Lachlan Star Announces Record Gold Ounces Stacked in April Since Taking Ownership, Decision to Move to Owner Mining and Drill Results from its CMD Gold Mine Including 99m Grading 1.47 g/t Au
01.05.2012 | Marketwired
NOT FOR DISTRIBUTION TO UNITED STATES NEWSWIRE SERVICES OR FOR RELEASE, PUBLICATION, DISTRIBUTION OR DISSEMINATION DIRECTLY, OR INDIRECTLY, IN WHOLE OR IN PART, IN OR INTO THE UNITED STATES
PERTH, WESTERN AUSTRALIA -- (Marketwire - May 1, 2012) - Gold Miner, Lachlan Star Limited ("Lachlan or the Company") (TSX:LSA) (ASX:LSA) announces record gold ounces stacked in April since taking ownership, decision to move to owner mining and drill results from its CMD Gold Mine including 99m grading at 1.47g/t Au.
Gold Stacked During April
- Gold stacked of 6,000 ounces in April, a record under Lachlan Star ownership
- Ore mining resumed at both the Chisperos and Las Loas pits in the last week of April
- Average ore grade for April increased to 0.61g/t Au
Mining Strategy
- Evaluation of mining options results in Lachlan Star selecting owner mining as preferred mining method going forward
- Conditional purchase order placed for new 100t truck fleet and associated equipment
- Expected mining costs in the range of US$1.70-$1.80/t moved, a substantial saving over current costs
- Reduction in mining contractors from three to one completed to reduce unit rates from May onwards
- New mining strategy expected to deliver cash cost savings of US$100-US$150 per ounce
Tres Perlas Deposit Drill Results
- 16m grading 0.65 g/t Au from 30m downhole and 99m grading 1.47 g/t from 190m downhole in RCH 2012-52
- 62m grading 0.94 g/t Au from 228m downhole in RCH 2012-60
- Sampling of El Sauce waste dump return encouraging results including:
-- 30m grading 0.26 g/t Au from 10m downhole in RCH 2012-60
-- 20m grading 0.19 g/t Au from 0m downhole in RCH 2012-56
The full announcement can be viewed on the Company's website at www.lachlanstar.com.au and at the link below:
http://www.lachlanstar.com.au/images/LSA_April_Operations_Update_Final_010512.pdf.
Contact Information
Lachlan Star Limited
Sarah Beardmore
+61(8) 9481 0051
sarah.beardmore@lachlanstar.com.au
www.lachlanstar.com.au
PERTH, WESTERN AUSTRALIA -- (Marketwire - May 1, 2012) - Gold Miner, Lachlan Star Limited ("Lachlan or the Company") (TSX:LSA) (ASX:LSA) announces record gold ounces stacked in April since taking ownership, decision to move to owner mining and drill results from its CMD Gold Mine including 99m grading at 1.47g/t Au.
Gold Stacked During April
- Gold stacked of 6,000 ounces in April, a record under Lachlan Star ownership
- Ore mining resumed at both the Chisperos and Las Loas pits in the last week of April
- Average ore grade for April increased to 0.61g/t Au
Mining Strategy
- Evaluation of mining options results in Lachlan Star selecting owner mining as preferred mining method going forward
- Conditional purchase order placed for new 100t truck fleet and associated equipment
- Expected mining costs in the range of US$1.70-$1.80/t moved, a substantial saving over current costs
- Reduction in mining contractors from three to one completed to reduce unit rates from May onwards
- New mining strategy expected to deliver cash cost savings of US$100-US$150 per ounce
Tres Perlas Deposit Drill Results
- 16m grading 0.65 g/t Au from 30m downhole and 99m grading 1.47 g/t from 190m downhole in RCH 2012-52
- 62m grading 0.94 g/t Au from 228m downhole in RCH 2012-60
- Sampling of El Sauce waste dump return encouraging results including:
-- 30m grading 0.26 g/t Au from 10m downhole in RCH 2012-60
-- 20m grading 0.19 g/t Au from 0m downhole in RCH 2012-56
The full announcement can be viewed on the Company's website at www.lachlanstar.com.au and at the link below:
http://www.lachlanstar.com.au/images/LSA_April_Operations_Update_Final_010512.pdf.
Contact Information
Lachlan Star Limited
Sarah Beardmore
+61(8) 9481 0051
sarah.beardmore@lachlanstar.com.au
www.lachlanstar.com.au