Suche
 
Folgen Sie uns auf:

SAS reports significant results from the Ghost and Hislop North exploration programs

07.05.2012  |  CNW

TORONTO, May 7, 2012 /CNW/ - St Andrew Goldfields Ltd. (TSX-SAS) (OTCQX-STADF), ("SAS" or the "Company") is pleased to announce an update on its exploration programs on the Ghost Zone ("Ghost") near the Holt Mine, and the Hislop North Project ("Hislop North"), northwest of the Hislop Mine.

HIGHLIGHTS

Ghost Zone
GZ12-004:7.10 g/t Au over 2.9 metres
GZ12-006B:5.91 g/t Au over 9.8 metres
GZ12-011:4.93 g/t Au over 14.5 metres
Hislop North Project
H12-005:1.97g/t Au over 62.2 metres
  including 3.63 g/t Au over 10.5 metres and 5.10  g/t Au over 11.6 metres
H12-005:32.00g/t Au over 1.0 metre

Notes:
All lengths reported at the Ghost Zone are true width, all lengths reported at Hislop North are reported as core length as true width is not available at this time; all assays cut to 32.00 g/t Au

"We are happy to continue to report positive results from our regional exploration program", said Jacques Perron, President & CEO of SAS. "Ghost continues to return good grade over significant widths and the extension of the known zone of mineralization towards the old Mattawasaga zone is very promising. The Hislop North Project, although still in its early stages, has intersected very interesting values which we will continue to follow up on throughout 2012. "

Ghost Zone

Drilling at Ghost, located approximately 800 metres east of the Holt mine workings along the Ghostmount Fault Zone, continues to return significant grades and widths. An additional 18 holes have been completed on this zone which has increased the mineralized strike length to approximately 600 metres from the previously reported 300 metres (see press release dated February 1, 2012, available under the Company's profile on SEDAR at www.sedar.com or on the Company's website at www.sasgoldmines.com). The mineralization occurs in a strongly silicified and albitized mafic volcanic unit which runs sub parallel to the Ghostmount Fault. The higher gold values are associated with very fine disseminated pyrite in the 3 to 5% range.

Results from the recent round of drilling intersected similar grades and widths including GZ12-004 returning 7.10 g/t Au over 2.9 metres, GZ12-006B returning  5.91 g/t Au over 9.8 metres and GZ12-011 returning 4.93 g/t Au over 14.5 metres. GZ12-014 returned 3.82 g/t Au over 27.7 meters, including 4.49 g/t Au over 15.5 meters. GZ12-014 is in close proximity to the previously mined Mattawasaga Zone located approximately 500 metres to the west, and demonstrates the potential to expand the current zone of mineralization.

Drilling is continuing with two surface drills aimed at testing the east and west extensions along strike. Geological interpretation and modelling have been initiated, with anticipated results expected in the latter half of 2012.

Highlights of the recent drilling program are summarized in the table below:

Ghost Zone 2012 Surface Drilling Program
Hole
Number
Holt Mine GridDegreesIntersection (Metres)(Metres)Gold
Grade
(g/t)
EastingNorthingElevationAzimuthDipFromToCore
Length
True
Width
GZ12-0041241695105000332-67595.8599.03.22.97.10
GZ12-0051264395205000341-48512.7520.67.95.42.98
Including514.1515.11.00.711.19
GZ12-0051264395205000341-48529.6530.40.80.79.33
GZ12-006B1240195155000334-65535.4548.012.69.85.91
Including537.0540.73.73.310.05
GZ12-009B1225095505000327-69526.9536.19.25.83.89
GZ12-0111232595005000332-66566.7585.018.314.54.93
Including569.5570.51.00.814.34
Including582.0583.01.00.815.86
GZ12-0131241595075000326-66563.5571.07.56.15.28
GZ12-0131241595075000326-66573.5576.53.02.49.56
Including575.6576.50.90.724.69
GZ12-0131241595075000326-66579.0585.06.04.94.11
GZ12-0141210095405000328-70456.5484.227.717.83.82
Including456.5459.22.71.85.83
Including463.5479.015.510.24.49
Including482.0484.22.21.58.95
GZ12-0151232095385000331-62494.4502.58.15.44.17

Notes: Assays capped at 32.00 g/t Au

Hislop North Project

Drilling with one surface rig testing in proximity to the northern Hislop property boundary continues to return significant results. This is a structurally complex area as the Porcupine Destor Fault-Zone, the main structure in this region, turns southwards and splits into numerous splay faults. Several cross faults have also been identified in the immediate vicinity.

Since drilling commenced in the latter part of 2011 (see press release dated February 1, 2012, available under the Company's profile on SEDAR at www.sedar.com or on the Company's website at www.sasgoldmines.com), seven additional holes have been completed and all have intersected anomalous values. The most significant recent intersections were H12-003 which returned 1.97 g/t Au over 62.2 metres in a brecciated albitic mafic volcanic with significant quartz veining, as well as one high grade value in H12-005 which returned 108.00 g/t Au over 1.0 metre which was cut to 32.00 g/t Au. Expansion of the mineralization remains open in all directions and follow-up drilling to further define the zone will continue.

The highlights of the 2012 drilling program are summarized in the table below:

Hislop North Project 2011/2012 Drilling Program
Hole
Number
UTM (NAD27)DegreesIntersection (Metres)Core
Length
(Metres)
Gold
Grade
(g/t)
EastingNorthingElevationAzimuthDipFromTo
H11-0085518805371911290212-60157.5169.512.02.56
Including157.5166.59.03.05
H12-0015519755371911290260-50247.5249.01.52.41
H12-0025517765371911290260-50263.3264.20.92.81
H12-0035519365371850290260-5045.0107.262.21.97
Including45.055.510.53.63
Including85.597.111.65.10
H12-0035519365371850290260-50358.3359.31.09.15
H12-0045518805371960290260-50163.5166.02.52.64
H12-0045518805371960290260-50341.7349.78.01.10
H12-0055519505371900290212-6083.184.11.032.00
H12-0055519505371900290212-60124.9126.51.63.96
H12-0055519505371900290212-60294.2299.25.02.19
H12-0065518805371911290235-60157.0164.07.02.91
Including157.0158.01.08.81
Including158.0159.21.23.25
Including163.0164.01.07.42
H12-0065518805371911290235-60211.4212.10.73.78

Notes: All lengths are reported as core length as true width is not available at this time; Assays capped at 32.00 g/t Au

Drilling, Assaying and QA/QC

Surface drilling was completed by Orbit Garant. Analytical work for the Ghost Zone was performed by Laboratoire Expert Inc., an accredited lab in Rouyn-Noranda. Analytical work for the Hislop North Project was performed by SGS Canada Inc., in Toronto and Agat Labs Limited, in Mississauga, both accredited labs. SAS utilized a quality control/quality assurance program consisting of a number of sample standards and blanks that were inserted into the sample string, which represented approximately 5% of the total sample population.

Qualified Person

The exploration programs on the Company's various mineral properties are under the supervision of Craig Todd, P. Geo, the Company's Exploration Manager.  Mr Todd is a qualified person as defined by NI 43-101, and has reviewed and approved this news release.

About SAS

SAS (operating as "SAS Goldmines"), is a gold mining and exploration company with an extensive land package in the Timmins mining district, north-eastern Ontario, which lies within the Abitibi greenstone belt, the most important host of historical gold production in Canada.

SAS owns and operate the Holt, Holloway and Hislop mines and is forecasting 2012 production of between 90,000 - 100,000 ounces of gold. The Company is also advancing the Taylor Project and is conducting an aggressive exploration program across 120km of land straddling the Porcupine-Destor Fault Zone.

FORWARD-LOOKING INFORMATION

This news release contains forward-looking information and forward-looking statements (collectively, "forward-looking information") under applicable securities laws, concerning the Company's business, operations, financial performance, condition and prospects, as well as management's objectives, strategies, beliefs and intentions. Forward-looking information is frequently identified by such words as "may", "will", "plan", "expect", "estimate", "anticipate", "believe", "intend" and similar words referring to future events and results, including in respect of the  extent, timing, objectives and interpretation of exploration drilling programs to be conducted by the Company at the Ghost Zone and Hislop North Project.

This forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause actual results to differ materially from those expressed or implied by the forward-looking information. Factors that may cause actual results to vary materially include, but are not limited to, uncertainties relating to the interpretation of the geology, continuity, grade and size estimates of the mineral reserves and resources; the Company's dependence on key employees and changes in the availability of qualified personnel; fluctuations in gold prices and exchange rates; operational hazards and risks, including the inability to insure against all risks; changes in laws and regulations; and changes in general economic conditions. Such forward looking information is based on a number of assumptions, including in respect of the ability to achieve operating cost estimates, the level and volatility of the price of gold, the accuracy of reserve and resource estimates and the assumptions on which such estimates are based, the sufficiency of the Company's cash flows to achieve its planned programs and the ability to attract and retain adequate qualified personnel to conduct its exploration programs and operate its mines.  Should one or more risks and uncertainties materialize or should any assumptions prove incorrect, then actual results could vary materially from those expressed or implied in the forward-looking information. Accordingly, readers are cautioned not to place undue reliance on this forward-looking information. SAS does not assume the obligation to revise or update this forward-looking information after the date of this release or to revise such information to reflect the occurrence of future unanticipated events, except as may be required under applicable securities laws. A further description of the risks and uncertainties facing the Company may also be found in the Company's Annual Information Form available on SEDAR at www.sedar.com.

 

 

SOURCE St Andrew Goldfields Ltd.


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!




Mineninfo
St Andrew Goldfields Ltd.
Bergbau
-
-
Minenprofile
Alle Angaben ohne Gewähr! Copyright © by GoldSeiten.de 1999-2024.
Die Reproduktion, Modifikation oder Verwendung der Inhalte ganz oder teilweise ohne schriftliche Genehmigung ist untersagt!

"Wir weisen Sie ausdrücklich auf unser virtuelles Hausrecht hin!"