Suche
 
Folgen Sie uns auf:

Orestone Mobilizes Equipment to Captain Project

14.11.2012  |  Marketwired

VANCOUVER, BRITISH COLUMBIA -- (Marketwire) -- 11/14/12 -- Orestone Mining Corp. (TSX VENTURE: ORS) (the "Company") is pleased to report that manpower and equipment have been mobilized to the Captain Project in preparation for drilling. The 100% owned Captain project is located 43 kilometers north of Fort St. James, British Columbia and approximately 30 kilometers south of the Mt. Milligan copper-gold deposit. The Mt. Milligan deposit has proven and probable reserves of 532 Mt grading 0.20% copper and 0.38 g/t gold (Thompson Creek Metals website) and is currently under construction by Thompson Creek Metals Company Inc. as a large open pit mine and processing facility.


In preparation for drilling we will be cutting in approximately one kilometer of roads, building drill pads and organizing the drill core cutting and logging facilities near Fort St. James. The project area features relatively flat terrain, moderate tree cover and an extensive network of logging and Forest Service roads suitable for exploration all year.


The project hosts a large copper/gold porphyry system measuring seven by seven kilometers that remains open to the east and west. Over this immense area one of the four diamond drill holes completed on the East Target Area intercepted gold- copper similar in tenor to that of the Mt. Milligan deposit: drill hole C11-01 intercepted 87 metres grading 0.23 g/t gold and 0.03 % copper; including 43 metres grading 0.298 g/t gold and 0.09 % copper; as well as 16 metres grading 0.434 g/t gold and 0.133% copper (See Company news release dated February 23, 2012).


The Company has all permits in place to facilitate the next several phases of exploration; 30 line kilometers of geophysics and 38 sites approved for drilling by the B.C. Ministry of Energy and Mines.


Orestone is well financed, has recently discovered the above described large copper/gold porphyry system on the 100% owned Captain Project and is seeing increased interest in the Stewart Mining Camp where the Company's 50 square kilometer Todd Creek (51%) asset is located.


ON BEHALF OF ORESTONE MINING CORP.


David Hottman, President and CEO


Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this News Release. This news release has been prepared by management and no regulatory authority has approved or disapproved the information contained herein.

Contacts:

Orestone Mining Corp.

David Hottman

President & CEO

604-629-1929
info@orestone.ca
www.orestone.ca


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!




Mineninfo
Orestone Mining Corp.
Bergbau
A2DWW7
CA6861543032
Minenprofile
Alle Angaben ohne Gewähr! Copyright © by GoldSeiten.de 1999-2024.
Die Reproduktion, Modifikation oder Verwendung der Inhalte ganz oder teilweise ohne schriftliche Genehmigung ist untersagt!

"Wir weisen Sie ausdrücklich auf unser virtuelles Hausrecht hin!"