Additional High Grade Results From Phase 4 Infill Mineral Resource Drilling Programme at the Araguaia Nickel Project, Brazil

03.06.2015  |  CNW

LONDON, June 3, 2015 /CNW/ - Horizonte Minerals Plc, (AIM: HZM, TSX: HZM) ('Horizonte' or 'the Company') the nickel development company focused in Brazil, is pleased to announce the final results from its Phase 4 infill resource drilling programme at its 100% owned Araguaia nickel project ('Araguaia') in Para State, north central Brazil.  The drill programme is now complete and has demonstrated consistent high grade drill intersections.

Highlights

  • High grade nickel intersections from infill resource drilling on the Pequizeiro deposit include:
    • 11.30 meters grading 2.95% Ni
    • 9.21 meters grading 2.50% Ni
    • 11.82 meters grading 2.39% Ni
    • 14.05 meters grading 2.33% Ni
    • 18.99 meters grading 2.27% Ni
  • High grade nickel intersections from infill resource drilling on the Jacutinga deposit include: 
    • 4.44 meters grading 3.04% Ni
    • 12.13 meters grading 2.43% Ni
    • 17.44 meters grading 2.38% Ni
    • 19.67 meters grading 2.07% Ni
    • 17.30 meters grading 2.07% Ni

Horizonte CEO Jeremy Martin said, "It's encouraging to report a significant number of high grade drill results (greater than 2% nickel) from our phase 4 mineral resource drilling programme at Araguaia.  The full set of results have now been received for the drilling across the Pequizeiro and Jacutinga deposits, and these two areas will support the initial 8 to 10 years mine life.   These results further support the high grade zones within the current NI 43-101 Mineral Resource Estimate, so we have an increased degree of confidence that we will not see any significant reduction in the planned nickel grades over the early period of mine life.

"We are making good progress on other areas of the Feasibility work at Araguaia.  The full scale Rotary Kiln Electric Furnace pilot campaign is progressing to schedule and we look forward to providing updates on this work in due course""

Further Details

The phase 4 mineral resource drilling programme was designed to complete infill drilling on 50 metre x 50 metre grids on selected parts of the Pequizeiro and Jacutinga deposits.  The completed programme comprised a total of 310 holes totalling 10,255 metres, 261 holes totalling 8,764 metres on the Pequizeiro deposit and 49 holes totalling 1,491 metres on the Jacutinga deposit.

All the outstanding results on the Pequizeiro deposit comprising 218 holes are presented in Table 1 below. These results contain several high grade intersections including 11.30 meters grading 2.95% nickel (hole PCA_DD_1753), 9.21 meters grading 2.50% nickel (hole PCA_DD_1622), 11.82 meters grading 2.39% nickel (hole PCA_DD_1564), 14.05 meters grading 2.33% nickel (hole PCA_DD_1605) and 18.99 meters grading 2.27% nickel (hole PCA_DD_1785).

All the outstanding results on the Jacutinga deposit comprising 49 holes are presented in Table 2 below. These results contain several high grade intersections including 4.44 meters grading 3.04% nickel (hole PCA_DD_1677), 12.13 meters grading 2.43% nickel (hole PCA_DD_1700), 17.44 meters grading 2.38% nickel (hole PCA_DD_1680), 19.67 meters grading 2.07% nickel (hole PCA_DD_1707) and 17.30 meters grading 2.07% nickel (hole PCA_DD_1688).  Drill plan location maps are available on the Company website at www.horizonteminerals.com/uk/en/gallery/

Table 1. Pequizeiro Drilling Programme

50m x 50m Infill Drilling

Intercepts ?1% Ni cut-off

Holes PCA-DD-1528 to PCA-DD-1792

& DD_GT_022, 024; DD_GW_001

Hole

From (m)

To (m)

Width (m)

Ni %

PCA_DD_1528

0.65

3.65

3.00

1.21

PCA_DD_1529

6.48

12.00

5.52

1.33

PCA_DD_1530

3.22

19.27

16.05

2.06

PCA_DD_1531

2.28

9.52

7.24

2.01

PCA_DD_1532

NSI

PCA_DD_1533

NSI

PCA_DD_1534

5.40

20.32

14.92

1.67

PCA_DD_1535

2.49

7.55

5.06

1.37

PCA_DD_1536

1.80

4.80

3.00

2.41

ditto

7.09

14.35

7.26

1.29

PCA_DD_1537

4.49

9.79

5.30

1.06

PCA_DD_1538

0.67

11.60

10.93

1.74

PCA_DD_1539

5.31

12.92

7.61

1.03

ditto

15.15

17.28

2.13

1.49

PCA_DD_1540

5.52

14.01

8.49

1.13

PCA_DD_1541

NSI

PCA_DD_1542

NSI

PCA_DD_1543

0.00

6.68

6.68

1.55

PCA_DD_1544

6.18

12.51

6.33

1.68

ditto

16.60

21.10

4.50

1.20

PCA_DD_1545

3.04

6.90

3.86

1.38

PCA_DD_1546

4.40

14.80

10.40

1.80

PCA_DD_1547

4.89

12.10

7.21

1.08

PCA_DD_1548

NSI

PCA_DD_1549

3.73

15.18

11.45

1.36

PCA_DD_1550

2.24

6.10

3.86

1.13

PCA_DD_1551

2.83

12.10

9.27

1.73

PCA_DD_1552

7.63

16.36

8.73

1.33

PCA_DD_1553

2.38

15.60

13.22

2.01

PCA_DD_1554

4.27

15.06

10.79

1.84

PCA_DD_1555

3.90

13.62

9.72

1.53

PCA_DD_1556

2.35

8.10

5.75

1.48

PCA_DD_1557

15.20

25.35

10.15

1.36

PCA_DD_1558

6.20

22.70

16.50

1.41

PCA_DD_1559

8.42

31.60

23.18

1.44

PCA_DD_1560

3.24

13.17

9.93

1.49

PCA_DD_1561

6.10

11.78

5.68

1.83

PCA_DD_1562

8.66

15.70

7.04

1.37

PCA_DD_1563

1.15

18.10

16.95

1.57

PCA_DD_1564

0.94

12.76

11.82

2.39

PCA_DD_1565

3.01

15.10

12.09

1.56

PCA_DD_1566

4.18

12.30

8.12

1.25

PCA_DD_1567

5.71

27.50

21.79

1.29

PCA_DD_1568

6.20

18.98

12.78

1.65

PCA_DD_1569

2.77

18.25

15.48

1.34

PCA_DD_1570

7.71

22.25

14.54

2.01

PCA_DD_1571

3.45

7.14

3.69

1.75

PCA_DD_1572

3.87

22.63

18.76

1.62

PCA_DD_1573

6.43

14.47

8.04

2.22

PCA_DD_1574

11.73

21.10

9.37

1.57

PCA_DD_1575

6.45

9.25

2.80

1.17

PCA_DD_1576

8.69

21.00

12.31

1.31

PCA_DD_1577

2.60

11.04

8.44

1.58

PCA_DD_1578

10.64

13.34

2.70

1.35

PCA_DD_1579

6.86

21.05

14.19

1.63

PCA_DD_1580

6.69

26.25

19.56

1.44

PCA_DD_1581

8.51

12.71

4.20

1.61

PCA_DD_1582

4.27

19.55

15.28

1.78

PCA_DD_1583

11.34

21.10

9.76

1.35

PCA_DD_1584

6.79

16.24

9.45

1.62

PCA_DD_1585

3.44

19.21

15.77

1.78

PCA_DD_1586

5.27

13.55

8.28

1.76

PCA_DD_1587

7.93

19.29

11.36

1.29

PCA_DD_1588

3.72

11.50

7.78

1.70

PCA_DD_1589

6.65

9.33

2.68

1.25

PCA_DD_1590

10.44

22.54

12.10

1.41

PCA_DD_1591

8.18

24.18

16.00

1.47

PCA_DD_1592

8.21

15.51

7.30

1.72

PCA_DD_1593

12.66

29.50

16.84

1.78

PCA_DD_1594

4.98

23.53

18.55

1.95

PCA_DD_1595

3.98

7.66

3.68

1.42

PCA_DD_1596

4.65

11.99

7.34

1.78

PCA_DD_1597

9.15

15.15

6.00

2.71

PCA_DD_1598

3.22

9.61

6.39

1.48

ditto

16.56

20.85

4.29

1.55

PCA_DD_1599

15.24

19.13

3.89

1.45

ditto

21.25

25.75

4.50

1.17

PCA_DD_1600

14.42

26.22

11.80

2.08

PCA_DD_1601

7.99

15.94

7.95

1.82

ditto

18.10

23.16

5.06

1.28

PCA_DD_1602

6.11

19.90

13.79

1.78

PCA_DD_1603

NSI

PCA_DD_1604

5.20

9.57

4.37

1.39

PCA_DD_1605

4.10

18.15

14.05

2.33

PCA_DD_1606

7.81

19.70

11.89

1.86

PCA_DD_1607

NSI

PCA_DD_1608

3.42

14.63

11.21

2.06

ditto

17.95

20.90

2.95

1.31

PCA_DD_1609

13.30

30.20

16.90

2.22

PCA_DD_1610

7.68

21.10

13.42

1.94

PCA_DD_1611

3.70

10.65

6.95

1.34

PCA_DD_1612

9.18

17.53

8.35

1.43

PCA_DD_1613

16.38

29.61

13.23

1.45

PCA_DD_1614

8.78

22.51

13.73

1.88

PCA_DD_1615

7.22

22.73

15.51

1.75

PCA_DD_1616

10.52

26.06

15.54

2.06

PCA_DD_1617

9.15

25.30

16.15

1.43

ditto

28.13

33.15

5.02

1.10

PCA_DD_1618

11.18

24.25

13.07

1.70

PCA_DD_1619

12.05

15.05

3.00

1.15

PCA_DD_1620

13.82

30.02

16.20

1.65

PCA_DD_1621

16.35

27.20

10.85

1.75

PCA_DD_1622

15.20

24.41

9.21

2.50

PCA_DD_1623

11.75

25.35

13.60

1.73

PCA_DD_1624

12.31

27.31

15.00

1.59

PCA_DD_1625

NSI

PCA_DD_1626

13.47

27.15

13.68

2.22

PCA_DD_1627

17.26

28.45

11.19

1.68

PCA_DD_1628

9.88

25.01

15.13

1.63

PCA_DD_1629

9.74

21.02

11.28

1.86

PCA_DD_1630

8.89

27.22

18.33

1.87

PCA_DD_1631

18.70

25.71

7.01

1.27

PCA_DD_1632

11.15

24.74

13.59

1.64

PCA_DD_1633

16.02

30.20

14.18

2.20

PCA_DD_1634

10.88

15.00

4.12

1.27

ditto

21.42

27.30

5.88

1.41

PCA_DD_1635

11.32

28.50

17.18

1.69

PCA_DD_1636

20.63

29.54

8.91

1.44

PCA_DD_1637

12.48

29.03

16.55

1.45

PCA_DD_1638

12.81

27.20

14.39

1.83

PCA_DD_1639

11.41

34.25

22.84

1.86

PCA_DD_1640

13.65

25.45

11.80

1.80

PCA_DD_1641

14.59

25.27

10.68

1.98

PCA_DD_1642

16.39

25.45

9.06

1.63

PCA_DD_1643

16.95

30.15

13.20

1.45

PCA_DD_1644

10.70

20.46

9.76

2.13

PCA_DD_1645

23.23

36.89

13.66

1.44

PCA_DD_1646

10.36

25.70

15.34

1.73

PCA_DD_1647

11.88

27.00

15.12

1.43

PCA_DD_1648

14.26

30.20

15.94

1.74

PCA_DD_1649

20.26

29.38

9.12

1.75

PCA_DD_1650

9.25

22.75

13.50

1.58

PCA_DD_1651

17.38

22.70

5.32

1.30

PCA_DD_1652

NSI

PCA_DD_1653

13.46

27.55

14.09

2.15

PCA_DD_1654

NSI

PCA_DD_1655

8.45

17.54

9.09

1.35

PCA_DD_1656

16.65

26.77

10.12

1.44

PCA_DD_1657

16.70

23.38

6.68

1.95

PCA_DD_1658

NSI

PCA_DD_1659

13.80

27.75

13.95

2.13

PCA_DD_1660

9.20

27.20

18.00

1.73

PCA_DD_1661

14.19

26.65

12.46

1.56

PCA_DD_1662

11.36

21.20

9.84

2.29

PCA_DD_1663

11.00

26.45

15.45

1.71

PCA_DD_1664

17.96

28.40

10.44

1.72

PCA_DD_1665

10.26

27.10

16.84

1.83

PCA_DD_1666

8.13

13.65

5.52

1.67

PCA_DD_1667

NSI

PCA_DD_1668

7.30

25.52

18.22

1.89

PCA_DD_1669

NSI

PCA_DD_1721

4.85

19.99

15.14

1.55

PCA_DD_1722

9.20

17.91

8.71

1.48

PCA_DD_1723

8.32

13.80

5.48

1.52

PCA_DD_1724

7.97

23.00

15.03

1.60

PCA_DD_1725

9.69

24.42

14.73

1.63

PCA_DD_1726

2.88

19.13

16.25

1.63

PCA_DD_1727

NSI

PCA_DD_1728

9.50

19.70

10.20

1.85

PCA_DD_1729

7.50

28.50

21.00

1.88

PCA_DD_1730

5.20

20.69

15.49

2.27

PCA_DD_1731

8.66

24.30

15.64

1.68

PCA_DD_1732

7.20

14.33

7.13

1.62

PCA_DD_1733

12.81

25.60

12.79

2.32

ditto

27.90

31.20

3.30

1.27

PCA_DD_1734

12.18

22.30

10.12

1.63

ditto

24.45

30.80

6.35

1.29

PCA_DD_1735

10.91

24.20

13.29

1.48

PCA_DD_1736

11.93

24.86

12.93

1.30

PCA_DD_1737

17.76

28.41

10.65

1.39

PCA_DD_1738

12.40

24.15

11.75

1.82

PCA_DD_1739

13.12

31.70

18.58

1.60

PCA_DD_1740

13.33

16.70

3.37

1.58

ditto

21.20

29.07

7.87

1.21

PCA_DD_1741

15.73

27.35

11.62

1.85

PCA_DD_1742

10.90

19.60

8.70

1.46

PCA_DD_1743

11.51

27.20

15.69

1.81

PCA_DD_1744

11.20

21.98

10.78

1.83

PCA_DD_1745

9.23

18.57

9.34

1.61

PCA_DD_1746

20.58

27.34

6.76

1.31

PCA_DD_1747

13.46

28.60

15.14

1.90

ditto

38.91

48.10

9.19

1.10

PCA_DD_1748

12.05

29.44

17.39

2.06

ditto

31.67

36.10

4.43

1.36

PCA_DD_1749

16.21

24.20

7.99

3.15

PCA_DD_1750

16.60

26.10

9.50

1.59

PCA_DD_1751

14.65

33.05

18.40

1.79

PCA_DD_1752

14.84

27.76

12.92

1.68

PCA_DD_1753

8.40

19.70

11.30

2.95

PCA_DD_1754

20.30

28.50

8.20

1.25

PCA_DD_1755

9.45

27.32

17.87

1.47

PCA_DD_1756

15.03

24.40

9.37

1.82

PCA_DD_1757

14.14

33.33

19.19

1.69

PCA_DD_1758

11.88

20.95

9.07

1.52

ditto

23.00

31.20

8.20

1.17

PCA_DD_1759

20.91

24.45

3.54

2.02

PCA_DD_1760

15.35

25.85

10.50

1.91

PCA_DD_1761

18.13

25.70

7.57

1.70

PCA_DD_1762

8.04

27.20

19.16

1.84

PCA_DD_1763

25.70

37.70

12.00

1.24

PCA_DD_1764

8.80

11.74

2.94

1.23

PCA_DD_1765

16.80

23.75

6.95

1.49

PCA_DD_1766

NSI

PCA_DD_1767

8.07

18.25

10.18

1.99

ditto

20.44

23.01

2.57

1.21

PCA_DD_1768

16.16

23.67

7.51

1.89

PCA_DD_1769

27.76

38.94

11.18

1.39

PCA_DD_1770

12.20

21.20

9.00

1.31

PCA_DD_1771

12.81

16.84

4.03

1.98

PCA_DD_1772

19.17

24.48

5.31

2.41

PCA_DD_1773

11.43

23.78

12.35

1.52

PCA_DD_1774

27.45

30.00

2.55

1.25

PCA_DD_1775

10.22

21.66

11.44

1.62

PCA_DD_1776

9.13

24.32

15.19

1.65

PCA_DD_1777

14.26

19.70

5.44

1.44

PCA_DD_1778

9.50

25.60

16.10

1.60

PCA_DD_1779

NSI

PCA_DD_1780

3.10

28.58

25.48

1.85

PCA_DD_1781

13.42

32.12

18.70

1.57

PCA_DD_1782

7.70

33.20

25.50

1.85

PCA_DD_1783

14.20

25.70

11.50

1.77

PCA_DD_1784

7.82

25.69

17.87

1.44

PCA_DD_1785

9.41

28.40

18.99

2.27

PCA_DD_1786

17.12

22.93

5.81

1.15

PCA_DD_1787

11.27

17.00

5.73

1.74

ditto

19.00

22.00

3.00

1.21

PCA_DD_1788

7.98

24.20

16.22

1.53

PCA_DD_1789

12.74

20.07

7.33

1.67

PCA_DD_1790

9.58

28.60

19.02

1.70

PCA_DD_1791

6.95

11.20

4.25

1.88

ditto

15.64

18.90

3.26

1.18

PCA_DD_1792

7.40

30.00

22.60

1.51

DD_GT_021

3.87

11.20

7.33

1.45

DD_GT_022

18.11

34.33

16.22

1.42

DD_GT_024

14.44

28.16

13.72

1.87

DD_GW_001

13.41

22.63

9.22

2.20

ditto

25.63

28.56

2.93

1.30

Table 2. Jacutinga Drilling Programme

50m x 50m Infill Drilling

Intercepts ?1% Ni cut-off

Holes PCA-DD-1670 to PCA-DD-1716

Hole

From (m)

To (m)

Width (m)

Ni %

PCA_DD_1670

NSI

PCA_DD_1671

3.16

7.70

4.54

1.29

ditto

10.70

18.85

8.15

1.28

ditto

22.48

26.25

3.77

1.51

PCA_DD_1672

NSI

PCA_DD_1673

8.68

24.70

16.02

1.69

ditto

26.70

30.70

4.00

1.04

ditto

34.67

37.71

3.04

1.41

PCA_DD_1674

NSI

PCA_DD_1675

4.08

22.72

18.64

1.94

ditto

25.72

33.78

8.06

1.12

PCA_DD_1676

2.15

6.90

4.75

1.09

PCA_DD_1677

11.06

14.84

3.78

1.48

ditto

16.86

21.30

4.44

3.04

PCA_DD_1678

1.16

10.32

9.16

1.60

PCA_DD_1679

4.00

9.20

5.20

1.93

PCA_DD_1680

10.38

27.82

17.44

2.38

PCA_DD_1681

5.09

16.65

11.56

1.66

PCA_DD_1682

NSI

PCA_DD_1683

3.25

9.83

6.58

1.58

PCA_DD_1684

4.00

6.04

2.04

1.59

PCA_DD_1685

NSI

PCA_DD_1686

NSI

PCA_DD_1687

3.80

24.65

20.85

1.63

PCA_DD_1688

3.98

21.28

17.30

2.07

PCA_DD_1689

6.25

13.75

7.50

1.13

ditto

24.25

31.75

7.50

1.19

PCA_DD_1690

2.24

10.50

8.26

1.41

PCA_DD_1691

6.20

11.77

5.57

1.51

PCA_DD_1692

NSI

PCA_DD_1693

NSI

PCA_DD_1694

4.86

11.90

7.04

1.78

PCA_DD_1695

5.00

12.75

7.75

1.49

PCA_DD_1696

6.40

18.25

11.85

2.00

PCA_DD_1697

4.50

8.43

3.93

1.84

PCA_DD_1698

8.18

19.48

11.30

1.69

ditto

23.13

26.33

3.20

1.11

PCA_DD_1699

5.87

22.17

16.30

1.47

PCA_DD_1700

7.70

19.83

12.13

2.43

PCA_DD_1701

3.89

18.10

14.21

1.40

PCA_DD_1702

18.34

24.06

5.72

1.10

PCA_DD_1703

7.70

18.53

10.83

1.51

PCA_DD_1704

NSI

PCA_DD_1705

NSI

PCA_DD_1706

6.81

15.10

8.29

1.79

PCA_DD_1707

7.91

27.58

19.67

2.07

PCA_DD_1708

6.99

15.20

8.21

1.44

PCA_DD_1709

7.25

22.62

15.37

1.81

ditto

25.93

34.08

8.15

1.24

PCA_DD_1710

NSI

PCA_DD_1711

7.38

10.48

3.10

1.62

PCA_DD_1712

3.89

24.20

20.31

1.54

PCA_DD_1713

10.73

28.55

17.82

1.53

PCA_DD_1714

7.22

19.02

11.80

2.10

PCA_DD_1715

8.91

21.60

12.69

1.60

PCA_DD_1716

NSI

DD_GT_023

2.88

7.70

4.82

1.39

ditto

10.33

18.20

7.87

1.11

DD_GT_025

6.84

16.62

9.78

1.83

NSI:

No significant intersection

The compositing of the nickel grades in the individual holes was completed across geological boundaries using a nickel cut-off of 1% with a minimum intercept length of 2.0 metres and a maximum length of internal waste of 2 metres.  All holes were vertical and, as these nickel laterite deposits are essentially flat-lying, all widths given are true widths.  Core recoveries in the mineralised sections met the appropriate standards for this style of mineralisation and were generally >90%.

Sample preparation and analyses

Samples from drill core were crushed and pulverised at the ALS laboratory in Goiania and the resultant pulps analysed at the ALS laboratory in Lima, Peru using tetraborate fusion and X-Ray Fluorescence ('XRF').  Full QA/QC procedures were followed, including the insertion of standards, duplicates and blanks.  Check samples representing approximately 5% of all the samples will be sent to another international laboratory for analysis by XRF.

Horizonte Minerals prepared this news release and David Hall BSc, MSc, Fellow SEG P.Geo. a director of the Company and Qualified Person under National Instrument 43-101, reviewed and approved the drillhole technical information.

About Horizonte Minerals:

Horizonte Minerals Plc is an AIM and TSX-listed nickel development company focused in Brazil, which wholly owns the advanced Araguaia nickel laterite project located to the south of the Carajas mineral district of northern Brazil. 

The Company is developing Araguaia as the next major nickel mine in Brazil, with targeted production for early 2018. 

The Project is located south of the Carajas Mining district in northern Brazil, which has good infrastructure in place including rail, road, water and power, and has a current NI 43-101 compliant Mineral Resource of 71.98Mt grading 1.33% Ni (Indicated) and 25.4Mt at 1.21% Ni (Inferred) at a 0.95% nickel cut-off; included in Resources is a Probable Reserve base of 21.2Mt at 1.66%Ni.

A Pre-Feasibility Study has been completed which underpins the robust economics of developing a mine with a targeted 15,000tpa nickel in ferro-nickel output with a 20% Fe-Ni product over a 25 year mine life utilising the proven pyrometallurgical process of Rotary Kiln Electric Furnace technology.  At these production rates, the project has a post-tax NPV of US$519m at a discount rate of 8% and an IRR of 20%, with a capital cost of US$582m which puts this project in the lowest quartile of the cost curve.

Horizonte has a strong shareholder structure including Teck Resources Ltd. 38.5%, Henderson Global Investors 14%, Anglo Pacific Group 7%.

CAUTIONARY STATEMENT REGARDING FORWARD LOOKING INFORMATION

Except for statements of historical fact relating to the Company, certain information contained in this press release constitutes "forward-looking information" under Canadian securities legislation. Forward-looking information includes, but is not limited to, statements with respect to the potential of the Company's current or future property mineral projects; the success of exploration and mining activities; cost and timing of future exploration, production and development; the estimation of mineral resources and reserves and the ability of the Company to achieve its goals in respect of growing its mineral resources; and the realization of mineral resource and reserve estimates. Generally, forward-looking information can be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved". Forward-looking information is based on the reasonable assumptions, estimates, analysis and opinions of management made in light of its experience and its perception of trends, current conditions and expected developments, as well as other factors that management believes to be relevant and reasonable in the circumstances at the date that such statements are made, and are inherently subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied by such forward-looking information, including but not limited to risks related to: exploration and mining risks, competition from competitors with greater capital; the Company's lack of experience with respect to development-stage mining operations; fluctuations in metal prices; uninsured risks; environmental and other regulatory requirements; exploration, mining and other licences; the Company's future payment obligations; potential disputes with respect to the Company's title to, and the area of, its mining concessions; the Company's dependence on its ability to obtain sufficient financing in the future; the Company's dependence on its relationships with third parties; the Company's joint ventures; the potential of currency fluctuations and political or economic instability  in countries in which the Company operates; currency exchange fluctuations; the Company's ability to manage its growth effectively; the trading market for the ordinary shares of the Company; uncertainty with respect to the Company's plans to continue to develop its operations and new projects; the Company's dependence on key personnel; possible conflicts of interest of directors and officers of the Company, and various risks associated with the legal and regulatory framework within which the Company operates.

Although management of the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements.

SOURCE Horizonte Minerals Plc



Contact
visit www.horizonteminerals.com or contact: Jeremy Martin, Horizonte Minerals Plc, Tel: +44 (0) 20 7763 7157; David Hall, Horizonte Minerals Plc, Tel: +44 (0) 20 7763 7157; Joanna Weaving, finnCap Ltd (Corporate Broking), Tel: +44 (0) 20 7220 0500; Christopher Raggett, finnCap Ltd (Corporate Finance), Tel: +44 (0) 20 7220 0500; Felicity Winkles, St Brides Partners Ltd (PR), Tel: +44 (0) 20 7236 1177; Lottie Brocklehurst, St Brides Partners Ltd, Tel: +44 (0) 20 7236 1177
Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!




Mineninfo
Horizonte Minerals Plc
Bergbau
A3DHF4
GB00BMXLQJ47
Minenprofile
Alle Angaben ohne Gewähr! Copyright © by GoldSeiten.de 1999-2024.
Die Reproduktion, Modifikation oder Verwendung der Inhalte ganz oder teilweise ohne schriftliche Genehmigung ist untersagt!

"Wir weisen Sie ausdrücklich auf unser virtuelles Hausrecht hin!"