Suche
 
Folgen Sie uns auf:

Highbank- Swamp Point North Site Update

30.09.2014  |  Marketwired

VANCOUVER, BC--(Marketwired - September 30, 2014) - Highbank Resources Ltd. (the "Company") (TSX VENTURE: HBK) (FRANKFURT: V7O).

President, Victor N. Bryant updates, onsite inspection September 23, 2014.

Swamp Point North Barge loading Facility?.
Transportation of the pilings from the Port of Prince Rupert was received at Swamp Point North on Tuesday, September 23, 2014. Over one-half of the pilings required for the load-out facility have now been installed, placing us approximately 2 weeks ahead of schedule. Installation of the loading conveyor system has commenced, again this is well ahead of schedule.

Camp and Mine Site Development?.

Improvement to the site and camp continue. Telephone and internet communications have been established. A camp perimeter electrified bear fence as per site requirements has been installed. Road access development and overburden stripping is proceeding satisfactorily. The region has experienced record rainfall affording on-site environmental personnel to precisely implement the requirements for compliance with water management and other regulations. Despite the extremely high rainfall in the area, development continues well on track. Watch for photo updates and an updated power point presentation on our website at http://www.highbankresources.com

Highbank looks forward to being in the preeminent position of being able to supply aggregates in support of the ongoing construction to the Port of Prince Rupert ($1.2 billion Federal development project). Our contribution will assist in meeting the Federal Government's commitment to make the Port of Prince Rupert, "Canada's Gateway to the Asian Markets". The Company has unwavering confidence in B.C.'s Premier Christy Clark and her Ministers ability to conclude negotiations and set forward a fair Liquefied natural gas ("LNG") tax regime. The B.C. government has stated that the tax regime will be outlined at the opening of the Legislature's fall session October 8, 2014. LNG is an increasingly important pillar of the global energy industry.

On behalf of the Board of Directors of
HIGHBANK RESOURCES LTD.

"Victor N. Bryant"
Victor N. Bryant,
CEO/ President

This News Release may contain forward-looking statements based on assumptions and judgments of management regarding future events or results that may prove to be inaccurate as a result of exploration and other risk factors beyond its control, and actual results may differ materially from the expected results.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.



Contact

#600 - 625 Howe Street
Vancouver, B.C.
V6C 2T6
Ph: (604) 683-6648
Fax: (604) 683-1350
E-Mail: highbank@telus.net
www.highbankresources.com


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!




Mineninfo
Highbank Resources Ltd.
Bergbau
A3DMJA
CA42982U2065
Minenprofile
Alle Angaben ohne Gewähr! Copyright © by GoldSeiten.de 1999-2024.
Die Reproduktion, Modifikation oder Verwendung der Inhalte ganz oder teilweise ohne schriftliche Genehmigung ist untersagt!

"Wir weisen Sie ausdrücklich auf unser virtuelles Hausrecht hin!"