Suche
 
Folgen Sie uns auf:

European Uranium Completes Metallurgical Drilling Program at Kuriskova Deposit, Slovakia

24.07.2012  |  Business Wire


European Uranium Resources Ltd. (EUU: TSX-V; TGPN: Frankfurt) has
completed its planned 3-hole drilling program to obtain samples for
further metallurgical testing from the Kuriskova uranium deposit.
Preliminary evaluation suggests that the program was successful in
obtaining sufficient sample weight at appropriate grade for testing as
part of the ongoing feasibility study.


Downhole gamma logging results from the first drill hole (LE-K-73) were
reported in an earlier news release dated June 26, 2012. Significant
downhole gamma logging results from the final two holes (LE-K-74 and
LE-K-75) together with summary of results from nearest previous holes
are presented here:

LE-K-74: 2.9 m @ 0.478% eU3O8,
including 0.5 m @ 1.847% eU
3O8.


The two nearest historic holes are:


Hole 1181 with 3.6 m @ 0 .143% eU3O8 at a distance
of 33 metres west of LE-K-74; and


LH-K-13A with 1.2 m@ 0.519% U3O8 at a distance of
30 metres northeast of LE-K-74

LE-K-75: 2.6 m @ 0.468% eU3O8,
including 0.8 m @ 1.212% eU
3O8.


The two nearest historic holes are:


Hole LH-K-14A with 3.0 m @ 1.454% U3O8 at a
distance of 18 metres north of Hole LE-K-75; and


Hole 1182 with 4.8 m @ 1.453% eU3O8 at a distance
of 20 metres northwest of Hole LE-K-75.


The April 2011, National Instrument 43-101 compliant resource estimate,
audited and approved by Tetra Tech, Inc., comprises an Indicated
Resource of 28.5 million pounds of U3O8 at a grade
of 0.555% U3O8 contained in 2.3 million tonnes and
an additional Inferred Resource of 12.7 million pounds of U3O8
at a grade of 0.185% U3O8 contained in 3.1 million
tonnes, at a cut-off of 0.05% U (see news release dated April 26, 2011).


The Company is continuing to advance critical-path aspects of a
feasibility study and environmental impact study for the Kuriskova
deposit. The metallurgical samples collected from the continuing drill
program will be tested by AREVA, a significant shareholder of European
Uranium, later in the summer and fall of 2012, as part of the company's
technical services agreement with AREVA. The objective is to optimize
the process flow sheet as described in the preliminary feasibility study.


The company continues to conduct surface exploration work on targets
within the Kuriskova license area, with the objective of defining drill
targets that could lead to expansion of the current resource.


Slovakia′s Prime Minister Robert Fico, elected in March 2012, continues
to publicly reinforce the message that nuclear power will be a main
energy source in Slovakia in the future. Construction of Slovakia′s
fifth nuclear power plant is expected to be completed and operational by
2020.


The Company continues its efforts to define the structure which allows
uranium production from Kuriskova to be developed for the benefit of
Slovakia′s energy future. This could be a production off-take
arrangement with Slovakia or a partnership with a Slovak entity.
Discussions have been ongoing since April on several levels.


Work programs for the recently acquired Swedish and Finland uranium
prospects have been designed and will be conducted in late summer and
fall of 2012.


The following is a complete tabulation of significant intersections from
the two holes reported above:


To view the table Kuriskova, Holes LE-K-74 and LE-K-75 Intersection,
please click on the following link: http://www.usetdas.com/images/europeanuraniumchart.png

Notes to table: Grade higher than 0.4 % eU3O8 is highlighted as
bold. The conversion factor for eU% to eU308 is 1.17924 and a
significant intersection is considered at cut off of 0.03% eU.


The drill hole location map is attached to this release.


Uranium grades presented in this news release are reported as eU3O8
percentages based on downhole radiometric logging. The logging was
performed by Koral SRO of Slovakia. Drill intercepts are reported as
drilled; true thicknesses have not yet been calculated. Quality control
and quality assurance are provided by Ravi Sharma (chartered
professional member, AusIMM, and registered professional, SME), European
Uranium's manager, resources and reserves, who is a qualified person as
defined by National Instrument 43-101 and has reviewed and approved the
technical disclosure contained in this news release.


EUROPEAN URANIUM RESOURCES LTD.

'Dusty Nicol'


Dorian L. (Dusty) Nicol, President and CEO


Neither the TSX Venture Exchange nor its Regulation Services Provider
(as that term is defined in the policies of the TSX Venture Exchange)
accepts responsibility for the adequacy or accuracy of this release.


Cautionary Statement:


This news release contains forward-looking statements that are based on
the Corporation's current expectations and estimates. Forward-looking
statements are frequently characterized by words such as 'plan',
'expect', 'project', 'intend', 'believe', 'anticipate', 'estimate',
'suggest', 'indicate' and other similar words or statements that certain
events or conditions 'may' or 'will' occur. Such forward-looking
statements involve known and unknown risks, uncertainties and other
factors that could cause actual events or results to differ materially
from estimated or anticipated events or results implied or expressed in
such forward-looking statements. Such factors include, among others: the
actual results of current exploration activities; conclusions of
economic evaluations; changes in project parameters as plans to continue
to be refined; possible variations in ore grade or recovery rates;
accidents, labour disputes and other risks of the mining industry;
delays in obtaining governmental approvals or financing; and
fluctuations in metal prices. There may be other factors that cause
actions, events or results not to be as anticipated, estimated or
intended. Any forward-looking statement speaks only as of the date on
which it is made and, except as may be required by applicable securities
laws, the Corporation disclaims any intent or obligation to update any
forward-looking statement, whether as a result of new information,
future events or results or otherwise. Forward-looking statements are
not guarantees of future performance and accordingly undue reliance
should not be put on such statements due to the inherent uncertainty
therein.


To view the drill hole location map titled 'Kriskova,2012, Metallurgical
Drilling Program?, please click on the following link:

http://www.usetdas.com/images/europeanuraniummap.jpg

European Uranium Resources Ltd.

Doris Meyer

(604)
536-2711

www.euresources.com



Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!




Mineninfo
Azarga Metals Corp.
Bergbau
A3EMCV
CA05478A2083
Minenprofile
Alle Angaben ohne Gewähr! Copyright © by GoldSeiten.de 1999-2024.
Die Reproduktion, Modifikation oder Verwendung der Inhalte ganz oder teilweise ohne schriftliche Genehmigung ist untersagt!

"Wir weisen Sie ausdrücklich auf unser virtuelles Hausrecht hin!"