Suche
 
Folgen Sie uns auf:

Silvercorp Reports 4.34 Metre Interception (True Width) of 642 Gram Per Tonne of Silver and 1.0 Gram Per Tonne Gold for Vein LM5W at the LM Mine, Ying Mining District, Henan Province, China

13.02.2012  |  Marketwired
VANCOUVER, BRITISH COLUMBIA -- (Marketwire) -- 02/13/12 -- Silvercorp Metals Inc. (TSX: SVM)(NYSE: SVM) ('Silvercorp') is pleased to report the results of its successful 2011 underground diamond drilling program at the LM Mine, Ying Mining District, Henan, China. The drill program has substantially extended the mineralized veins to depth and along striking directions. The 2011 drilling program at the LM mine was a follow up on the successful 12,255 meters (m) 2010 drilling campaign that discovered twelve additional high-grade veins as reported in the Company's Press Release of January 10, 2011, which contributed to the increase in resource announced on July 7, 2011. It is expected that the success of the 2011 drilling program may contribute additional mineral resources.


2011 Drill Results

The 2011 drill program at the LM mine completed a total of 12,655 m of diamond core drilling in 35 holes utilizing two underground drill rigs. Twenty five out of 35 completed drill holes encountered high-grade silver-lead-zinc mineralization while the remaining holes intersected vein structures with weak mineralization. The drilling has significantly extended veins LM5, LM5W, and LM6 over 600 m in depth to below 400m elevation.

The drilling has also revealed a possible trend of increasing gold grades with depth. Four out of 5 holes that intersected the veins below 400m elevation contained greater than 1 g/t gold (Au) with the deepest interception at 332m elevation (Vein LM6 in Hole ZKL5206) yielding 314 g/t silver (Ag) and 7.95 g/t Au over a 0.66 m interval.

Table 1 lists assay results for 25 holes that intercepted significant mineralization. Highlights of selected intercepts are follows.



-- Hole ZKL5006 intercepted 4.34m true width of LM5W grading 642 g/t Ag,
1.15% lead (Pb), 1% zinc (Zn) and 1.00 g/t Au at the 348m elevation,
including a 0.55m interval grading 3,720 g/t Ag, 7.13% Pb, 5.19% Zn and
1.77g/t Au;

-- Hole ZKL5402 intercepted 0.40m of vein LM5 grading 1,273 g/t Ag, 3.22%
Pb and 2.22% Zn at the 716m elevation;

-- Hole ZKL5801 intercepted 0.86m of vein LM5 grading 525 g/t Ag, 1.35% Pb
and 2.23% Zn at the 781m elevation;

-- Hole ZKL6201 intercepted 1.64m of vein LM5 grading 661 g/t Ag and 5.2%
Pb at the 692m elevation, including a 0.35m interval grading 2,016 g/t
Ag, 16.87% Pb and 1.86% Zn;

-- Hole ZKL5802 intercepted 0.40m true width of vein LM5E grading 771 g/t
Ag and 7.77% Pb at the 683m elevation;

-- Hole ZKL5206 intercepted 0.66m of vein LM6 grading 314 g/t Ag, 0.53% Pb,
0.61% Zn, and 7.95 g/t Au at 332 m elevation, and 0.70 m of LM5W grading
702 g/t Ag, 0.96% Pb and 1.35% Zn at the 289m elevation.


Mine Development Update and Production Plan at LM Mine

To date, LM Mine has been accessed by two-stage declines. The first stage decline, developed in Main Access Tunnel PD838, started at the 845m elevation and bottomed at the 790m elevation while the second stage decline is from the 790m elevation to 700m elevation. The mine production at levels above the 800m elevation and some ore production at levels above the 700m elevation have been carried out from the decline access.

Based on the successful 2010 underground diamond drilling programs at the LM Mine, the Company has developed a new shaft, Shaft 900, to expand its production. Shaft 900 is 3.5 m in diameter and was sunk from the 910m elevation to the 500m elevation, for a total depth of 410 m. The Shaft is now operational with a single deck cage. With the shaft now operational, semi-mechanized electrical loaders can now be used in underground mucking. Tunnel development has been completed at four underground levels (800mL, 750mL, 700mL, and 650mL) which will allow a gradual increase of mining capacity.

Once all the mining levels are completed down to the 500 m elevation, it is expected that the ore production from the LM Mine will increase from 18,000 tonnes in 2011 to approximately 80,000 tonnes starting early 2014, resulting in a combined annual mine production capacity of 200,000 tonnes for the LM Mine and LM Mine West.

Table 1: Selected Drill Hole Assay Results:
----------------------------------------------------------------------------
Inter- Eleva- Mineral-
Drill Intersection val tion Ag Pb Zn Au Cu ized
Hole From (m) To (m) (m) (m) (g/t) (%) (%) (g/t) (%) Veins
----------------------------------------------------------------------------
ZKL5601 118.73 119.08 0.35 745 429 0.42 0.04 less 0.02 LM6
than
0.10
----------------------------------------------------------------------------
ZKL5003 256.32 256.48 0.16 622 136 1.86 0.11 less 0.02 LM4
than
0.10
305.47 305.72 0.25 579 315 1.40 1.16 less 0.03 LM6
than
0.10
352.21 353.64 1.43 537 217 0.74 0.53 0.00 0.21 LM6E
Including 352.79 353.12 0.33 537 794 2.26 1.65 less 0.71
than
0.10
381.82 381.97 0.15 511 133 0.13 1.36 less 0.05 LM5W3
than
0.10
384.63 384.87 0.24 508 191 0.51 0.29 0.12 0.03 LM5W2
430.47 430.97 0.50 468 102 0.50 0.15 less 0.66 LM5W
than
0.10
452.30 453.43 1.13 448 454 1.45 0.58 0.85 0.11 LM5
Including 452.30 452.99 0.69 449 696 1.59 0.81 1.24 0.17
----------------------------------------------------------------------------
ZKL5507 292.59 293.66 1.07 570 208 3.14 1.64 1.26 0.04 LM6
431.83 433.30 1.47 441 325 4.27 1.24 0.04 0.05 LM5
Including 432.35 432.55 0.20 441 1,131 30.97 8.94 0.33 0.22
----------------------------------------------------------------------------
ZKL5401 101.22 101.40 0.18 793 132 1.35 0.44 0.00 0.02 LM6
111.48 111.68 0.20 788 165 0.40 0.31 0.01 0.28 LM6E2
164.40 166.00 1.60 763 277 1.90 0.33 0.00 0.14 LM5
Including 165.50 166.00 0.50 762 560 3.84 0.37 0.00 0.36
----------------------------------------------------------------------------
ZKL5004 497.88 500.47 2.59 384 312 1.31 0.24 0.42 0.02 LM5
Including 499.19 499.53 0.34 384 525 3.08 0.42 1.20 0.03
----------------------------------------------------------------------------
ZKL5402 189.05 189.45 0.40 716 1,273 3.22 2.22 0.07 0.62 LM5
205.16 205.42 0.26 706 1,008 4.67 2.19 0.03 0.29 LM5E2
----------------------------------------------------------------------------
ZKL004 139.43 140.03 0.60 758 114 0.15 0.07 less 0.02 LM2
than
0.10
----------------------------------------------------------------------------
ZKL005 149.31 149.72 0.41 727 107 0.58 0.09 less 0.02 LM2
than
0.10
----------------------------------------------------------------------------
ZKL5203 412.15 412.48 0.33 518 329 4.67 1.26 less 0.12 LM6
than
0.10
524.17 524.62 0.45 430 207 2.74 0.43 less 0.05 LM5
than
0.10
----------------------------------------------------------------------------
ZKL008 196.14 196.76 0.62 636 68 1.50 0.19 less 0.08 LM2-2
than
0.10
236.36 236.68 0.32 596 246 3.47 0.15 less 0.15 LM2-2W
than
0.10
----------------------------------------------------------------------------
ZKL6001 83.69 83.87 0.18 788 458 2.47 0.58 less 0.04 LM6
than
0.10
164.78 165.16 0.38 745 70 1.30 0.67 less 0.06 LM5
than
0.10
----------------------------------------------------------------------------
ZKL6002 210.67 211.17 0.50 664 927 7.73 1.00 0.15 0.50 LM5
----------------------------------------------------------------------------
ZKL5204 271.73 272.99 1.26 613 197 0.25 0.23 0.10 0.11 LM4W2
278.25 278.45 0.20 608 2,454 8.23 4.49 0.30 0.33 LM4w
363.36 363.60 0.24 534 3,086 7.23 3.01 0.46 0.23 LM4E
----------------------------------------------------------------------------
ZKL5005 118.58 119.50 0.92 762 194 0.75 0.29 0.09 0.08 LM3
326.39 327.24 0.85 612 120 1.09 0.13 0.06 0.03 LM4E
----------------------------------------------------------------------------
ZKL5801 95.02 95.24 0.22 801 408 1.18 0.50 0.20 0.07 LM6
158.23 159.09 0.86 781 525 1.35 2.23 0.07 0.07 LM5
----------------------------------------------------------------------------
ZKL5802 109.90 110.40 0.50 756 748 0.89 0.26 0.08 0.06 LM6E
216.51 216.91 0.40 683 771 7.77 0.29 0.26 0.58 LM5E
----------------------------------------------------------------------------
ZKL6201 198.18 199.82 1.64 693 661 5.20 0.55 0.03 0.13 LM5
Including 198.18 198.53 0.35 693 2,016 16.87 1.86 0.16 0.23
Including 199.22 199.82 0.60 692 503 3.70 0.27 less 0.16
than
0.10
----------------------------------------------------------------------------
ZKL5006 534.62 535.45 0.83 361 405 1.48 0.15 2.32 0.03 LM5W2
545.30 549.64 4.34 350 642 2.24 1.15 1.00 0.05 LM5W
Including 546.89 547.44 0.55 350 3,720 7.13 5.19 1.77 0.23
Including 548.66 549.33 0.67 348 609 2.66 1.40 4.51 0.04
----------------------------------------------------------------------------
ZKL6202 60.68 61.48 0.80 779 269 0.73 0.15 less 0.11 not
than named
0.10
170.98 171.58 0.60 684 151 0.54 0.18 less 0.02 LM6
than
0.10
----------------------------------------------------------------------------
ZKL5803 173.48 174.73 1.25 673 448 2.49 0.45 0.08 0.04 LM5W
Including 173.48 173.66 0.18 674 2,603 13.04 1.01 0.19 0.18
----------------------------------------------------------------------------
ZKL5803 195.07 195.42 0.35 654 179 0.39 0.14 0.00 0.02 LM5
341.93 342.21 0.28 521 588 1.96 0.15 0.56 0.05 LM5E
----------------------------------------------------------------------------
ZKL5205 112.31 113.26 0.95 746 142 0.28 0.21 less 0.03 LM1
than
0.10
521.97 522.09 0.12 372 131 0.37 0.48 less 0.04 LM6E
than
0.10
----------------------------------------------------------------------------
ZKL6204 71.65 71.93 0.28 807 999 7.82 19.50 0.01 0.54 LM6W
----------------------------------------------------------------------------
ZKL5206 547.39 548.05 0.66 332 314 0.53 0.61 7.95 0.04 LM6
Including 547.77 548.05 0.28 332 611 0.40 0.94 13.05 0.07
593.38 594.08 0.70 289 702 0.96 1.35 0.02 0.32 LM5W
Including 593.88 594.08 0.20 289 1,600 3.01 3.78 0.06 0.73
----------------------------------------------------------------------------
ZKL5207 239.31 240.18 0.87 682 153 1.10 0.27 0.01 0.01 not
named
----------------------------------------------------------------------------


Quality Control

Drill cores are in NQ size. Drill core samples, limited by apparent mineralization contact or shear/alteration contact, were split into halves by saw cutting. The half cores are stored in company's core shacks for future reference and checking, and the other half core samples are shipped in security sealed bags to four labs: the Analytical Lab of Henan Non-Ferrous Metals Geological and Exploitation Institute in Zhengzhou (Zhengzhou Lab), the Analytical Lab of the 6th Nonferrous Geo-exploration Team in Luoyang (Luoyang Lab), Henan province, the ALS-Chemex Lab in Guangzhou, Guangdong Province, and the SGS lab in Tianjin. All labs are officially accredited labs in China. Adopted analytical methods in the four labs are as follows:


Zhengzhou Lab and Luoyang Lab

The sample preparation consists of drying, crushing and splitting of the sample to 250 grams, and which is then pulverized to minus-200 mesh. Two-acid digestion and AAS finish are utilized on a 0.5-gram sample for lead and zinc. Titration is utilized as a modified process for higher grade materials. Silver is also analyzed using a two-acid digestion on a 0.5-gram sample and AA finish.


ALS Chemex

Sample is dried, crushed and split to a 250-gram subsample which is further pulverized to 85 per cent passing 200 mesh. Four-acid digestion and ICP-AES finish are utilized on a one-gram sample for analyzing silver, lead, zinc and copper. For samples containing more than 1,500 g/t silver, fire assay and gravimetric finish is utilized. Titration method is utilized as a modified process for samples with more than 10%Pb.


SGS Lab

Sample is dried, crushed and split to a 250-gram subsample which is further pulverized to 85 per cent passing 200 mesh. Fire assay and AAS finish are utilized for gold assay. Four-acid digestion and ICP-AES finish are used in analyzing silver, lead, zinc and copper.

A routine quality assurance/quality control procedure is adopted at each lab to monitor the analytical quality at the lab. Certified reference materials (CRM), pulp duplicates and blanks are inserted into each lab batch of samples. QA/QC data at the lab are attached to the assay certificates for each batch of samples.

The Company maintains a comprehensive quality assurance and quality control program to ensure best practice in sample preparation and analysis of the drill core samples. Project geologists regularly insert reference material samples (RMS) and blanks to each batch of core samples to monitor the sample preparation and analysis procedures at the labs. The analytical quality of the labs is further evaluated with external checks by sending about 3 per cent of the pulp samples to higher level labs to check for lab bias.

Data from both the company's and the labs' QA/QC programs are timely reviewed and evaluated by project geologists.

Rujin Jiang, P.Geo. Vice President of Exploration for the Company, is the Qualified Person on the project as defined under National Instrument 43-101. He has verified the information and has reviewed and approved the contents of this news release.


About Silvercorp Metals Inc.

Silvercorp Metals Inc. is engaged in the acquisition, exploration, development and mining of high-grade silver-related mineral properties in China and Canada. Silvercorp is the largest primary silver producer in China through the operation of the four silver-lead-zinc mines at the Ying Mining District in the Henan Province of China. Silvercorp recently acquired the XBG and XHP silver-gold-lead-zinc mines nearby the Ying Mining District in Henan Province, further consolidating the region. Silvercorp has commenced production at its second production foothold in China, the BYP gold-lead-zinc project in Hunan Province, and is currently constructing the mill and related facilities in preparation for mining at the GC silver-lead-zinc project in Guangdong Province. In Canada, Silvercorp is preparing an application for a Small Mine Permit for the Silvertip high grade silver-lead-zinc project in northern British Columbia. The Company's shares are traded on the New York Stock Exchange (symbol: SVM) and Toronto Stock Exchange (symbol: SVM) and are included as a component of the S&P/TSX Composite and the S&P/TSX Global Mining Indexes.


CAUTIONARY DISCLAIMER -- FORWARD LOOKING STATEMENTS


Certain of the statements and information in this press release constitute 'forward-looking statements' within the meaning of the United States Private Securities Litigation Reform Act of 1995 and 'forward-looking information' within the meaning of applicable Canadian provincial securities laws. Any statements or information that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as 'expects', 'is expected', 'anticipates', 'believes', 'plans', 'projects', 'estimates', 'assumes', 'intends', 'strategies', 'targets', 'goals', 'forecasts', 'objectives', 'budgets', 'schedules', 'potential' or variations thereof or stating that certain actions, events or results 'may', 'could', 'would', 'might' or 'will' be taken, occur or be achieved, or the negative of any of these terms and similar expressions) are not statements of historical fact and may be forward-looking statements or information. Forward-looking statements or information relate to, among other things: the price of silver and other metals; the accuracy of mineral resource and mineral reserve estimates at the Company's material properties; the sufficiency of the Company's capital to finance the Company's operations; estimates of the Company's revenues and capital expenditures; estimated production from the Company's mines in the Ying Mining Camp; timing of receipt of permits and regulatory approvals; availability of funds from production to finance the Company's operations; and access to and availability of funding for future construction, use of proceeds from any financing and development of the Company's properties.


Forward-looking statements or information are subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events or results to differ from those reflected in the forward-looking statements or information, including, without limitation, risks relating to: fluctuating commodity prices; calculation of resources, reserves and mineralization and precious and base metal recovery; interpretations and assumptions of mineral resource and mineral reserve estimates; exploration and development programs; feasibility and engineering reports; permits and licences; title to properties; First Nations title claims and rights; property interests; joint venture partners; acquisition of commercially mineable mineral rights; financing; recent market events and conditions; economic factors affecting the Company; timing, estimated amount, capital and operating expenditures and economic returns of future production; integration of future acquisitions into the Company's existing operations; competition; operations and political conditions; regulatory environment in China and Canada; environmental risks; foreign exchange rate fluctuations; insurance; risks and hazards of mining operations; key personnel; conflicts of interest; dependence on management; internal control over financial reporting as per the requirements of the Sarbanes-Oxley Act; and bringing actions and enforcing judgments under U.S. securities laws.


This list is not exhaustive of the factors that may affect any of the Company's forward-looking statements or information. Forward-looking statements or information are statements about the future and are inherently uncertain, and actual achievements of the Company or other future events or conditions may differ materially from those reflected in the forward-looking statements or information due to a variety of risks, uncertainties and other factors, including, without limitation, those referred to in the Company's Annual Information Form for the year ended March 31, 2011 under the heading 'Risk Factors'. Although the Company has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be as anticipated, estimated, described or intended. Accordingly, readers should not place undue reliance on forward-looking statements or information.


The Company's forward-looking statements and information are based on the assumptions, beliefs, expectations and opinions of management as of the date of this press release, and other than as required by applicable securities laws, the Company does not assume any obligation to update forward-looking statements and information if circumstances or management's assumptions, beliefs, expectations or opinions should change, or changes in any other events affecting such statements or information. For the reasons set forth above, investors should not place undue reliance on forward-looking statements and information.

Contacts:

Silvercorp Metals Inc.

Rui Feng

Chairman & CEO

(604) 669-9397 or Toll Free 1(888) 224-1881

(604) 669-9387 (FAX)


Silvercorp Metals Inc.

Lorne Waldman

Corporate Secretary

(604) 669-9397 or Toll Free 1(888) 224-1881

(604) 669-9387 (FAX)
info@silvercorp.ca
www.silvercorp.ca


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!




Mineninfo
Silvercorp Metals Inc.
Bergbau
A0EAS0
CA82835P1036
Minenprofile
Alle Angaben ohne Gewähr! Copyright © by GoldSeiten.de 1999-2024.
Die Reproduktion, Modifikation oder Verwendung der Inhalte ganz oder teilweise ohne schriftliche Genehmigung ist untersagt!

"Wir weisen Sie ausdrücklich auf unser virtuelles Hausrecht hin!"