VANCOUVER, BRITISH COLUMBIA--(Marketwired - Oct 15, 2013) - Avino Silver & Gold Mines Ltd. ("Avino" or "the Company") (TSX VENTURE:ASM)(NYSE MKT:ASM)(FRANKFURT:GV6) is pleased to announce the Q3 and September 2013 production results from its San Gonzalo Mine and the Avino Mine surface stockpile operations located on the Avino property near Durango, Mexico.
Production numbers from Q3 2013 compared to Q2 2013 are presented below:
Q2 2013 | Q3 2013 | % Change | |
Total Silver Produced (oz) calculated | 175,166 | 178,651 | 1.99 |
Total Gold Produced (oz) calculated | 786 | 869 | 10.6 |
"I am very pleased with this quarter's results, as they continue to demonstrate the consistency and reliability of our operation. I would like to thank both our mine and front office staff for their continued hard work and dedication. We have now been in commercial production at San Gonzalo for a full year and remain committed to our objectives of mine optimization, cost reduction and increased production."
- David Wolfin, President, CEO & Director, Avino Silver & Gold Mines Ltd.
September production from San Gonzalo and the Avino Mine surface stockpiles are presented below:
Days of Operation | Total Mill Feed (metric tonnes) | Feed Grade Silver (g/t) | Feed Grade Gold (g/t) | Recovery Silver (%) | Recovery Gold (%) | Total Silver Produced (oz) Calculated | Total Gold Produced (oz) Calculated | Total Silver Eq. Produced (oz) Calculated | YTD Silver Eq. Produced Calculated | |
San Gonzalo (Circuit 1) | 29 | 6,301 | 277 | 1.27 | 83 | 75 | 46,579 | 192 | 59,073 | 558,858 |
Avino Mine Surface Stock Piles (Circuit 2) | 29 | 6,583 | 85 | 0.85 | 67 | 53 | 12,129 | 95 | 18,329 | 85,849 |
12,884 | 58,708 | 287 | 77,402 | 644,707 |
Silver equivalent was calculated using a 65:1 ratio for silver to gold. Mill production figures have not been reconciled and are subject to adjustment with concentrate sales. Year-to-date and calculated figures may not add up due to rounding.
San Gonzalo
Production numbers from July through September 2013 at San Gonzalo, as well as 2013 yearly totals are reported as follows:
July-13 | Aug-13 | Sept-13 | Monthly Change % | YTD SG | ||
Total Mill Feed (dry tonnes) | 6,372 | 6,678 | 6,301 | (5.6 | ) | 59,061 |
Average Daily Throughput (tpd) | 212 | 223 | 217 | (2.7 | ) | 224 |
Days of Operation | 30 | 30 | 29 | (3.3 | ) | 263 |
Feed Grade Silver (g/t) | 285 | 283 | 277 | (2.1 | ) | 290 |
Feed Grade Gold (g/t) | 1.31 | 1.51 | 1.27 | (15.9 | ) | 1.29 |
Bulk Concentrate (dry tonnes) | 207 | 200 | 203 | 1.5 | 1,815 | |
Bulk Concentrate Grade Silver (kg/t) | 7.25 | 7.99 | 7.15 | (10.5 | ) | 7.79 |
Bulk Concentrate Grade Gold (g/t) | 29.6 | 37.5 | 29.5 | (21.3 | ) | 30.5 |
Recovery Silver (%) | 82 | 85 | 83 | (2.4 | ) | 83 |
Recovery Gold (%) | 73 | 75 | 75 | 0 | 73 | |
Mill Availability (%) | 91.8 | 96.0 | 97.7 | 1.8 | 95.7 | |
Total Silver Produced (kg) | 1,497 | 1,602 | 1,449 | (9.6 | ) | 14,143 |
Total Gold Produced (g) | 6,111 | 7,514 | 5,979 | (20.4 | ) | 55,328 |
Total Silver Produced (oz) calculated | 48,131 | 51,505 | 46,579 | (9.6 | ) | 454,718 |
Total Gold Produced (oz) calculated | 196 | 242 | 192 | (20.4 | ) | 1,779 |
Total Silver Equivalent Produced (oz) | 60,903 | 67,208 | 59,073 | (12.1 | ) | 558,858 |
Silver equivalent was calculated using a 65:1 ratio for silver to gold. Mill production figures have not been reconciled and are subject to adjustment with concentrate sales. Year-to-date and calculated figures may not add up due to rounding.
September Highlights
- Silver and gold production in September was lower than in August mainly due to the lower grade of the material treated.
- Tonnage processed was also lower due to one less operating day even though mill availability was improved.
- There was no change in the gold recovery; silver recovery was slightly lower due to the lower grade feed treated.
Circuit 2 - Avino Mine Stock Piles
Circuit 2's production numbers from April through September are presented below, as well as yearly totals:
Apr 2013 | May 2013 | June 2013 | July 2013 | Aug 2013 | Sept 2013 | Monthly Change % | YTD 2013 | ||
Total mill feed - (dry tonnes) | 4,040 | 5,917 | 6,324 | 5,922 | 5,774 | 6,583 | 14.0 | 34,560 | |
Days of Operation | 19 | 30 | 29 | 30 | 28 | 29 | 3.6 | 165 | |
Feed grade Silver - g/t | 73 | 84 | 78 | 89 | 78 | 85 | 9.0 | 82 | |
Feed grade Gold - g/t | 0.79 | 0.70 | 0.84 | 0.83 | 0.63 | 0.85 | 34.9 | 0.78 | |
Bulk concentrate - (dry tonnes) | 49.84 | 66.05 | 84.42 | 80.52 | 48.53 | 80.99 | 66.9 | 410.35 | |
Bulk Concentrate Grade Silver (kg/t) | 3.977 | 4.833 | 3.509 | 4.310 | 5.865 | 4.658 | (20.6 | ) | 4.442 |
Bulk Concentrate Grade Gold (g/t) | 35.30 | 32.19 | 32.20 | 32.74 | 38.11 | 36.63 | (3.9 | ) | 34.25 |
Recovery Silver (%) | 67 | 64 | 60 | 66 | 63 | 67 | 6.3 | 65 | |
Recovery Gold (%) | 55 | 51 | 51 | 54 | 51 | 53 | 3.9 | 52 | |
Mill availability (%) | 63 | 83 | 96 | 87 | 84 | 97 | 15.5 | 90 | |
Total Silver Produced (oz) calculated | 6,373 | 10,264 | 9,525 | 11,156 | 9,151 | 12,129 | 32.5 | 58,599 | |
Total Gold Produced (oz) calculated | 57 | 68 | 87 | 85 | 59 | 95 | 61 | 452 | |
Total Silver Eq. Produced (oz) calculated | 9,484 | 14,023 | 14,332 | 16,665 | 13,016 | 18,329 | 40.8 | 85,849 | |
Silver equivalent for April through June was calculated using a 55:1 ratio for silver to gold, for the months of July, August and September a 65:1 ratio was used. (The ratio was changed to reflect more current gold and silver prices.) Mill production figures have not been reconciled and are subject to adjustment with concentrate sales. Year-to-date and calculated figures may not add up due to rounding. |
September Highlights
- Silver and gold production in September increased significantly compared to August due to the higher volume of tonnage processed, plant availability, and slightly better feed grades and recoveries.
- Concentrate grades were down slightly.
Mine Update
At San Gonzalo, underground mine development is ongoing. The ramp from level 5 to level 6 has 55 metres remaining before the elevation of level 6 is reached; another 20 metres of crosscut remain until the vein on level 6 is intersected. The larger pumps and 6 inch pipes ordered to remove the excess water inflows in the ramp have been installed and are operating. Delays in the ramp advance have now been resolved.
The extraction drift to the northwest on level 5 is almost complete with 3 draw points remaining.
During the month, 6 truckloads of San Gonzalo concentrates weighing 214 wet metric tonnes and 2 truckloads of Avino stockpile concentrate weighing 59 tonnes were shipped to Manzanillo.
Avino is also pleased to report it has signed a long-term agreement for the sale of the San Gonzalo concentrates. Terms are significantly better than the existing contract that expired last month. The new agreement lasts until the end of 2014.
Quality Assurance/Quality Control
Mill assays are performed at the mine's on-site lab. Check samples are verified by Inspectorate Labs in Reno, Nevada. San Gonzalo concentrate shipments are assayed at AH Knight in Manzanillo, Mexico. The Avino stockpile concentrate shipments are assayed at LSI in Rotterdam, Netherlands.
Qualified Person(s)
Avino's projects are under the supervision of Chris Sampson, P.Eng, BSc, Avino Consultant and Mr. Jasman Yee P.Eng, Avino director. Both of whom are qualified persons within the context of National Instrument 43-101. The qualified persons have reviewed and approved the technical data in this news release.
About Avino
Avino's mission is to create shareholder value through profitable organic growth at the Avino property. We are committed to managing all business activities in an environmentally responsible and cost-effective manner while contributing to the well-being of the community in which we operate.
Management remains focused on the following key objectives:
- Maintain profitable mining operations at San Gonzalo while decreasing operating costs and improving efficiency;
- Develop the Avino mine for mineral production;
- Continue to review and develop plans to process the oxide tailings resource from previous milling operations (PEA issued in 2012);
- Continue to explore regional targets on the property and consider acquisition opportunities.
ON BEHALF OF THE BOARD
David Wolfin, President & CEO
Avino Silver & Gold Mines Ltd.
Safe Harbor Statement - This news release contains "forward-looking information" and "forward-looking statements" (together, the "forward-looking statements") within the meaning of applicable securities laws and the United States Private Securities Litigation Reform Act of 1995, including our belief as to the extent and timing of various studies including the PEA, and exploration results, the potential tonnage, grades and content of deposits, timing and establishment and extent of resources estimates. These forward-looking statements are made as of the date of this news release and the dates of technical reports, as applicable. Readers are cautioned not to place undue reliance on forward-looking statements, as there can be no assurance that the future circumstances, outcomes or results anticipated in or implied by such forward-looking statements will occur or that plans, intentions or expectations upon which the forward-looking statements are based will occur. While we have based these forward-looking statements on our expectations about future events as at the date that such statements were prepared, the statements are not a guarantee that such future events will occur and are subject to risks, uncertainties, assumptions and other factors which could cause events or outcomes to differ materially from those expressed or implied by such forward-looking statements.
Such factors and assumptions include, among others, the effects of general economic conditions, the price of gold, silver and copper, changing foreign exchange rates and actions by government authorities, uncertainties associated with legal proceedings and negotiations and misjudgments in the course of preparing forward-looking information. In addition, there are known and unknown risk factors which could cause our actual results, performance or achievements to differ materially from any future results, performance or achievements expressed or implied by the forward-looking statements. Known risk factors include risks associated with project development; the need for additional financing; operational risks associated with mining and mineral processing; fluctuations in metal prices; title matters; uncertainties and risks related to carrying on business in foreign countries; environmental liability claims and insurance; reliance on key personnel; the potential for conflicts of interest among certain of our officers, directors or promoters of with certain other projects; the absence of dividends; currency fluctuations; competition; dilution; the volatility of the our common share price and volume; tax consequences to U.S. investors; and other risks and uncertainties. Although we have attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. We are under no obligation to update or alter any forward-looking statements except as required under applicable securities laws.
Cautionary Note to United States Investors - The information contained herein and incorporated by reference herein has been prepared in accordance with the requirements of Canadian securities laws, which differ from the requirements of United States securities laws. In particular, the term "resource" does not equate to the term "reserve". The Securities Exchange Commission's (the "SEC") disclosure standards normally do not permit the inclusion of information concerning "measured mineral resources", "indicated mineral resources" or "inferred mineral resources" or other descriptions of the amount of mineralization in mineral deposits that do not constitute "reserves" by SEC standards, unless such information is required to be disclosed by the law of the Company's jurisdiction of incorporation or of a jurisdiction in which its securities are traded. U.S. investors should also understand that "inferred mineral resources" have a great amount of uncertainty as to their existence and great uncertainty as to their economic and legal feasibility. Disclosure of "contained ounces" is permitted disclosure under Canadian regulations; however, the SEC normally only permits issuers to report mineralization that does not constitute "reserves" by SEC standards as in place tonnage and grade without reference to unit measures.
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Contact
Avino Silver & Gold Mines Ltd.
David Wolfin
President & CEO
604.682.3701
604.682.3600
ir@avino.com
www.avino.com