Suche
 
Folgen Sie uns auf:

Centamin PLC - Q2 Preliminary Production Results

10.07.2012  |  Marketwired

PERTH, AUSTRALIA -- (Marketwire) -- 07/10/12 --



For immediate release 10 July 2012



Centamin plc ("Centamin" or "the Company")
(LSE:CEY, TSX:CEE)

Q2 Preliminary Production Results


Centamin is pleased to announce its preliminary production results from
its Sukari Gold Mine ("Sukari") in Egypt for the quarter ended 30 June
2012.

Total gold production for the quarter was a record 67,422 ounces, a 40%
increase on the corresponding quarter in 2011 and a 37% increase on Q1
2012. Record production was achieved as a result of a strong
performance on all key operating metrics. Quarterly throughput in the
Sukari process plant was 1,269kt, a 49% increase on the corresponding
quarter in 2011 and a 24% increase on Q1 2012, as the plant delivered a
record quarter and continued to operate at and above the 5 million
tonne per annum run rate.

The open pit delivered total material movement of over 6,579kt and
underground ore production for the quarter increased to 117kt, a 63%
increase on Q1 2012 and a 172% increase on Q2 2011. With higher
material movements from the open pit, the run of mine ore stockpile
balance increased by 278kt to 497kt by the end of the quarter.



Q2 2012 Q1 2012 Q2 2011
(estimate)

Total Material Movement - Open Pit (kt)6,579 4,819 3,030
Underground Ore Production (kt) 117 72 43
Process Plant Throughput (kt) 1,269 1,020 850
Process Plant Productivity (tph) 652 656 472
Gold Produced (oz) 67,422 49,071 47,991



Josef El-Raghy, Chairman of Centamin, commented: "Our team at Sukari
has delivered a record quarter on tonnes mined from the underground and
tonnes processed through the plant. Open pit tonnes mined increased
significantly from Q1 as staged development in line with the optimised
mine plan announced in May opened up additional mining faces. We have
delivered our strongest operating quarter to date and remain on track
to deliver our full year production guidance of 250,000 ounces."

Notice of Results

Centamin will announce its full Q2 Results at 7am (GMT) on Tuesday 14
August 2012 via the Regulatory News Service of the London Stock
Exchange and Marketwire on the Toronto Stock Exchange. A webcast and
conference call with the Centamin management team will be held at 9am
(GMT) on the day of the Q2 results announcement and a second call will
be held at 2pm (GMT) and 9am (EST/NY) for North American analysts and
investors Q&A. Details of the webcast and conference call numbers will
be announced at the time of the Q2 results.



For more information please contact:
Centamin plc Buchanan
Josef El-Raghy, Chairman Bobby Morse / Cornelia Browne
/Gabriella Clinkard
+44 (0) 20 7569 1670 + 44 (0) 20 7466 5000




This information is provided by RNS
The company news service from the London Stock Exchange

END

Contacts:

RNS

Customer

Services

0044-207797-4400
Email Contact
http://www.rns.com


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!




Mineninfo
Centamin Plc
Bergbau
A1JPZ6
JE00B5TT1872
Minenprofile
Alle Angaben ohne Gewähr! Copyright © by GoldSeiten.de 1999-2024.
Die Reproduktion, Modifikation oder Verwendung der Inhalte ganz oder teilweise ohne schriftliche Genehmigung ist untersagt!

"Wir weisen Sie ausdrücklich auf unser virtuelles Hausrecht hin!"