineralization veins; the remaining 12 holes that intersected vein structures without significant assay results are not listed.


Newly Discovered Veins


The four newly discovered veins are V6-1, V8-2, V9W-1 and V9W-2.


V6-1 Vein


The vein is parallel to V6 vein, extends northwesterly for over 250 m and dips to the southwest at 85 degree angle for more than 340 m from -5m to -279m elevation. The vein is at about 33 m southwest of and parallel to the vein V6. Six drill holes intercepted the vein with four holes hitting significant mineralization that contains grades averaging 18 to 117 g/t Ag, 0.03 to 12.8% Pb, 1.52 to 3.45% Zn, and 0.16 to 0.73% Sn over 0.16 to 0.72 m true width.


V8-2 Vein


V8-2 is parallel to and at 8 m southwest of the northwesterly striking V8 vein and extends more than over 300 m between line 24 and 32. The vein steeply dips to southwest and extends over 525 m in depth from 115m to -109m elevation. Four drill holes intersected the significantly mineralized sections of the vein, containing grades averaging 259 to 1,060 g/t Ag, 1.78 to 7.09% Pb, 0.52 to 5.94% Zn, and 0.11 to 0.47% Sn over 0.14 to 0.47 m true width.


V9W-1 and V9W-2 Veins


These veins are part of V9 vein system and are parallel to V9 vein. The veins extend northwesterly over 200 m and dip to southwest at about 71 degree dipping angle. V9W-1 and V9W-2 are at hanging wall of V9 Vein about 27 m and 30 m away for the V9 respectively. Both veins are defined between explorations 20 and 24. The V9W-1 vein was intercepted by two drill holes which intercepted the vein from 164m to 79m elevation and contains grades averaging 55 to 108 g/t Ag, 0.19 to 1.18% Pb, 2.03 to 3.13% Zn, and 0.03 to 0.22% Sn over 0.14 to 2.32 m true width. Two drill holes intersected V9W-2 vein at 169m and -61m elevation, grading 31 to 110 g/t Ag, 0.18 to 0.27% Pb, 1.49 to 5.59% Zn, 0.05 to 0.34% Sn over 0.11 to 0.19 m true thickness.



Table 1: Selected Drill Hole Assay Results:
----------------------------------------------------------------------------
Intersection
----------------
From To Interval Ag Pb Zn Sn Mineralized
Drill Hole (m) (m) (m) (g/t) (%) (%) (%) Veins
----------------------------------------------------------------------------
ZK40603 139.10 140.25 1.15 489 2.57 3.81 0.70 V6
-----------------------------------------------------------------
190.93 191.33 0.40 117 12.80 3.44 less V6-1
than
0.01
----------------------------------------------------------------------------
ZK40202 169.78 170.23 0.45 96 5.52 2.61 0.13 V4
----------------------------------------------------------------------------
ZK41003 334.02 335.60 1.58 28 0.93 1.52 0.07 V4
368.73 370.17 1.44 27 2.80 4.49 0.07 V4
----------------------------------------------------------------------------
77.62 78.17 0.55 1495 6.72 7.76 0.41 V6-0
ZK40604 229.17 229.60 0.43 308 7.91 2.67 0.07 V6
243.59 243.99 0.40 149 0.05 11.85 0.34 V6-1
----------------------------------------------------------------------------
ZK40203 109.19 109.59 0.40 637 0.91 1.13 0.05 V6
136.66 137.50 0.84 46 0.68 1.52 0.03 V6-1
----------------------------------------------------------------------------
ZK410101 270.70 271.10 0.40 46 0.04 2.72 0.71 V4
----------------------------------------------------------------------------
147.90 148.30 0.40 33 1.89 15.05 0.41 V6-0
ZK40605 150.30 150.70 0.40 79 2.16 4.31 0.51 V6-0
308.09 308.49 0.40 2450 1.29 11.65 0.14 V6
----------------------------------------------------------------------------
25.60 26.46 0.86 263 1.41 1.67 0.05 Not Named
178.76 179.24 0.48 39 0.05 1.84 0.03 Not Named
ZK410102 181.73 182.33 0.60 129 0.12 3.35 0.05 Not Named
203.77 204.27 0.50 87 0.15 4.41 0.55 Not Named
218.80 219.50 0.70 36 1.20 4.41 0.09 Not Named
----------------------------------------------------------------------------
ZK41802 144.57 144.97 0.40 127 3.08 1.61 0.04 V4
----------------------------------------------------------------------------
ZK101 127.32 127.72 0.40 76 0.36 0.42 0.01 V6
----------------------------------------------------------------------------
ZK42601 54.36 55.03 0.67 14 0.02 4.43 0.15 Not Named
----------------------------------------------------------------------------
ZK2406 130.81 131.21 0.40 39 0.06 6.05 0.08 V13
201.32 204.45 3.13 432 0.18 0.63 0.07 V9W-2
Including 204.05 204.45 0.40 3120 0.95 3.67 0.38
208.39 211.02 2.63 108 0.19 3.13 0.06 V9W-1
Including 208.39 208.79 0.40 512 1.13 5.14 0.11
223.94 224.34 0.40 32 0.01 7.13 0.06 Not Named
231.20 231.67 0.47 324 2.63 4.38 0.17 Not Named
----------------------------------------------------------------------------
106.44 106.96 0.52 276 3.47 2.62 0.03 V8-2
118.18 119.70 1.52 108 0.15 1.16 0.05 V8
203.43 204.70 1.27 61 0.21 4.57 0.05 V14
227.57 227.97 0.40 64 0.47 2.71 0.19 V13
ZK2807 329.37 329.81 0.44 36 0.03 5.49 0.23 V9-1
350.53 350.98 0.45 52 1.58 3.12 0.14 Not named
366.40 367.14 0.74 104 0.61 1.77 0.17 Not named
382.25 383.15 0.90 25 0.48 0.91 0.15 V9-0
428.85 439.21 10.36 37 1.72 5.40 0.11 V9
----------------------------------------------------------------------------
ZK3208 73.43 73.90 0.47 216 0.38 3.31 0.08 V8-0
285.46 287.32 1.86 525 2.45 1.55 0.07 V14
Including 285.46 286.02 0.56 1595 7.90 3.97 0.16
295.40 295.66 0.26 117 0.20 0.36 0.04 V13
406.47 410.10 3.63 205 1.49 6.53 0.64 V9
Including 407.73 408.60 0.87 343 1.52 9.02 1.21
418.84 419.19 0.35 144 0.20 2.97 0.59 Not Named
472.87 476.04 3.17 101 3.89 2.66 0.22 V5
Including 472.87 474.00 1.13 172 8.38 3.53 0.30
----------------------------------------------------------------------------
544.90 545.21 0.31 201 10.50 2.85 0.53 V7
----------------------------------------------------------------------------
243.65 244.00 0.35 285 0.12 0.29 0.02 Not Named
325.18 325.41 0.23 89 0.18 4.47 0.21 V9
384.47 384.74 0.27 63 0.14 3.59 0.16 V5-1
445.37 445.56 0.19 32 0.05 3.20 0.09 V5
504.63 505.11 0.48 113 4.53 3.88 0.03 Not Named
ZK3608 511.94 513.42 1.48 67 1.66 1.89 0.30 V7-1
551.68 555.29 3.61 33 1.95 5.09 0.10 Not Named
675.47 675.69 0.22 81 3.53 1.61 0.30 Not Named
677.31 677.65 0.34 112 8.34 3.23 0.34 V2-1
685.68 686.69 1.01 1 0.53 3.53 0.16 V2-0
712.30 713.34 1.04 91 1.21 3.78 0.87 V2
723.69 724.34 0.65 41 0.73 3.99 0.73 V2-2
----------------------------------------------------------------------------
386.66 388.61 1.95 48 1.30 1.20 0.09 V8
501.18 502.03 0.85 253 0.86 0.46 0.08 V15
ZK3209 549.97 550.57 0.60 154 7.29 1.06 0.01 V14
600.61 600.79 0.18 43 0.74 2.57 0.14 V9-1
616.54 617.14 0.60 374 0.75 1.26 0.08 V9-0
----------------------------------------------------------------------------
ZK4005 140.20 142.43 2.23 152 1.60 3.77 0.20 V8
Including 140.20 140.67 0.47 420 2.29 8.56 0.80
226.60 226.84 0.24 203 0.20 16.60 0.14 V15-1
252.60 252.93 0.33 90 0.85 6.49 0.19 V15-0
463.90 466.75 2.85 212 0.20 0.65 0.05 V9/v10
265.41 265.85 0.44 56 0.65 2.52 0.05 V15-1
294.97 295.77 0.80 112 0.10 0.12 0.01 V15
327.36 328.39 1.03 26 0.72 3.31 0.13 V13
353.39 353.86 0.47 103 3.24 2.56 0.15 Not Named
----------------------------------------------------------------------------
ZK2005 46.50 46.67 0.17 33 0.14 4.68 0.12 V9-1
100.50 100.68 0.18 110 0.27 5.79 0.34 V9W-2
105.81 106.05 0.24 55 1.18 2.03 0.22 V9W-1
195.60 196.82 1.22 143 0.04 0.19 0.01 V9
355.00 355.22 0.22 510 0.05 0.16 0.11 V7-1
409.12 411.41 2.29 72 2.98 3.31 0.07 V7-0
413.49 416.14 2.65 83 2.89 4.84 0.06 V7-0
Including 414.37 414.57 0.20 271 16.70 11.85 0.16
475.32 478.80 3.48 116 6.86 5.57 0.23 Not Named
Including 477.22 477.96 0.74 286 20.00 5.97 0.61
513.60 514.66 1.06 90 2.09 2.10 0.97 V2-1
----------------------------------------------------------------------------
ZK2808 251.38 254.92 3.54 169 0.91 1.25 0.05 V8-0
Including 253.25 254.92 1.67 337 1.88 2.07 0.06
391.73 392.32 0.59 259 1.78 1.25 null V8-2
399.90 400.24 0.34 32 1.07 3.43 0.04 V8
424.01 425.19 1.18 82 1.45 7.45 0.23 V15-1
506.05 506.29 0.24 458 2.81 4.18 0.38 V13
581.17 581.90 0.73 165 1.13 2.07 0.20 V9-1
795.47 795.87 0.40 175 0.26 0.21 0.05 V7-1
----------------------------------------------------------------------------
ZK1204 90.09 90.33 0.24 343 12.50 1.63 0.10 V9
----------------------------------------------------------------------------
515.61 519.03 3.42 305 2.48 2.03 0.34 V6-0
----------------------------------------------------------------------------
Including 515.61 516.87 1.26 566 0.55 0.69 0.17
65.70 67.12 1.42 112 0.09 0.06 less V8-1
than
0.01
68.40 69.38 0.98 110 0.17 0.89 0.01 V8-0
184.80 185.35 0.55 1060 2.06 0.52 0.04 V8-2
197.20 197.88 0.68 252 0.66 1.67 0.04 V8
231.96 232.20 0.24 470 0.75 0.50 0.05 V15-1
----------------------------------------------------------------------------
239.80 242.23 2.43 65 0.23 3.16 0.53 V15
ZK2006 320.20 320.46 0.26 121 0.50 26.50 0.26 V9-1
449.73 450.37 0.64 470 0.39 3.42 0.16 V9
----------------------------------------------------------------------------
10.84 11.03 0.19 128 0.28 0.99 0.05 V2
ZK606 295.83 296.30 0.47 171 1.48 1.97 0.10 V5-1
377.97 379.03 1.06 103 1.61 4.62 0.21 V9
389.04 390.10 1.06 83 0.35 8.26 0.41 Not Named
----------------------------------------------------------------------------


Drill hole plans, cross sections and longitudinal maps of the veins are available on Silvercorp' s website at www.silvercorp.ca.


Project Update


The GC project mine and mill construction is well underway. As at January 10, 2012, the following work has been completed.



1. completion of 610 meters of the 4 m by 4.5 m Stage 1 ramp since mid-
August 2011;
2. preparation of the 6-meter diameter main shaft opening, ventilation
shaft opening and the ore bin foundation to allow for cement pouring;
3. installation of a main shaft headframe and sunk 22 m of main shaft and
70 m of the ventilation shaft;
4. completion of water recycling tanks for the mill and assay lab;
5. 60% completion of the mine office building and the staff accommodation
building; and
6. completion of earth work and ground preparation of the crushers, ball
mills, floatation, filtration, and loading shed of concentrates.


Quality Control


The Company has implemented a quality control program to ensure best practice in sampling and analysis of the samples. Drill cores are HQ, NQ, or BQ in size and drill core samples were taken from sawn half core for every 1.5 m or limited by apparent wall rock and mineralization contact. The samples are shipped directly in security sealed bags to ALS Chemex in Guangzhou, China (Certification ISO 9001), located approximately 180 km southeast of the GC property site.


Sample preparation consists of drying, crushing and splitting of the sample to 250 grams, then the sample is pulverized to 200 mesh. Ag, Pb, and Zn in drill core samples were analyzed by aqua regia digestion and AAS. Tin was analyzed by fusing with peroxide, then leaching the melt and acidifying to precipitate out the tin for AAS finish. Check samples including field duplicates and pulps are routinely sent to the Sub-Institute of Analytical Chemistry, Beijing General Research Institute of Mining & Metallurgy, located in Beijing.


Myles Gao, P.Geo., is the Qualified Person on the project as defined under National Instrument 43-101. He has verified the information and has reviewed and approved the contents of this news release.


About Silvercorp Metals Inc.


Silvercorp Metals Inc. is engaged in the acquisition, exploration, development and mining of high-grade silver-related mineral properties in China and Canada. Silvercorp is the largest primary silver producer in China through the operation of the four silver-lead-zinc mines at the Ying Mining Camp in the Henan Province of China. Silvercorp is currently building the GC silver-lead-zinc Project in Guangdong Province as its second China production base and foothold, and this will be followed by the third production foothold at the recently acquired BYP Gold-lead-Zinc Project in Hunan Province. In Canada, Silvercorp is in preparation of applying for a Small Mine Permit for the Silvertip high grade silver-lead-zinc mine project in northern British Columbia to provide a further platform for growth and geographic diversification. The Company's shares are traded on the New York Stock Exchange and Toronto Stock Exchange and are included as a component of the S&P/TSX Composite and the S&P/TSX Global Mining Indexes.


CAUTIONARY DISCLAIMER -- FORWARD LOOKING STATEMENTS


Certain of the statements and information in this press release constitute 'forward-looking statements' within the meaning of the United States Private Securities Litigation Reform Act of 1995 and 'forward-looking information' within the meaning of applicable Canadian provincial securities laws. Any statements or information that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance are not statements of historical fact and may be forward-looking statements or information.


Forward-looking statements or information are subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events or results to differ from those reflected in the forward-looking statements or information. Forward-looking statements or information are statements about the future and are inherently uncertain, and actual achievements of the Company or other future events or conditions may differ materially from those reflected in the forward-looking statements or information due to a variety of risks, uncertainties and other factors, including, without limitation, those referred to in the Company's Annual Information Form for the year ended March 31, 2011 under the heading 'Risk Factors'. Although the Company has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be as anticipated, estimated, described or intended. Accordingly, readers should not place undue reliance on forward-looking statements or information.


The Company's forward-looking statements and information are based on the assumptions, beliefs, expectations and opinions of management as of the date of this press release, and other than as required by applicable securities laws, the Company does not assume any obligation to update forward-looking statements and information if circumstances or management's assumptions, beliefs, expectations or opinions should change, or changes in any other events affecting such statements or information. For the reasons set forth above, investors should not place undue reliance on forward-looking statements and information.

Contacts:

Silvercorp Metals Inc.

Rui Feng

Chairman & CEO

(604) 669-9397 or Toll Free: 1(888) 224-1881


Silvercorp Metals Inc.

Lorne Waldman

Corporate Secretary

(604) 669-9397 or Toll Free: 1(888) 224-1881

(604) 669-9387 (FAX)
info@silvercorp.ca
www.silvercorp.ca



Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!




Mineninfo
Silvercorp Metals Inc.
Bergbau
A0EAS0
CA82835P1036
Minenprofile
Alle Angaben ohne Gewähr! Copyright © by GoldSeiten.de 1999-2024.
Die Reproduktion, Modifikation oder Verwendung der Inhalte ganz oder teilweise ohne schriftliche Genehmigung ist untersagt!

"Wir weisen Sie ausdrücklich auf unser virtuelles Hausrecht hin!"