Suche
 
Folgen Sie uns auf:

Huldra Silver Announces That It Has Received US$2,228,043 From Smelter Payments and Provides an Update on the Status of the Merritt Mill and the Treasure Mountain Mine, British Columbia, Canada

01.03.2013  |  Marketwired

VANCOUVER, BRITISH COLUMBIA -- (Marketwire) -- 03/01/13 -- Huldra Silver Inc. ("Huldra" or the "Company") (TSX VENTURE: HDA) is pleased to announce it has received US$2,228,043 in smelter payments since it began shipping concentrates in November 2012. The Company is also pleased to provide an update on the Merritt Mill and the Treasure Mountain Mine, British Columbia, Canada.


The Company continues to see significant monthly increases in production and shipments of concentrates. Since the modifications made to the crushing circuit and screening of mill feed announced on February 5, 2013, 55.1 dry metric tonnes of lead/silver concentrate and 53.9 dry metric tonnes of zinc concentrate were shipped to the smelter for the first lot period of the month, being February 1 to February 15, 2013. The Company has received 85% provisional payments for the first lot period totaling US$445,061 plus HST. In the second lot period, being February 15 to 27, 2013, an estimated 96 dry metric tonnes of lead/silver concentrate and 58 dry metric tonnes of zinc concentrate were shipped to the smelter. Once the 85% provisional payments for the second lot period have been received, a February provisional monthly total will be released. The total smelter payments received up to and including the first lot period are US$2,228,043, including all provisional payments and any final payments received to date. All payments are made pursuant to the previously announced concentrate purchase agreements. Provisional payments are based on the best available information at the time of invoicing. Final payments are subject to adjustment based on independent assay results and metal prices.


The Company continues to make adjustments to the mill equipment and processes to maximize metallurgical recovery and throughput. Since the last update, the gravel screening plant allowed for a significant increase in throughput. Permanent adjustments to the crushing circuit have also been implemented to deal with higher moisture content. We expect that the temporary screening can be discontinued in the near future due to the permanent changes that have been implemented. There are still minor modifications and adjustments being made to the equipment and processing that requires brief stoppages. However, the total utilization of the mill continues to increase and we expect monthly production of concentrates will continue to increase. The Company expects to announce commercial production in the first quarter of 2013.


To date, a total of 18,000 tonnes of mill feed has been transferred from the Treasure Mountain Mine to the Merritt Mill site. The Company is currently trucking approximately 185 tonnes per day from the stockpiled mill feed from level 1, stope 1, and once that is completed, the Company will begin hauling mill feed from the level 1, stope 3.


The underground drill program is planned to commence by March 15, 2013. Two diamond drill platforms totaling 174m in size have been constructed. A drill contract for the 4,400m underground diamond drill program has been signed.


The Company has completed 150m of raise and bulkhead development for upcoming mining of level 1, stope 2, which is the third stope to be mined from the uppermost level of the mine. Development of the drawpoints for stope 2 is complete, with 78 metres of drawpoints completed. The first lift of mining within stope 2 has already been drilled in preparation for production. Based on current development rates, Huldra expects to commence mining of stope 2 on or around March 6, 2013.


Information in this news release, related to the underground diamond drill program, has been approved by Mark Williams, P. Geo. Information in this news release related to mining activities has been approved by Al Beaton, P. Eng and Mine Manager. For more information about the Company's Treasure Mountain Property, see the technical report entitled "Technical Report, Project Update, Treasure Mountain Property" dated June 7, 2012, available under Huldra's profile on SEDAR at www.sedar.com.


About Huldra


Huldra is currently mining at its Treasure Mountain Project, located three hours east of Vancouver, BC, utilizing an offsite mill for processing mill feed at the Company's property outside of Merritt, BC. The Company is also actively assessing other opportunities for acquisition and development.


On behalf of the Board of Directors


Ryan Sharp, MBA, President, CEO & Director


Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Contacts:

Huldra Silver Inc.

Ryan Sharp

President, CEO & Director

604-647-0142

604-647-0143 (FAX)
ryan@huldrasilver.com or IR@huldrasilver.com
www.huldrasilver.com


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!




Mineninfo
Nicola Mining Inc.
Bergbau
A14T7S
CA65405R1047
Minenprofile
Alle Angaben ohne Gewähr! Copyright © by GoldSeiten.de 1999-2024.
Die Reproduktion, Modifikation oder Verwendung der Inhalte ganz oder teilweise ohne schriftliche Genehmigung ist untersagt!

"Wir weisen Sie ausdrücklich auf unser virtuelles Hausrecht hin!"