Suche
 
Folgen Sie uns auf:

U3O8 Corp's Resource Drilling Returned 18m at 0.11% U3O8 at Aricheng West in the Kurupung Project

01.03.2012  |  Marketwired
Pending NI 43-101 to Add to Company's Rapidly Growing Resource Portfolio

TORONTO, ONTARIO -- (Marketwire) -- 03/01/12 -- U3O8 Corp. (TSX VENTURE: UWE), a Canadian-based company focused on exploration and resource expansion of uranium and associated commodities in South America, reports results from the final 32 holes completed in the resource drilling campaign on the Aricheng West structure in the Kurupung Batholith in Guyana (Figure 1). The National Instrument 43-101 ('NI 43-101') resource estimate on Aricheng West is expected to be released in March 2012.

'These infill drill results add to the mounting evidence that the Kurupung Project could host a large uranium system comparable in size to other albitite-hosted deposits such as Coles Hill in Virginia, Michelin in Labrador and Valhalla in Australia,' said Dr. Richard Spencer, U3O8 Corp's President and CEO. 'In the past year, we have dramatically increased our uranium resources in key projects in Colombia and Argentina, and the forthcoming NI 43-101 resource from the Kurupung will further contribute to U3O8 Corp's strong growth profile as we advance from a junior explorer to the ranks of a handful of mid-sized uranium companies.'


Table 1 - Assay Results for Aricheng West

Summary of significantly mineralized intercepts cut in the final 32 bore holes completed in the infill drilling program at Aricheng West (Figure 2).



----------------------------------------------------------------------------
Intercept Grade
---------------------------------------------------------------
Bore From To Interval Estimated True U3O8 U3O8
Hole (m) (m) (m) Thickness (m) (%) (lb/t)
----------------------------------------------------------------------------
ARW-075 No significant results
----------------------------------------------------------------------------
51 62 11 10.83 0.103 2.27
---------------------------------------------------------------
ARW-076 85 97 12 11.82 0.045 0.99
---------------------------------------------------------------
100 108 8 7.88 0.040 0.88
----------------------------------------------------------------------------
ARW-077 No significant results
----------------------------------------------------------------------------
ARW-078 8 12 4 2.41 0.053 1.16
----------------------------------------------------------------------------
ARW-079 36 45 9 5.79 0.061 1.35
---------------------------------------------------------------
68 72 4 2.57 0.091 1.99
----------------------------------------------------------------------------
ARW-080 No significant results
----------------------------------------------------------------------------
81 88 7 4.50 0.098 2.15
---------------------------------------------------------------
ARW-081 233 241 8 5.14 0.096 2.12
---------------------------------------------------------------
270 278 8 5.14 0.074 1.62
----------------------------------------------------------------------------
ARW-082 74 88 14 11.03 0.071 1.57
----------------------------------------------------------------------------
ARW-083 35 37 2 1.46 0.081 1.78
---------------------------------------------------------------
82 85 3 2.19 0.056 1.23
----------------------------------------------------------------------------
ARW-084 82 91 9 5.16 0.066 1.46
----------------------------------------------------------------------------
ARW-085 98 103 5 3.94 0.050 1.09
----------------------------------------------------------------------------
124 131 7 4.86 0.076 1.66
---------------------------------------------------------------
ARW-086 205 207 2 1.39 0.176 3.88
---------------------------------------------------------------
249 260 11 7.64 0.080 1.75
----------------------------------------------------------------------------
ARW-087 27 34 7 4.59 0.053 1.17
----------------------------------------------------------------------------
ARW-088 No significant results
----------------------------------------------------------------------------
ARW-089 158 164 6 3.53 0.040 0.87
---------------------------------------------------------------
260 264 4 2.35 0.054 1.18
----------------------------------------------------------------------------
ARW-090 89 95 6 3.86 0.124 2.72
----------------------------------------------------------------------------
ARW-091 No significant results
----------------------------------------------------------------------------
ARW-092 295 299 4 2.57 0.050 1.09
---------------------------------------------------------------
322 327 5 3.21 0.049 1.07
----------------------------------------------------------------------------
ARW-093 41 52 11 6.47 0.061 1.35
----------------------------------------------------------------------------
ARW-094 20 23 3 1.72 0.045 0.99
----------------------------------------------------------------------------
ARW-095 91 96 5 3.21 0.041 0.91
----------------------------------------------------------------------------
ARW-096 57 60 3 1.93 0.066 1.45
---------------------------------------------------------------
68 72 4 2.57 0.046 1.01
----------------------------------------------------------------------------
ARW-097 10 27 17 13.02 0.064 1.41
---------------------------------------------------------------
30 54 24 18.39 0.111 2.44
----------------------------------------------------------------------------
ARW-098 84 92 8 5.03 0.088 1.94
---------------------------------------------------------------
123 140 17 10.70 0.049 1.08
----------------------------------------------------------------------------
ARW-099 No significant results
----------------------------------------------------------------------------
ARW-100 No significant results
----------------------------------------------------------------------------
ARW-101 No significant results
----------------------------------------------------------------------------
ARW-102 153 158 5 2.72 0.080 1.76
----------------------------------------------------------------------------
ARW-103 No significant results
----------------------------------------------------------------------------
ARW-104 No significant results
----------------------------------------------------------------------------
ARW-105 No significant results
----------------------------------------------------------------------------
25 30 5 3.94 0.085 1.86
---------------------------------------------------------------
108 119 11 8.67 0.084 1.84
---------------------------------------------------------------
ARW-106 228 241 13 10.24 0.052 1.14
---------------------------------------------------------------
285 300 15 11.82 0.059 1.30
---------------------------------------------------------------
310 328 18 14.18 0.043 0.94
----------------------------------------------------------------------------

Note: lbs/t is an abbreviation for pounds per tonne.

Potential quantity and grade are based on drill results that define the approximate length, thickness, depth and grade of the target area, but are considered conceptual in nature. The drilling reported in this release constitutes infill drilling on the Aricheng West structure with the aim of defining a mineral resource. No mineral resource has been completed on the Aricheng West structure to date, and it is uncertain if further exploration will result in such target being delineated as a mineral resource.


Aricheng West Structure

Uranium at Aricheng West is concentrated in a set of near-vertical, sheet-like breccias that have an easterly trend that extends over one kilometre and is still open along strike. The principal mineralized structures correspond closely with corridors of low magnetism that extend beyond the area that has been drilled (Figure 2). Extensions to these weakly magnetic corridors constitute targets that will be ranked against other targets for future exploration drilling. Mineralization at Aricheng West extends from the near-surface saprolite, which averages 20 metres ('m') thick, to at least 340m below surface.


Quality Assurance & Quality Control

QA/QC procedures for Aricheng West are the same as those used in U3O8 Corp's exploration elsewhere in the Kurupung Project as described in the press release dated April 20, 2011, available on the company's web site at www.u3o8corp.com and on SEDAR at www.sedar.com.

Dr. Richard Spencer, President and CEO of U3O8 Corp., a Qualified Person within the definition of that term in NI 43-101 of the Canadian Securities Administrators, had overall responsibility for target and drill-site selection at the Aricheng West target. Dr. Spencer has supervised the preparation of, and verified, the technical information in this release.


About U3O8 Corp.

U3O8 Corp. is a Toronto-based exploration company, focused on exploration and resource expansion of uranium and associated commodities in South America - a promising new frontier for uranium exploration and development. U3O8 Corp. has one of the most advanced portfolios of uranium projects in the region comprising NI 43-101 compliant resources in Guyana, Argentina and Colombia.


Forward-Looking Statements

Certain information set forth in this news release may contain forward-looking statements that involve substantial known and unknown risks and uncertainties. These forward-looking statements are subject to numerous risks and uncertainties, certain of which are beyond the control of U3O8 Corp., including, but not limited to, the impact of general economic conditions, industry conditions, volatility of commodity prices, risks associated with the uncertainty of exploration results and estimates and that the resource potential will be achieved on exploration projects, currency fluctuations, dependence upon regulatory approvals, and the uncertainty of obtaining additional financing and exploration risk. There is no assurance that mineralization encountered at Aricheng West will add to U3O8 Corp's resource base. Readers are cautioned that the assumptions used in the preparation of such information, although considered reasonable at the time of preparation, may prove to be imprecise and, as such, undue reliance should not be placed on forward-looking statements.

To view 'Figure 1 - Multiple Uranium-Bearing Structures in the Kurupung Batholith,' please visit the following link: http://media3.marketwire.com/docs/u3o8_corp_mar01_figure01.pdf

To view 'Figure 2 - Drill Hole Locations at Aricheng West,' please visit the following link: http://media3.marketwire.com/docs/u3o8_corp_mar01_figure02.pdf

To view the image associated with this press release, please visit the following link: http://www.marketwire.com/library/20120229-u3o8_corp_mar01_img01.jpg

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.



Add to DiggBookmark with del.icio.usAdd to Newsvine



Contacts:

U3O8 Corp.
Nancy Chan-Palmateer
Vice President, Investor Relations
(416) 868-1491
nancy@u3o8corp.com

U3O8 Corp.
Richard Spencer
President & CEO
(416) 868-1491
richard@u3o8corp.com
www.u3o8corp.com
Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!




Mineninfo
Green Shift Commodities Ltd.
Bergbau
A3DT77
CA3933801001
Minenprofile
Alle Angaben ohne Gewähr! Copyright © by GoldSeiten.de 1999-2024.
Die Reproduktion, Modifikation oder Verwendung der Inhalte ganz oder teilweise ohne schriftliche Genehmigung ist untersagt!

"Wir weisen Sie ausdrücklich auf unser virtuelles Hausrecht hin!"