Suche
 
Folgen Sie uns auf:

Bralorne Gold Mines Ltd.: Drifting on New Vein Discovery Averages 40.6 g/t Gold Over 0.24 Meters

25.03.2013  |  Marketwired
VANCOUVER, BRITISH COLUMBIA -- (Marketwire) -- 03/25/13 -- Bralorne Gold Mines Ltd. (TSX VENTURE: BPM) (OTCQX: BPMSF) (BERLIN: GV7) (FRANKFURT: GV7) (the "Company") provides the following update of results at the Bralorne mine project located near Gold Bridge, British Columbia, where the Company is exploring and building a new gold mining operation.


M VEIN DISCOVERY

Underground development was completed in February to explore the "M Vein" that was discovered in surface drill hole SB11-021, which intersected 1282.8 grams gold per tonne (37.4 ounce gold per ton) over 0.5 metres (1.5 feet) estimated true thickness. A new incline driven 60 metres from the BK3 workings passed 6 metres below the drill hole intercept and intersected a new gold-quartz vein on February 14. Sub-level drifting is now underway along the vein, with a total of 36 metres completed to date.

The vein is generally well-mineralized with disseminated and bands of visible gold, similar to the high grade mineralization seen in the surface drill hole intercept. Channel sample results received to date range up to 321.0 grams gold per tonne and average 74.5 grams gold per tonne (2.17 ounce per ton) uncut, or 45.6 grams gold per tonne (1.33 ounce per ton) with high assays cut to 98.3 grams per tonne. The vein averages 0.5 metres (0.8 feet) in thickness over the sampled strike length of 20 meters. Raising is now planned to explore the vein up dip and through the high grade drill hole intersection.

This new zone of gold mineralization is an added bonus for the BK3 area since it was not included in the resource inventory in the Preliminary Economic Assessment report completed in 2012. The discovery is a classic example of how additional mineralization is typically discovered during underground development in gold-quartz veins deposits.


ON BEHALF OF THE BOARD

William Kocken
Chief Executive Officer



This release contains statements that are forward-looking statements and are subject to various risks and uncertainties concerning the specific factors disclosed under the heading "Risk Factors" and elsewhere in the Company's periodic filings with Canadian securities regulators. Such information contained herein represents management's best judgment as of the date hereof based on information currently available. The Company does not assume the obligation to update any forward-looking statement.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.




Contacts:

Bralorne Gold Mines Ltd.
William Kocken, Chief Executive Officer
604.682.3701
604.682.3600 (FAX)
ir@bralorne.com
www.bralorne.com
Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!




Mineninfo
Bralorne Gold Mines Ltd.
Bergbau
-
-
Minenprofile
Alle Angaben ohne Gewähr! Copyright © by GoldSeiten.de 1999-2024.
Die Reproduktion, Modifikation oder Verwendung der Inhalte ganz oder teilweise ohne schriftliche Genehmigung ist untersagt!

"Wir weisen Sie ausdrücklich auf unser virtuelles Hausrecht hin!"