MONT-ST-HILAIRE, QUEBEC--(Marketwired - Aug 25, 2014) - Mr. Renaud Hinse, President and Chief Executive Officer of Abcourt Mines Inc. (TSX VENTURE:ABI)(BERLIN:AML)(FRANKFURT:AML) (the "Company") is pleased to announce that substantial progress was made in mine development at the Elder gold mine in the July 2013 - June 2014 period. This gold mine is located near Rouyn-Noranda, in Abitibi, Quebec, Canada.

Since the beginning of the mine development period in May 2013, 46 500 tonnes of mineralized material were extracted from the mine and 43,346 tonnes were treated at the Aurbec mill. At the end of the period, there were 3,000 tonnes of mineralization stockpiled in part at the mine and in part at the mill. The treated material had a grade of 4.90 grams of gold per tonne.

At the mill, 6,618.8 ounces of gold and 2,768.3 ounces of silver were recovered. Gold was sold at an average price of CAN$1,380 per ounce and silver was sold at an average price of CAN$ 21.72 per ounce. The proceeds from the sales totaled CAN$ 9,192,191, for an average of $ 212.06 per tonne of mineralization.

On the 8th level, the exploration drift to the west outlined a narrow zone of mineralization with an average of 6.66 grams of gold per tonne over an average width of 1.28 meter for a distance of 20 meters. In the last face of the drift, a 0.4-meter vein with a grade of 50.16 grams of gold per tonne, was exposed and in the roof of the drift, another band of mineralization with an average grade of 5.59 grams of gold per tonne over a width of 1.83 meter and a length of 20 meters was found. The drift will be extended to find the extension of these veins. Stoping will start when the full extent of these veins will be known.

In the three stopes that we have on the 7th level, we have found additional gold mineralization in the roof and in the floor of stopes. These stopes were expected to have a height of 2 to 3 meters, but in some places, we have found as much as 7 meters of mineralization. This additional mineralization will eventually be reflected in a revised calculation of resources. However, because of the additional height in stopes, we had to re-inforce the pillars and this work had the effect of retarding the production in these stopes during the April - June 2014 quarter. During this quarter, 7,470 tonnes were extracted from the mine, compared to the 12,500 tonnes extracted in the previous quarter. This decrease in production was only temporary. Things are back to normal and we will add a second shift soon to increase production.

We continue to use the Aurbec mil to treat our mineralization and the latter will be available until October. Meanwhile, we have negotiated an agreement with another company to treat our mineralization for the September 2014 - March 2015 period. Morever, we are looking for a mill to purchase.

We are satisfied with the progress made in the July 2013 - June 2014 period and we expect to reach full production (12,500 tonnes / month) at the end of calendar 2014.

About Abcourt Mines Inc.

Abcourt Mines Inc. is an exploration and development company with strategically located properties in northwestern Quebec, Canada. The Elder Mine with 43-101 gold resources, the Abcourt-Barvue Project with 43-101 silver-zinc ore reserves and resources and the Aldermac property with historical copper-zinc resources are all former producers. Abcourt is now focused on bringing the Elder and Abcourt-Barvue projects back into production with Elder as the first priority. At the same time, the Company is working on other projects (Aldermac, Vezza, Jonpol and Vendome) to increase its mineral resources inventory. A 43-101 resource calculation was completed in July, 2012, for the Elder Mine. A positive PEA report was prepared on Elder mine in the Fall of 2012 by Roche Limited, Consulting Group. A positive 43-101 feasibility study was completed by GENIVAR in 2007 on the Abcourt-Barvue Project. In addition, mill equipment was purchased. To know more about Abcourt, please visit our web site at www.abcourt.com and SEDAR.

FORWARD-LOOKING STATEMENTS: Certain of the information contained in this news release may contain "forward-looking information". Forward-looking information and statements may include, among others, statements regarding the future plans, costs, objectives or performance of Abcourt Mines Inc. (the "Company"), or the assumptions underlying any of the foregoing. In this news release, words such as "may", "would", "could", "will", "likely", "believe", "expect", "anticipate", "intend", "plan", "estimate" and similar words and the negative form thereof are used to identify forward-looking statements. Forward-looking statements should not be read as guarantees of future performance or results, and will not necessarily be accurate indications of whether, or the times at or by which, such future performance will be achieved. Forward-looking statements and information are based on information available at the time and/or management's good-faith belief with respect to future events and are subject to known or unknown risks, uncertainties, assumptions and other unpredictable factors, many of which are beyond the Company's control. These risks, uncertainties and assumptions include, but are not limited to, those described under "Risk Factors" in the Company's amended and restated annual information form dated May 11, 2012 and could cause actual events or results to differ materially from those projected in any forward-looking statements. The Company does not intend, nor does the Company undertake any obligation, to update or revise any forward-looking information or statements contained in this news release to reflect subsequent information, events or circumstances or otherwise, except if required by applicable laws.

This press release was prepared by Mr. Renaud Hinse, a qualified person, President of Abcourt Mines Inc.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.



Contact

Renaud Hinse, President and CEO
819 768-2857 / 450 446-5511
819 768-5475 / 450 446-3550
rhinse@abcourt.com


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!




Mineninfo
Abcourt Mines Inc.
Bergbau
862198
CA00288E3005
Minenprofile
Alle Angaben ohne Gewähr! Copyright © by GoldSeiten.de 1999-2024.
Die Reproduktion, Modifikation oder Verwendung der Inhalte ganz oder teilweise ohne schriftliche Genehmigung ist untersagt!

"Wir weisen Sie ausdrücklich auf unser virtuelles Hausrecht hin!"