Suche
 
Folgen Sie uns auf:

Hecla Reports Second Quarter 2015 Results

06.08.2015  |  Business Wire

Hecla Mining Company (NYSE:HL) today announced a second quarter net loss applicable to common shareholders of $26.8 million, or $0.07 per share, and a loss after adjustments applicable to common shareholders of $17.6 million, or $0.05 per share.1

SECOND QUARTER HIGHLIGHTS AND SIGNIFICANT ITEMS

  • Sales of $104.2 million.
  • Adjusted EBITDA of $29.5 million.2
  • Operating cash flow of $30.8 million.
  • Total silver production of 2.5 million ounces at a cash cost, after by-product credits, per silver ounce, of $5.61.3
  • Gold production of 44,692 ounces, of which Casa Berardi produced 30,939 ounces at a cash cost, after by-product credits, per gold ounce of $832.3
  • Completed acquisition of Revett Mining Company, owner of the Rock Creek project.
  • Cash and cash equivalents of $192 million at June 30, 2015.
  • Secured the third-party-owned Velardeña mill to process high-grade material from San Sebastian.
  • Strong exploration success at San Sebastian and Casa Berardi.
  • Increased estimated 2015 silver production to 10.5 - 11.0 million ounces.
  • Accrual of $8.7 million for possible settlement of environmental claims at two legacy sites.

“Despite lower silver prices, we continue to advance growth projects like San Sebastian and #4 Shaft at Lucky Friday for their potential to increase production of high-grade ounces at low cash costs, after by-product credits,” said Phillips S. Baker, Jr., Hecla’s President and CEO. “Our assets, particularly Greens Creek with its recent improvements in recovery, have allowed us to weather the metals price weakness, and we retain the ability to reduce costs and programs if prices remain weak or go lower. With expected mining at San Sebastian early in 2016, and, combined with the deeper Lucky Friday in three years, we anticipate the addition of significant additional cash flow, further strengthening us going forward.”

(1) Loss after adjustments applicable to common shareholders represents a non-US Generally Accepted Accounting Principles (GAAP) measurement, a reconciliation of which to net income (loss) applicable to common shareholders (GAAP), the most comparable GAAP measure, can be found at the end of the release.
(2) Adjusted EBITDA is a non-GAAP measurement, a reconciliation of which to net income (loss), the most comparable GAAP measure, can be found at the end of the release.
(3) Cash cost, after by-product credits, per silver and gold ounce represents a non-GAAP measurement, a reconciliation of which to cost of sales and other direct production costs and depreciation, depletion and amortization, the most comparable GAAP measures, can be found at the end of the release.

FINANCIAL OVERVIEW

Net loss applicable to common shareholders for the second quarter was $26.8 million, or $0.07 per share, compared to net loss applicable to common shareholders of $14.5 million, or $0.04 per share, for the same period a year ago, and was impacted by the following items:

  • Cash cost, after by-product credits, per gold ounce decreased 13% and per silver ounce increased 5% from second quarter 2014.
  • Net mark-to-market loss on base metal derivative contracts of $0.9 million, as a result of rising base metals prices, compared to a net loss of $11.6 million in the second quarter of 2014.
  • Increased pre-development spending on San Sebastian.
  • A $1.8 million foreign exchange loss on Canadian assets.
  • Lower realized silver, gold, and lead prices with higher realized zinc prices.
  • An $8.7 million accrual for possible environmental settlement.
  • $2.1 million of acquisition costs for Revett Mining Company.
Second Quarter Ended Six Months Ended
HIGHLIGHTS June 30, 2015 June 30, 2014 June 30, 2015 June 30, 2014
FINANCIAL DATA
Sales (000) $ 104,197 $ 117,502 $ 223,289 $ 243,289
Gross profit (000) $ 9,464 $ 18,728 $ 29,337 $ 40,971
Income (loss) applicable to common shareholders (000) $ (26,805 ) $ (14,537 ) $ (14,391 ) $ (3,034 )
Basic and diluted loss per common share $ (0.07 ) $ (0.04 ) $ (0.04 ) $ (0.01 )
Net income (loss) (000) $ (26,667 ) $ (14,399 ) $ (14,115 ) $ (2,758 )
Cash provided by (used in) operating activities (000) $ 30,754 $ 26,646 $ 52,173 $ 57,029

Operating cash flow was $4 million higher than the second quarter 2014 due to the timing of concentrate shipments at Greens Creek contributing $7.3 million and the advance settlement of financially settled base metal forward contracts contributing $12 million.

Capital expenditures (excluding capitalized interest) at the operations totaled $32 million for the second quarter. Expenditures were $11.4 million at Lucky Friday, $12.1 million at Greens Creek and $8.6 million at Casa Berardi.

Metals Prices

The average realized silver price in the second quarter was $16.32 per ounce, 17% lower than the $19.62 price realized in the second quarter of 2014. Realized gold and lead prices also decreased by 8% and 6%, respectively, from the second quarter of 2014. The average realized zinc price rose slightly to $0.96, up 2% from the prior year period.

Second Quarter Ended Six Months Ended
June 30, 2015 June 30, 2014 June 30, 2015 June 30, 2014
AVERAGE METAL PRICES
Silver - London PM Fix ($/oz) $ 16.41 $ 19.62 $ 16.56 $ 20.06
Realized price per ounce $ 16.32 $ 19.62 $ 16.83 $ 19.83
Gold - London PM Fix ($/oz) $ 1,193 $ 1,288 $ 1,206 $ 1,291
Realized price per ounce $ 1,194 $ 1,291 $ 1,208 $ 1,295
Lead - LME Cash ($/pound) $ 0.88 $ 0.95 $ 0.85 $ 0.95
Realized price per pound $ 0.94 $ 1.00 $ 0.89 $ 0.99
Zinc - LME Cash ($/pound) $ 1.00 $ 0.94 $ 0.97 $ 0.93
Realized price per pound $ 0.96 $ 0.94 $ 0.95 $ 0.92

Base Metals Forward Sales Contracts

The following table summarizes the quantities of base metals committed under financially settled forward sales contracts at June 30, 2015:

Pounds Under Contract Average Price
(in thousands) per Pound
Zinc Lead Zinc Lead
CONTRACTS ON PROVISIONAL SALES
2015 settlements 25,298 5,567 $ 0.97 $ 0.82
CONTRACTS ON FORECASTED SALES
2015 settlements 13,228 $ 0.88 N/A
2016 settlements 20,779 $ 0.95 N/A

The contracts represent 11% of the forecasted payable zinc production at an average price of $0.93 per pound. With advanced settlement of financially settled base metal forward contracts, the forecasted payable zinc and lead remaining under contract have declined from 101.9 million pounds of zinc and 86.6 million pounds of lead committed at June 30, 2014 to 34.0 million pounds of zinc and no lead at June 30, 2015.

OPERATIONS OVERVIEW

Overview

  • Greens Creek production of 1.9 million ounces of silver is 10% higher than the 1.7 million ounces in the same period 2014 and within the mine’s expected production range.
  • Lucky Friday silver production of 613,474 ounces is a decrease from 820,786 ounces from the same period of 2014 due to the impact upon production related to the failure of a ventilation booster fan.
  • Casa Berardi gold production of 30,939 ounces is an increase over 28,623 ounces in the same period of 2014 due to higher grades and tonnage.

The following table provides the production and cash cost, after by-product credits, per silver and gold ounce summary for the second quarters ended June 30, 2015 and 2014:

Second Quarter and Six Months Ended Second Quarter and Six Months Ended
June 30, 2015 June 30, 2014
Production (ounces)

Increase/
(decrease) over
2014

Cash costs, after
by-product credits,
per silver or gold
ounce1,2

Production (ounces)

Cash costs, after
by-product credits,
per silver or gold
ounce1,2

Q2 6 Mos Q2 6 Mos Q2 6 Mos Q2 6 Mos Q2 6 Mos
Silver 2,477,150 5,355,747 (2)% 7% $5.61 $5.24 2,515,835 5,007,688 $5.34 $4.59
Gold 44,692 85,342 3% (5)% $832 $896 43,554 89,822 $952 $917
Greens Creek:
Silver 1,856,125 3,892,091 10% 12% $3.30 $3.27 1,689,183 3,476,320 $3.52 $2.52
Gold 13,753 28,992 (8)% (3)% N/A N/A 14,931 29,940 N/A N/A
Lucky Friday 613,474 1,450,193 (25)% (5)% $12.58 $10.55 820,786 1,520,391 $9.10 $9.33
Casa Berardi3 30,939 56,350 8% (6)% $832 $896 28,623 59,882 $952 $917
(1) Cash cost, after by-product credits, per silver or gold ounce represents a non-GAAP measurement, a reconciliation of which to cost of sales and other direct production costs and depreciation, depletion and amortization, the most comparable GAAP measures, can be found at the end of the release.
(2) Cash cost, after by-product credits, per gold ounce is only applicable to Casa Berardi production. Gold produced from Greens Creek is treated as a by-product credit against the silver cash cost.
(3) Casa Berardi also produced 7,551 ounces of silver in the second quarter of 2015, which is treated as a by-product credit against the gold cash cost.

The following table provides the production summary on a consolidated basis for the second quarter and six months ended June 30, 2015 and 2014:

Second Quarter Ended Six Months Ended
June 30, 2015 June 30, 2014 June 30, 2015 June 30, 2014
PRODUCTION SUMMARY
Silver - Ounces produced 2,477,150 2,515,835 5,355,747 5,007,688
Payable ounces sold 1,986,407 2,216,264 4,912,942 4,405,967
Gold - Ounces produced 44,692 43,554 85,342 89,822
Payable ounces sold 40,237 40,513 80,032 84,478
Lead - Tons produced 9,525 10,229 19,403 19,864
Payable tons sold 7,128 8,654 15,753 16,234
Zinc - Tons produced 17,515 17,383 33,602 34,474
Payable tons sold 12,191 9,767 23,334 23,270

Greens Creek Mine - Alaska

Greens Creek’s second quarter production of 1.9 million ounces of silver exceeded the second quarter of 2014 by 10%, while gold production of 13,753 ounces was 8% less. The higher silver production was a result of higher recoveries and grade, partially offset by slightly lower tonnage. Silver recoveries increased 8%, or 5.6 percentage points, to 75.4% over the prior year period. The improvement is a result of a change implemented in late 2014 to the flotation circuit to more efficiently scalp additional lead concentrate directly to final concentrate, and by introducing CO2 for pH control in the lead flotation circuit. The reduction in gold production was the result of lower tonnage and grade partially offset by recoveries that increased due to the plant improvements. The mill operated at an average of 2,194 tons per day (tpd) in the second quarter.

As a result of higher grades and recoveries, the Company now expects Greens Creek to produce 7.7 to 8.0 million ounces of silver, an increase over the previous estimate of 7.3 million ounces.

The cash cost, after by-product credits, per silver ounce of $3.30 decreased from $3.52 in the second quarter 2014.1 The per ounce cost was beneficially impacted by lower operating costs and negatively impacted by lower by-product credits. Power costs were similar to the 2014 period due to higher precipitation levels in southeast Alaska in both cases resulting in availability of less expensive hydroelectric power, a condition that is expected to last through the next quarter. Treatment costs were lower as a result of lower realized silver prices, as treatment costs include the value of silver not payable to the company through the smelting process. Mining costs per ton increased by 1% due to lower production, and milling costs per ton decreased 2% due to slightly lower labor costs and various other variances partially offset by lower production. The Company now expects Greens Creek to produce silver in 2015 at a cash cost, after by-product credits of $3.75 per ounce, a reduction from the previous estimate of $4.50 per ounce.

Lucky Friday Mine - Idaho

Lucky Friday’s second quarter silver production of 613,474 ounces was 25% lower than the second quarter of 2014 due to lower tonnage and grade resulting from a failure of the underground booster fan reducing the ventilation capacity of the mine, leading to the temporary closure of a higher-grade production stope. Lucky Friday has returned to near normal production rates by extending the work schedule to seven days per week from six, but is mining lower grade material until the fan is replaced, expected to be in the fourth quarter. In addition, there are 15 days of scheduled downtime in the third quarter for hoist mechanical maintenance. The mill operated at an average of 792 tpd in the second quarter.

The mine is now expected to produce 2.8 to 3.0 million ounces of silver in 2015, a reduction over the previous estimate of 3.2 million ounces.

The cash cost, after by-product credits, per silver ounce of $12.58, increased from $9.10 per ounce in the second quarter of 2014.¹ This increase was principally due to lower production and realized metals grades relating to ventilation upgrades and lower by-product credits. The Company now expects Lucky Friday to produce silver in 2015 at a cash cost, after by-product credits, of $10.75 per ounce, an increase over the previous estimate of $8.75 per ounce.

#4 Shaft, a key growth project, has been excavated approximately 2,900 feet below the shaft collar to the 7835 level. The project is more than 85% complete and is expected to be finished in the fourth quarter of 2016. The total estimated completion cost of #4 Shaft is approximately $225 million, with $184 million already spent through the second quarter of 2015. As of June 30, 2015, the #4 Shaft team has worked 1,321 days without a lost-time accident.

Casa Berardi - Quebec

Casa Berardi’s second quarter gold production of 30,939 ounces was 8% higher than the second quarter of 2014 because of higher grades and tonnage, partially offset by lower recovery. The mine experienced higher grades as a result of mine sequencing. Although recoveries relative to the 2014 period decreased to 86% from 90% due to the presence of arsenopyrite in some of the 118 Zone ore, adjustments made to the plant in 2015 are expected to contribute to recoveries increasing to 87% during the second half of the year. The mill operated at an average of 2,407 tpd in the second quarter.

With expectations for additional recovery improvements, and the planned addition of higher-grade stopes in Zone 123 in the fourth quarter, the mine is expected to meet its 130,000 gold ounce target for the year.

(1) Cash cost, after by-product credits, per silver and gold ounce represents a non-GAAP measurement, a reconciliation of which to cost of sales and other direct production costs and depreciation, depletion and amortization, the most comparable GAAP measures, can be found at the end of the release.

The cash cost, after by-product credits, per gold ounce of $832, decreased from $952 in the second quarter of 2014 due to higher production and the weaker Canadian dollar.1

EXPLORATION AND PRE-DEVELOPMENT

Expenditures

Exploration and pre-development expenses were $4.6 million and $1.6 million, respectively, in the second quarter of 2015, increases of about $1.5 million and $1.2 million compared to the second quarter 2014 as a result of increased spending at the San Sebastian property. Full year exploration and pre-development expenses are expected to be about $24 million, an increase from the previous expectation of $18 million principally due to increased activity at San Sebastian.

San Sebastian - Mexico

Hecla has secured the use of a Merrill-Crowe processing plant near Velardeña in the State of Durango, Mexico, as announced on July 15, 2015. Under the terms of the agreement, Hecla has exclusive use of the mill for 18 months, with the potential to increase for up to another 12 months. Located within 100 miles of San Sebastian, the mill was previously used by Hecla to process ore when it mined on the property from 2001 to 2005.

The mill has been idle for several years and requires some rehabilitation and updating to meet the standard Hecla uses for environmental protection and best practices in milling standards.

A Preliminary Economic Assessment (PEA) is expected to be completed by the end of the third quarter, but does not include results of the recent in-fill drilling program described below.

There has been significant drilling success over the past two years on the near-surface East Francine, Middle and North veins at the San Sebastian project, and the project is quickly advancing to open pit mine production. The East Francine, Andrea, Middle and North veins now define nearly 5.0 miles of mineralized strike length and are open along strike and at depth. The East Francine Vein is the faulted extension of the past-producing, high-grade Francine Vein which from 2001 to 2005 was one of the highest-grade producers in Mexico.

The East Francine Vein has currently been traced for over 1,600 feet along strike and to 500 feet of depth. The near-surface, high-grade zones are characterized as being silver and gold dominant, supergene enriched and oxidized (cyanide soluble). An in-fill drill program of the main mineralized shoot has demonstrated the continuity of the vein structure and increased resource confidence to measured and indicated categories in the proposed open pit areas. Relative to the initial drilling, the assay results of the in-fill program are generally about 3.3 feet wider than expected and returned some extremely high grades that are consistent with previous drilling. The drilling also appears to extend the high-grade area further along strike to the east and west, potentially expanding the open pit resource. Assay results from the shallow East Francine Vein in-fill drill program include 1.18 oz/ton gold and 358.7 oz/ton silver over 18.6 feet, 0.78 oz/ton gold and 120.3 oz/ton silver over 15.1 feet, 0.87 oz/ton gold and 160.8 oz/ton silver over 11.5 feet, and 0.26 oz/ton gold and 25.4 oz/ton silver over 18.7 feet.

(1) Cash cost, after by-product credits, per silver and gold ounce represents a non-GAAP measurement, a reconciliation of which to cost of sales and other direct production costs and depreciation, depletion and amortization, the most comparable GAAP measures, can be found at the end of the release.

The Middle Vein has been traced for nearly 7,000 feet along strike and to a depth of over 1,000 feet. Shallow in-fill drilling of the Middle Vein confirmed the continuity of the vein mineralization and includes intercepts of 0.57 oz/ton gold and 157.3 oz/ton silver over 7.3 feet, 0.24 oz/ton gold and 26.9 oz/ton silver over 5.5 feet, and 0.19 oz/ton gold and 25.5 oz/ton silver over 5.0 feet. Although assay results are not complete, there appears to be a slight improvement in grade over previous drilling. Exploration drilling continues to define a new zone of near-surface mineralization to the southeast, past the San Ricardo Fault. The zone is slightly deeper and shallower dipping than the Middle Vein to the west of the fault assay and intervals include 0.10 oz/ton gold and 13.2 oz/ton silver over 7.0 feet, and 0.02 oz/ton gold and 11.1 oz/ton silver over 8.9 feet.

The North Vein has a mineralized trend that extends over 3,500 feet along strike and 700 feet to depth and remains open along strike in both directions and at depth. The North Vein in-fill drilling intercepts have returned grade results that are consistent with the initial drilling. These assay intervals include 0.84 oz/ton gold and 16.8 oz/ton silver over 2.6 feet, and 0.69 oz/ton gold and 10.1 oz/ton silver over 3.1 feet. On the North Vein some of the deeper exploration intercepts to the south east include 0.10 oz/ton gold and 14.8 oz/ton silver over 4.1 feet and 0.04 oz/ton gold and 11.7 oz/ton silver over 5.0 feet.

Casa Berardi - Quebec

At Casa Berardi, up to seven drills have been operating underground in an effort to refine current stope designs and resources in the 118, 123, 124 and Southwest zones, and exploration drilling has extended mineralization on the 124 Zone and newly discovered 117 Zone. In-stope and definition drilling of the upper 118 Zone from the 530 level intersected a 15 to 55-foot wide shear zone that includes mineralized intervals of 0.54 oz/ton gold over 26.2 feet and 0.33 oz/ton gold over 19.0 feet. Mineralization is open and deeper drilling suggests the zone continues to plunge to the west. Drilling from the 910 level on the lower 118 Zone intersected a lens grading 0.55 oz/ton gold over 15.7 feet and 0.36 oz/ton gold over 17.7 feet and remains open to depth.

Drilling has identified multiple, stacked high-grade lenses of the 123 Zone that represent at least 1,600 feet of continuous down-dip mineralization with an average strike length of 450 feet. Definition and step-out drilling at the bottom of the 123 Zone resource has linked high-grade mineralized structures at the 850 level that are open at depth and to the west. Recent intersections of quartz-dominant zones include 1.1 oz/ton gold over 18.4 feet (123-01), 1.2 oz/ton gold over 11.2 feet (123-01), 1.8 oz/ton gold over 15.7 feet (123-02), 1.6 oz/ton gold over 10.5 feet (123-03) and 1.2 oz/ton gold over 17.7 feet (123-03). Future drilling is expected to continue to fill the gaps on the 123-01 and 123-03 lenses and extend the mineralization further east and at depth on the 123-04 and 123-11 lenses. The close proximity of these new lenses to mine infrastructure is expected to allow near-term production from these areas.

Exploration drilling from the 810 level of the newly defined 117 Zone has extended gold mineralization both north and south of the Casa Berardi Fault for over 300 feet down-plunge. Recent drill results include 0.64 oz/ton gold over 12.1 feet in iron formation north of the Casa Berardi Fault and 0.15 oz/ton gold over 21.8 feet in sheared veins to the south of the Casa Berardi Fault. Surface drilling on the 124 Zone east of the Principal Zone area defined a 15 to 60-foot thick, quartz-bearing zone for over 300 feet strike length that is expected to define an inferred resource from the 250 level to near-surface. Underground drill results on the 124-81 lens include 0.62 oz/ton gold over 16.7 feet and 0.44 oz/ton gold over 7.9 feet. Surface drilling has started on the 157 Zone program at the East Mine in an effort to better define geometry and continuity of a high-grade target that was drilled in 2004 from surface and in 2010 from underground.

Greens Creek - Alaska

At Greens Creek, definition and exploration drilling made progress in refining the NWW, 9A, Deep 200 South and West Wall resources and expanding the Gallagher Fault Block and Upper Southwest trends. Recent drilling of the lower NWW Zone has generally confirmed and upgraded the resource model of the shared and upper limbs. Recent assay results include 107.3 oz/ton silver, 0.73 oz/ton gold, 4.0% zinc, and 2.1% lead over 6.0 feet and 50.5 oz/ton silver, 0.14 oz/ton gold, 13.1% zinc, and 7.3% lead over 6.2 feet. Exploration extensions to this drilling have defined additional West Wall mineralization up to 240 feet down-dip from the current resource model.

Drilling of the 9A zone has defined continuous mineralization along the southernmost portion of the mine contact within the Maki Fault. Overall this drilling has added continuity to existing drilling and should allow for the current modeled blocks to be connected into a more continuous resource. Assay intervals include 26.8 oz/ton silver, 0.01 oz/ton gold, 3.8% zinc, and 2.4% lead over 14.0 feet and 10.4 oz/ton silver, 0.06 oz/ton gold, 18.4% zinc, and 7.9% lead over 10.2 feet. Drilling of the Upper Southwest defined multiple, flat-lying mineralized contacts between the 5250 and Upper Southwest mineralization. Recent exploration drilling of the Gallagher Fault Block combined with existing intercepts defines mineralized zones within the Gallagher Fault with 95 to 425 vertical feet of continuity over 1,000 feet of strike length.

Drilling of the Deep 200 South in the past few years has defined three stacked folds of high-grade mineralization that represent up to 600 feet of down-dip continuity. Recent drill intersections of the folded upper bench mineralization include 61.9 oz/ton silver, 0.04 oz/ton gold, 2.1% zinc, and 1.3% lead over 6.2 feet and 41.2 oz/ton silver, 0.04 oz/ton gold, 3.7% zinc and 3.2% lead over 7.0 feet along the upper limb. The mineralization remains open to the south and exploration drilling is planned for later in the year.

The first drill hole of the surface exploration program at Greens Creek started in mid-June at southeast Killer Creek. This hole intersected the “mine contact” at 1,580 feet where there is sulfide-bearing veins, pyrite pods and pyrite laminations with minor lead-zinc sulfides. This contact is located on the north side of Greens Creek about 3,100 feet away from NWW mine infrastructure. Surface drilling of this target and the High Sore area southeast of the mine is planned for the next two months.

More complete drill assay highlights from San Sebastian, Greens Creek, and Casa Berardi can be found in Table A at the end of the release.

Other Properties

Limited mapping and trenching programs are being advanced in the Silver Valley over the summer. In mid-June fieldwork started on to the Opinaca-Wildcat project near the Eleonore Mine in northern Quebec. Prospecting and sampling of outcrops and floats are mainly focused on the area covered by the Induced Polarization geophysical survey in April. These surveys are expected to serve as the basis for follow-up prospection and trenching in July and August.

2015 GUIDANCE

Estimated 2015 production was updated on July 16, 2015. Exploration and pre-development expectations have increased to $24 million from $18 million on increased activity at San Sebastian. Estimated cash costs, after by-product credits, for Greens Creek are lowered to $3.75 per ounce and for Lucky Friday are increased to $10.75 an ounce. Capital expectations for the year remain unchanged, as do estimates for Casa Berardi production and cash costs, after by-product credits.

For the full year 2015, the Company expects:

Mine

2015E¹ Silver
Production
(Moz)

2015E Gold
Production (oz)

Cash cost, after by-
product credits, per
silver/gold ounce2,3

Greens Creek 7.7-8.0 55,000 $3.75 per silver ounce
Lucky Friday 2.8-3.0 n/a $10.75 per silver ounce
Casa Berardi n/a 130,000 $825 per gold ounce
Company-wide 10.5-11.0 185,000 $6.00 per silver ounce
Silver Equivalent Production:
Including all metals 35

2015E capital expenditures (excluding capitalized interest)

$150 million

2015E pre-development and exploration expenditures

$24 million

(1) 2015E refers to the Company's estimates for 2015.
(2) Cash cost, after by-product credits, per silver and gold ounce represents a non-GAAP measurement, a reconciliation of which to cost of sales and other direct production costs and depreciation, depletion and amortization, the most comparable GAAP measures, can be found at the end of the release.
(3) All metal equivalent production of 35 million silver oz includes silver, gold, lead and zinc production from Lucky Friday, Greens Creek and Casa Berardi converted using the following conversion ratios: 60:1 gold to silver, 80:1 zinc to silver and 90:1 lead to silver.

COMMON STOCK DIVIDEND

The Board of Directors declared a quarterly cash dividend of $0.0025 per share of common stock, payable on or about September 1, 2015, to shareholders of record on August 21, 2015.

CONFERENCE CALL AND WEBCAST

A conference call and webcast will be held Thursday, August 6, at 11:00 a.m. Eastern Time to discuss these results. You may join the conference call by dialing toll-free 1-855-760-8158 or for international by dialing 1-720-634-2922. The participant passcode is HECLA. Hecla’s live and archived webcast can be accessed at www.hecla-mining.com under Investors or via Thomson StreetEvents Network.

ABOUT HECLA

Hecla Mining Company (NYSE:HL) is a leading low-cost U.S. silver producer with operating mines in Alaska and Idaho, and is a growing gold producer with an operating mine in Quebec, Canada. The Company also has exploration and pre-development properties in six world-class silver and gold mining districts in the U.S., Canada and Mexico, and an exploration office and investments in early-stage silver exploration projects in Canada.

Cautionary Statements to Investors on Forward-Looking Statements, including 2015 Outlook

This news release contains “forward-looking statements” within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended, which are intended to be covered by the safe harbor created by such sections and other applicable laws, including Canadian securities laws. Such forward-looking statements may include, without limitation: (i) estimates for 2015 for 1) silver and gold production, 2) cash cost, after by-product credits, and 3) capital expenditures and pre-development and exploration expenditures, in each case for each of the Company’s three mines and on a Company-wide basis; (ii) estimated Company-wide silver equivalent production (which assumes metal prices of gold at $1,225/oz., silver at $17.25/oz., zinc at $0.90/lb. and lead at $0.95/lb. and USD/CAD at $0.91); (iii) certain statements regarding the Greens Creek mine, including expected continued availability of hydroelectric power, and planned drilling and the ability for planned drilling, when combined with existing drilling data, to extend known areas of mineralization in various zones; (iv) certain statements regarding the Lucky Friday mine, including the estimated completion of repairs to the booster fan in the fourth quarter, and the future prospects of the #4 Shaft project, including expectations that 1) it will produce high grade ounces at low cash costs after by-product credits, 2) it will contribute to significant additional cash flow, 3) it will be finished in the fourth quarter of 2016, and 4) that it will cost $225 million; (v) certain statements regarding the Casa Berardi mine, including expectations that 1) there will be additional recovery improvements, 2) higher grade stopes in Zone 123 will be added in the fourth quarter, 3) future drilling will extend mineralization, and 4) the proximity of new lenses to existing infrastructure will allow near term production from these areas; and (vi) statements regarding the future prospects of San Sebastian, including expectations that 1) mining will commence in early 2016, 2) it will produce high grade ounces at low cash costs after by-product credits, 3) it will contribute to significant additional cash flow, and 4) the completion of a preliminary economic assessment by the end of the third quarter. Estimates or expectations of future events or results are based upon certain assumptions, which may prove to be incorrect. Such assumptions, include, but are not limited to: (i) there being no significant change to current geotechnical, metallurgical, hydrological and other physical conditions; (ii) permitting, development, operations and expansion of the Company’s projects being consistent with current expectations and mine plans; (iii) political/regulatory developments in any jurisdiction in which the Company operates being consistent with its current expectations; (iv) the exchange rate for the Canadian dollar to the U.S. dollar, being approximately consistent with current levels; (v) certain price assumptions for gold, silver, lead and zinc; (vi) prices for key supplies being approximately consistent with current levels; (vii) the accuracy of our current mineral reserve and mineral resource estimates; and (viii) the Company’s plans for development and production will proceed as expected and will not require revision as a result of risks or uncertainties, whether known, unknown or unanticipated. Where the Company expresses or implies an expectation or belief as to future events or results, such expectation or belief is expressed in good faith and believed to have a reasonable basis. However, such statements are subject to risks, uncertainties and other factors, which could cause actual results to differ materially from future results expressed, projected or implied by the “forward-looking statements.” Such risks include, but are not limited to gold, silver and other metals price volatility, operating risks, currency fluctuations, increased production costs and variances in ore grade or recovery rates from those assumed in mining plans, community relations, conflict resolution and outcome of projects or oppositions, litigation, political, regulatory, labor and environmental risks, and exploration risks and results, including that mineral resources are not mineral reserves, they do not have demonstrated economic viability and there is no certainty that they can be upgraded to mineral reserves through continued exploration. For a more detailed discussion of such risks and other factors, see the Company’s 2014 Form 10-K, filed on February 18, 2015 with the Securities and Exchange Commission (SEC), as well as the Company’s other SEC filings. The Company does not undertake any obligation to release publicly revisions to any “forward-looking statement,” including, without limitation, outlook, to reflect events or circumstances after the date of this news release, or to reflect the occurrence of unanticipated events, except as may be required under applicable securities laws. Investors should not assume that any lack of update to a previously issued “forward-looking statement” constitutes a reaffirmation of that statement. Continued reliance on “forward-looking statements” is at investors’ own risk.

Qualified Person (QP) Pursuant to Canadian National Instrument 43-101

Dean McDonald, PhD. P.Geo., Senior Vice President - Exploration of Hecla Mining Company, who serves as a Qualified Person under National Instrument 43-101, supervised the preparation of the scientific and technical information concerning Hecla’s mineral projects in this news release. Information regarding data verification, surveys and investigations, quality assurance program and quality control measures and a summary of sample, analytical or testing procedures for the Greens Creek Mine are contained in a technical report prepared for Hecla and Aurizon Mines Ltd. titled “Technical Report for the Greens Creek Mine, Juneau, Alaska, USA” effective date March 28, 2013, and for the Lucky Friday Mine are contained in a technical report prepared for Hecla titled “Technical Report on the Lucky Friday Mine Shoshone County, Idaho, USA” effective date April 2, 2014, and for the Casa Berardi Mine are contained in a technical report prepared for Hecla titled “Technical Report on the Mineral Resource and Mineral Reserve Estimate for the Casa Berardi Mine, Northwestern Quebec, Canada” effective date March 31, 2014 (the “Casa Berardi Technical Report”). Also included in these three technical reports is a description of the key assumptions, parameters and methods used to estimate mineral reserves and resources and a general discussion of the extent to which the estimates may be affected by any known environmental, permitting, legal, title, taxation, socio-political, marketing or other relevant factors. Copies of these technical reports are available under Hecla’s profile on SEDAR at www.sedar.com.

Cautionary Statements to Investors on Reserves and Resources

Reporting requirements in the United States for disclosure of mineral properties are governed by the SEC and included in the SEC’s Securities Act Industry Guide 7, entitled “Description of Property by Issuers Engaged or to be Engaged in Significant Mining Operations” (“Guide 7”). However, the Company is also a “reporting issuer” under Canadian securities laws, which require estimates of mineral resources and reserves to be prepared in accordance with Canadian National Instrument 43-101 (“NI 43-101”). NI 43-101 requires all disclosure of estimates of potential mineral resources and reserves to be disclosed in accordance with its requirements. Such Canadian information is being included here to satisfy the Company’s “public disclosure” obligations under Regulation FD of the SEC and to provide U.S. holders with ready access to information publicly available in Canada.

Reporting requirements in the United States for disclosure of mineral properties under Guide 7 and the requirements in Canada under NI 43-101 standards are substantially different. This document contains a summary of certain estimates of the Company, not only of proven and probable reserves within the meaning of Guide 7, which requires the preparation of a “final” or “bankable” feasibility study demonstrating the economic feasibility of mining and processing the mineralization using the three-year historical average price for any reserve or cash flow analysis to designate reserves and that the primary environmental analysis or report be filed with the appropriate governmental authority, but also of mineral resource and mineral reserve estimates estimated in accordance with the definitional standards of the Canadian Institute of Mining, Metallurgy and Petroleum referred to in NI 43-101. The terms “measured resources,” “indicated resources,” and “inferred resources” are Canadian mining terms as defined in accordance with NI 43-101. These terms are not defined under Guide 7 and are not normally permitted to be used in reports and registration statements filed with the SEC in the United States, except where required to be disclosed by foreign law. Investors are cautioned not to assume that any part or all of the mineral deposits in such categories will ever be converted into proven or probable reserves. “Resources” have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of such a “resource” will ever be upgraded to a higher category or will ever be economically extracted. Investors are cautioned not to assume that all or any part of a “resource” exists or is economically or legally mineable. Investors are also especially cautioned that the mere fact that such resources may be referred to in ounces of silver and/or gold, rather than in tons of mineralization and grades of silver and/or gold estimated per ton, is not an indication that such material will ever result in mined ore which is processed into commercial silver or gold.

HECLA MINING COMPANY

Condensed Consolidated Statements of Loss

(dollars and shares in thousands, except per share amounts - unaudited)

Second Quarter Ended Six Months Ended
June 30, 2015 June 30, 2014 June 30, 2015 June 30, 2014
Sales of products $ 104,197 $ 117,502 $ 223,289 $ 243,289
Cost of sales and other direct production costs 67,567 71,039 141,532 148,780
Depreciation, depletion and amortization 27,166 27,735 52,420 53,538
94,733 98,774 193,952 202,318
Gross profit 9,464 18,728 29,337 40,971
Other operating expenses:
General and administrative 8,296 8,159 17,016 16,100
Exploration 4,592 3,140 9,208 7,290
Pre-development 1,618 437 2,138 856
Other operating expense 766 693 1,394 1,411
Gain/(loss) on sale of PP&E 116 190
Provision for closed operations and environmental matters 9,335 1,267 9,802 2,371
Acquisition costs 2,147 2,147
26,870 13,696 41,895 28,028
Income (loss) from operations (17,406 ) 5,032 (12,558 ) 12,943
Other income (expense):
Gain on sale or impairment of investments (166 ) (166 )
Unrealized gain (loss) on investments (117 ) (608 ) (2,960 ) 80
Gain (loss) on derivative contracts (887 ) (11,601 ) 4,905 (2,149 )
Interest and other income 35 97 73 176
Net foreign exchange gain (loss) (1,833 ) (5,382 ) 10,441 (1,248 )
Interest expense, net of amount capitalized (6,541 ) (6,962 ) (12,733 ) (13,802 )
(9,509 ) (24,456 ) (440 ) (16,943 )
Loss before income taxes (26,915 ) (19,424 ) (12,998 ) (4,000 )
Income tax benefit (provision) 132 5,025 (1,307 ) 1,242
Net loss (26,783 ) (14,399 ) (14,305 ) (2,758 )
Preferred stock dividends (138 ) (138 ) (276 ) (276 )
Loss applicable to common shareholders $ (26,921 ) $ (14,537 ) $ (14,581 ) $ (3,034 )
Basic and diluted loss per common share after preferred dividends $ (0.07 ) $ (0.04 ) $ (0.04 ) $ (0.01 )
Weighted average number of common shares outstanding - basic and diluted 371,295 344,216 370,042 343,437
HECLA MINING COMPANY

Condensed Consolidated Balance Sheets

(dollars and share in thousands - unaudited)

June 30, 2015 December 31, 2014
ASSETS
Current assets:
Cash and cash equivalents $ 191,574 $ 209,665
Accounts receivable:
Trade 7,781 17,696
Other, net 24,519 17,184
Inventories 52,404 47,473
Current deferred income taxes 8,766 12,029
Other current assets 14,040 12,312
Total current assets 299,084 316,359
Non-current investments 2,672 4,920
Non-current restricted cash and investments 957 883
Properties, plants, equipment and mineral interests, net 1,863,440 1,831,564
Non-current deferred income taxes 105,739 98,923
Reclamation insurance asset 16,800
Other non-current assets and deferred charges 3,576 9,415
Total assets $ 2,292,268 $ 2,262,064
LIABILITIES
Current liabilities:
Accounts payable and accrued liabilities $ 44,500 $ 41,869
Accrued payroll and related benefits 23,163 27,956
Accrued taxes 2,420 4,241
Current portion of capital leases 9,894 9,491
Current portion of debt 1,789
Other current liabilities 6,236 5,797
Current portion of accrued reclamation and closure costs 21,191 1,631
Total current liabilities 109,193 90,985
Capital leases 10,187 13,650
Accrued reclamation and closure costs 70,718 55,619
Long-term debt 501,376 498,479
Non-current deferred tax liability 137,716 153,300
Other non-current liabilities 51,504 53,057
Total liabilities 880,694 865,090
SHAREHOLDERS’ EQUITY
Preferred stock 39 39
Common stock 94,771 92,382
Capital surplus 1,515,362 1,486,750
Accumulated deficit (157,547 ) (141,306 )
Accumulated other comprehensive loss (31,250 ) (32,031 )
Treasury stock (9,801 ) (8,860 )
Total shareholders’ equity 1,411,574 1,396,974
Total liabilities and shareholders’ equity $ 2,292,268 $ 2,262,064
Common shares outstanding 376,733 367,377
HECLA MINING COMPANY

Condensed Consolidated Statements of Cash Flows

(dollars in thousands - unaudited)

Six Months Ended
June 30, 2015 June 30, 2014
OPERATING ACTIVITIES
Net loss $ (14,115 ) $ (2,758 )
Non-cash elements included in net loss:
Depreciation, depletion and amortization 52,966 54,045
Unrealized (gain)/loss on investments 3,043
(Gain) loss on disposition of properties, plants, equipment and mineral interests 190 44
Provision for reclamation and closure costs 10,256 2,710
Stock compensation 2,261 2,561
Deferred income taxes (705 ) (6,840 )
Amortization of loan origination fees 910 1,135
(Gain) loss on derivative contracts 7,812 6,231
Foreign exchange gain (9,672 ) (55 )
Other non-cash charges, net 25 (986 )
Change in assets and liabilities:
Accounts receivable 2,469 8,398
Inventories (3,417 ) (2,418 )
Other current and non-current assets (3,904 ) 1,617
Accounts payable and accrued liabilities (4,210 ) (17,084 )
Accrued payroll and related benefits 803 9,069
Accrued taxes (1,938 ) 2,582
Accrued reclamation and closure costs and other non-current liabilities 9,399 (1,222 )
Cash provided by operating activities 52,173 57,029
INVESTING ACTIVITIES
Additions to properties, plants, equipment and mineral interests (58,272 ) (57,461 )
Acquisition of Revett, net of cash acquired (809 )
Proceeds from disposition of properties, plants and equipment 153 238
Purchases of investments (947 )
Changes in restricted cash and investment balances 4,334
Net cash used in investing activities (59,875 ) (52,889 )
FINANCING ACTIVITIES
Proceeds from exercise of warrants 14,112
Acquisition of treasury shares (941 ) (1,501 )
Dividends paid to common shareholders (1,850 ) (1,715 )
Dividends paid to preferred shareholders (276 ) (276 )
Credit availability and debt issuance fees paid (123 ) (577 )
Repayments of capital leases (4,940 ) (4,525 )
Net cash provided by (used in) financing activities (8,130 ) 5,518
Effect of exchange rates on cash (2,259 ) 250
Net increase (decrease) in cash and cash equivalents (18,091 ) 9,908
Cash and cash equivalents at beginning of period 209,665 212,175
Cash and cash equivalents at end of period $ 191,574 $ 222,083
HECLA MINING COMPANY

Production Data

Three Months Ended Six Months Ended
June 30, 2015 June 30, 2014 June 30, 2015 June 30, 2014
GREENS CREEK UNIT
Tons of ore milled 199,694 201,146 395,163 403,861
Mining cost per ton $ 73.60 $ 73.09 $ 73.64 $ 69.98
Milling cost per ton $ 30.31 $ 31.07 $ 29.53 $ 29.29
Ore grade milled - Silver (oz./ton) 12.33 12.03 13.05 12.24
Ore grade milled - Gold (oz./ton) 0.106 0.120 0.112 0.120
Ore grade milled - Lead (%) 3.36 3.25 3.31 3.20
Ore grade milled - Zinc (%) 8.93 8.57 8.64 8.57
Silver produced (oz.) 1,856,125 1,689,183 3,892,091 3,476,320
Gold produced (oz.) 13,753 14,931 28,992 29,940
Lead produced (tons) 5,393 5,044 10,323 9,869
Zinc produced (tons) 15,462 15,288 29,382 30,329
Total cash cost, net of by-product credits, per silver ounce (1) $ 3.30 $ 3.52 $ 3.27 $ 2.52
Capital additions (in thousands) $ 12,056 $ 7,267 $ 18,400 $ 12,849
LUCKY FRIDAY UNIT
Tons of ore processed 72,059 80,379 146,304 159,468
Mining cost per ton $ 99.14 $ 87.83 $ 91.80 $ 84.44
Milling cost per ton $ 20.53 $ 21.81 $ 20.40 $ 21.21
Ore grade milled - Silver (oz./ton) 8.98 10.73 10.38 10.06
Ore grade milled - Lead (%) 6.1 6.83 6.56 6.66
Ore grade milled - Zinc (%) 3.1 2.88 3.14 2.94
Silver produced (oz.) 613,474 820,786 1,450,193 1,520,391
Lead produced (tons) 4,132 5,185 9,080 9,995
Zinc produced (tons) 2,053 2,095 4,220 4,145
Total cash cost, net of by-product credits, per silver ounce (1) $ 12.58 $ 9.10 $ 10.55 9.33
Capital additions (in thousands) $ 11,352 $ 12,277 $ 25,060 $ 22,787
CASA BERARDI UNIT
Tons of ore processed 219,002 212,489 407,097 398,632
Mining cost per ton $ 95.88 $ 103.92 $ 100.33 $ 111.96
Milling cost per ton $ 18.95 $ 19.23 $ 20.33 $ 20.89
Ore grade milled - Gold (oz./ton) 0.165 0.15 0.16 0.17
Ore grade milled - Silver (oz./ton) 0.04 0.031 0.04 0.031
Gold produced (oz.) 30,939 28,623 56,350 59,882
Total cash cost, net of by-product credits, per gold ounce (1) $ 832 $ 952 $ 896 $ 917
Capital additions (in thousands) $ 8,601 $ 10,978 $ 16,198 $ 23,834
(1) Cash cost, after by-product credits, per silver and gold ounce represents a non-GAAP measurement, a reconciliation of which to cost of sales and other direct production costs and depreciation, depletion and amortization, the most comparable GAAP measures, can be found in the cash cost per ounce reconciliation section of this news release. Gold, lead and zinc produced have been treated as by-product credits in calculating silver costs per ounce. The primary metal produced at Casa Berardi is gold, with a by-product credit for the value of silver production.

HECLA MINING COMPANY

Reconciliation of Cash Cost, Before By-product Credits, per Ounce and Cash Cost, After By-product Credits, per Ounce to Generally Accepted Accounting Principles (GAAP)
(Unaudited)

This release contains references to a non-GAAP measure of cash cost, before by-product credits, per ounce and cash cost, after by-product credits, per ounce. Cash cost, before by-product credits, per ounce and cash cost, after by-product credits, per ounce represent non-U.S. Generally Accepted Accounting Principles (GAAP) measurements that the Company believes provide management and investors an indication of net cash flow. Management also uses this measurement for the comparative monitoring of performance of mining operations period-to-period from a cash flow perspective. Cash cost, before by-product credits, per ounce and Cash cost, after by-product credits, per ounce are measures developed by gold companies and used by silver companies in an effort to provide a comparable standard; however, there can be no assurance that our reporting of these non-GAAP measures is similar to those reported by other mining companies. Cost of sales and other direct production costs and depreciation, depletion and amortization are the most comparable financial measures calculated in accordance with GAAP to cash cost, before by-product credits cash cost, after by-product credits.

As depicted in the Greens Creek Unit and the Lucky Friday Unit tables below, by-product credits comprise an essential element of our silver unit cost structure. By-product credits constitute an important competitive distinction for our silver operations due to the polymetallic nature of their orebodies. By-product credits included in our presentation of cash cost, after by-product credits, per silver ounce include:

Total, Greens Creek and Lucky Friday Units
Three months ended June 30, Six months ended June 30,
2015 2014 2015 2014
By-product value, all silver properties:
Zinc $ 25,224 $ 23,653 $ 46,914 $ 46,609
Gold 13,487 15,997 28,995 32,257
Lead 14,472 16,988 28,365 32,755
Total by-product credits $ 53,183 $ 56,638 $ 104,274 $ 111,621
By-product credits per silver ounce, all silver properties
Zinc $ 10.21 $ 9.42 $ 8.78 $ 9.32
Gold 5.47 6.38 5.43 6.46
Lead 5.86 6.77 5.31 6.56
Total by-product credits $ 21.54 $ 22.57 $ 19.52 $ 22.34

By-product credits included in our presentation of cash cost, after by-product credits, per gold ounce for our Casa Berardi Unit include:

Casa Berardi Unit
Three months ended June 30, Six months ended June 30,
2015 2014 2015 2014
Silver by-product value $ 123 $ 114 $ 220 $ 218
Silver by-product credits per gold ounce $ 3.96 $ 3.98 $ 3.90 $ 3.65

The following table calculates cash cost, before by-product credits, per ounce and cash cost, after by-product credits, per ounce (in thousands, except per-ounce amounts):

Total, Greens Creek and Lucky Friday
Three Months Ended
June 30,
Six Months Ended
June 30,
2015 2014 2015 2014
Cash cost, before by-product credits (1) $ 67,034 $ 70,051 $ 132,280 $ 134,570
By-product credits (53,183 ) (56,638 ) (104,273 ) (111,621 )
Cash cost, after by-product credits 13,851 13,413 28,007 22,949
Divided by silver ounces produced 2,469 2,509 5,342 4,996
Cash cost, before by-product credits, per silver ounce 27.15 27.91 24.76 26.93
By-product credits per silver ounce (21.54 ) (22.57 ) (19.52 ) (22.34 )
Cash cost, after by-product credits, per silver ounce $ 5.61 $ 5.34 $ 5.24 $ 4.59
Reconciliation to GAAP:
Cash cost, after by-product credits $ 13,851 $ 13,413 $ 28,007 $ 22,949
Depreciation, depletion and amortization 16,451 19,280 33,063 36,502
Treatment costs (19,305 ) (20,010 ) (39,226 ) (39,916 )
By-product credits 53,183 56,641 104,273 111,624
Change in product inventory (6,119 ) (7,211 ) (401 ) (2,416 )
Reclamation and other costs (96 ) 383 298 908
Cost of sales and other direct production costs and depreciation, depletion and amortization (GAAP) $ 57,965 $ 62,496 $ 126,014 $ 129,651
Greens Creek Unit

Three Months Ended
June 30,

Six Months Ended
June 30,

2015 2014 2015 2014
Cash cost, before by-product credits (1) $ 49,540 $ 50,405 $ 96,653 $ 97,004
By-product credits (43,409 ) (44,459 ) (83,940 ) (88,236 )
Cash cost, after by-product credits 6,131 5,946 12,713 8,768
Divided by silver ounces produced 1,856 1,689 3,892 3,476
Cash cost, before by-product credits, per silver ounce 26.69 29.84 24.82 27.91
By-product credits per silver ounce (23.39 ) (26.32 ) (21.57 ) (25.38 )
Cash cost, after by-product credits, per silver ounce $ 3.30 $ 3.52 $ 3.27 $ 2.52
Reconciliation to GAAP:
Cash cost, after by-product credits $ 6,131 $ 5,946 $ 12,713 $ 8,768
Depreciation, depletion and amortization 13,775 16,960 27,521 31,986
Treatment costs (15,639 ) (14,993 ) (30,872 ) (30,382 )
By-product credits 43,409 44,462 83,940 88,239
Change in product inventory (4,775 ) (7,376 ) 919 (2,377 )
Reclamation and other costs (86 ) 340 302 868
Cost of sales and other direct production costs and depreciation, depletion and amortization (GAAP) $ 42,815 $ 45,339 $ 94,523 $ 97,102
Lucky Friday Unit

Three Months Ended
June 30,

Six Months Ended
June 30,

2015 2014 2015 2014
Cash cost, before by-product credits (1) $ 17,494 $ 19,646 $ 35,627 $ 37,566
By-product credits (9,774 ) (12,179 ) (20,333 ) (23,385 )
Cash cost, after by-product credits 7,720 7,467 15,294 14,181
Divided by silver ounces produced 613 820 1,450 1,520
Cash cost, before by-product credits, per silver ounce 28.53 23.95 24.57 24.71
By-product credits per silver ounce (15.94 ) (14.85 ) (14.02 ) (15.38 )
Cash cost, after by-product credits, per silver ounce $ 12.58 $ 9.10 $ 10.55 $ 0.01
Reconciliation to GAAP:
Cash cost, after by-product credits $ 7,720 $ 7,467 $ 15,294 $ 14,181
Depreciation, depletion and amortization 2,676 2,320 5,542 4,516
Treatment costs (3,666 ) (5,017 ) (8,354 ) (9,534 )
By-product credits 9,774 12,179 20,333 23,385
Change in product inventory (1,344 ) 165 (1,320 ) (39 )
Reclamation and other costs (10 ) 43 (5 ) 40
Cost of sales and other direct production costs and depreciation, depletion and amortization (GAAP) $ 15,150 $ 17,157 $ 31,490 $ 32,549
Casa Berardi Unit
Three Months Ended
June 30,

Six Months Ended
June 30,

2015 2014 2015 2014
Cash cost, before by-product credits (1) $ 25,876 $ 27,351 $ 50,711 $ 55,159
By-product credits (123 ) (114 ) (220 ) (218 )
Cash cost, after by-product credits 25,753 27,237 50,491 54,941
Divided by gold ounces produced 30.94 28.62 56.35 59.88
Cash cost, before by-product credits, per gold ounce 836.34 955.54 899.93 921.13
By-product credits per gold ounce (3.96 ) (3.98 ) (3.90 ) (3.65 )
Cash cost, after by-product credits, per gold ounce $ 832.38 $ 951.56 $ 896.03 $ 917.48
Reconciliation to GAAP:
Cash cost, after by-product credits $ 25,753 $ 27,237 $ 50,491 $ 54,941
Depreciation, depletion and amortization 10,714 8,456 19,357 17,037
Treatment costs (144 ) (131 ) (297 ) (229 )
By-product credits 123 114 220 218
Change in product inventory 206 395 (2,066 ) 288
Reclamation and other costs 116 207 234 412
Cost of sales and other direct production costs and depreciation, depletion and amortization (GAAP) $ 36,768 $ 36,278 $ 67,939 $ 72,667
Total, All Locations
Three Months Ended
June 30,

Six Months Ended
June 30,

2015 2014 2015 2014
Reconciliation to GAAP:
Cash cost, after by-product credits $ 39,604 $ 40,650 $ 78,498 $ 77,890
Depreciation, depletion and amortization 27,165 27,736 52,420 53,539
Treatment costs (19,449 ) (20,141 ) (39,523 ) (40,145 )
By-product credits 53,306 56,755 104,493 111,842
Change in product inventory (5,913 ) (6,816 ) (2,467 ) (2,128 )
Reclamation and other costs 20 590 531 1,320
Cost of sales and other direct production costs and depreciation, depletion and amortization (GAAP) $ 94,733 $ 98,774 $ 193,952 $ 202,318
(1) Includes all direct and indirect operating cash costs related directly to the physical activities of producing metals, including mining, processing and other plant costs, third-party refining and marketing expense, on-site general and administrative costs, royalties and mining production taxes, before by-product revenues earned from all metals other than the primary metal produced at each unit.

HECLA MINING COMPANY

Reconciliation of Net Loss Applicable to Common Shareholders (GAAP) to Adjusted Net Income (Loss) Applicable to Common Stockholders
(dollars and ounces in thousands, except per share amounts - unaudited)

This release refers to a non-GAAP measure of adjusted net income (loss) applicable to common stockholders and adjusted net income (loss) per share, which are indicators of our performance. They exclude certain impacts which are of a nature which we believe are not reflective of our underlying performance. Management believes that adjusted net income (loss) per common share provides investors with the ability to better evaluate our underlying operating performance.

Dollars are in thousands (except per share amounts) Three Months Ended June 30, Six Months Ended June 30,
2015 2014 2015 2014
Net loss applicable to common shareholders (GAAP) $ (26,805 ) $ (14,537 ) $ (14,391 ) $ (3,034 )
Adjusting items:
(Gains) losses on derivatives contracts 887 11,601 (4,905 ) 2,149
Provisional price losses (gains) 601 210 (1,524 ) 948
Environmental accruals 8,700 856 8,700 856
Foreign exchange (gain) loss 1,833 5,382 (10,441 ) 1,248
Acquisition costs 2,147 2,147
Income tax effect of above adjustments (4,934 ) (5,067 ) (1,767 ) (1,581 )
Adjusted net income (loss) applicable to common shareholders $ (17,571 ) $ (1,555 ) $ (22,181 ) $ 586
Weighted average shares - basic 371,295 344,216 370,042 343,437
Weighted average shares - diluted 371,295 344,216 370,042 343,437
Basic adjusted net income (loss) per common share $ (0.05 ) $ $ (0.06 ) $
Diluted adjusted net income (loss) per common share $ (0.05 ) $ $ (0.06 ) $

HECLA MINING COMPANY

Reconciliation of Net Loss (GAAP) to Adjusted EBITDA
(dollars and ounces in thousands, except per share amounts - unaudited)

This release refers to a non-GAAP measure of adjusted earnings before interest, taxes, depreciation and amortization (“Adjusted EBITDA”), which is a measure of our operating performance. Adjusted EBITDA is calculated as net income before the following items: interest expense, income tax provision, depreciation, depletion, and amortization expense, exploration expense, pre-development expense, Aurizon acquisition costs, Lucky Friday suspension-related costs, interest and other income (expense), foreign exchange gains and losses, gains and losses on derivative contracts, unrealized gains on investments, provisions for environmental matters, stock-based compensation, and provisional price gains and losses. Management believes that, when presented in conjunction with comparable GAAP measures, Adjusted EBITDA is useful to investors in evaluating our operating performance. The following table reconciles net loss to Adjusted EBITDA:

Dollars are in thousands Three Months Ended Six Months Ended
June 30, 2015 June 30, 2014 June 30, 2015 June 30, 2014
Net loss $ (26,667 ) $ (14,399 ) $ (14,115 ) $ (2,758 )
Plus: Interest expense, net of amount capitalized 6,541 6,962 12,733 13,802
Plus/(Less): Income taxes (132 ) (5,025 ) 1,307 (1,242 )
Plus: Depreciation, depletion and amortization 27,166 27,735 52,420 53,538
Plus: Exploration expense 4,592 3,140 9,208 7,290
Plus: Pre-development expense 1,618 437 2,138 856
Foreign exchange (gain) loss 1,833 5,382 (10,441 ) 1,248
Plus: Acquisition costs 2,147 2,147
Plus: Provision for closed operations and environmental matters 9,478 1,777 10,256 2,710
Plus/(Less): Losses (gains) on derivative contracts 887 11,601 (4,905 ) 2,149
Plus: Provisional price losses 601 210 (1,524 ) 948
Other 1,449 2,007 5,314 2,305
Adjusted EBITDA $ 29,513 $ 39,827 $ 64,538 $ 80,846

Assay Results - Q2 2015

Note: All assay intervals represent true widths of drill core with the exception of the results from Greens Creek. At Greens Creek the assay intervals represent the horizontal width because the mineralized bodies are very irregular in shape and in most cases this is the best approximation for true width.

Greens Creek (Alaska)

Zone

Drill Hole
Number

Drill Hole
Azm/Dip

Sample
From

Sample
To

Horizontal
Width
(feet)

Silver
(oz/ton)

Gold
(oz/ton)

Zinc
(%)

Lead
(%)

Depth
From
Mine
Portal
(feet)

Northwest West
Definition

GC3958 243/-61 244.40 250.90 6.4 10.11 0.07 7.98 4.08 -621
317.30 320.80 3.4 14.62 0.16 13.14 6.39 -685
325.00 329.30 4.2 39.29 0.23 10.91 5.05 -692
GC3960 243/-28 66.80 93.30 9.1 23.95 0.08 13.29 6.51 -438
144.50 151.70 2.5 45.82 0.02 19.02 7.75 -475
189.00 193.30 3.4 14.16 0.05 8.69 4.90 -497
GC3978 243/-82 79.60 85.80 6.0 107.31 0.73 4.00 2.12 -482
178.30 181.80 3.2 33.08 0.21 6.42 3.14 -580
191.00 201.70 6.9 23.94 0.07 7.65 3.40 -593
243.00 257.60 6.6 39.73 0.08 11.61 6.59 -644
GC3980 243/-71 0.00 59.50 14.4 26.82 0.11 13.45 4.78 -403
95.00 98.00 5.4 14.45 0.07 1.06 0.50 -494
100.00 104.40 5.4 35.64 1.33 4.44 2.59 -499
297.20 317.70 6.2 50.53 0.14 13.11 7.32 -688
GC3982 243/-55 187.50 203.70 12.8 30.11 0.07 9.23 4.86 -569
213.00 217.40 4.2 10.90 0.03 4.73 3.36 -583
262.00 270.80 5.5 14.37 0.07 0.33 0.18 -624
304.00 305.50 0.9 166.68 0.59 4.64 2.09 -656
331.00 343.50 5.7 29.27 0.08 7.60 5.65 -680
347.40 352.80 2.5 47.32 0.31 19.63 12.47 -692
359.20 389.60 13.8 18.36 0.15 4.56 2.58 -701
395.50 404.80 4.2 22.90 0.10 7.80 4.53 -727
GC3983 243/-64 0.00 89.00 10.8 52.37 0.12 20.88 7.55 -403
94.00 99.00 4.6 14.23 0.18 2.06 1.29 -487
113.90 142.80 14.0 21.03 0.18 5.77 3.14 -505
183.50 189.50 2.5 19.49 0.09 3.49 1.59 -568
205.80 214.30 4.6 42.96 0.36 6.66 3.27 -588
221.70 226.70 2.7 20.86 0.17 2.87 1.35 -602
GC3984 243/-36 0.00 5.80 5.8 27.70 0.11 23.21 6.72 -403
GC3986 063/-80 9.00 9.80 0.8 116.66 0.21 15.49 3.47 -421
199.00 204.00 2.7 23.75 0.11 4.70 2.10 -608
GC3989 063/-75 145.70 153.00 7.3 16.39 0.14 4.15 1.42 -551
GC3991 243/-70 169.40 177.30 6.8 23.30 0.11 8.72 4.07 -570
183.80 188.70 4.2 43.53 0.11 12.49 6.92 -582
GC3993 243/-51 386.10 395.00 5.0 31.79 0.27 12.15 6.17 -710
GC3997 063/58 62.40 66.50 3.4 27.38 0.07 15.74 7.60 -336
116.10 119.20 2.6 21.23 0.04 9.03 5.00 -291
GC3999 063/-55 165.70 174.50 6.9 36.34 0.07 8.22 4.77 -546
183.60 205.40 17.2 18.74 0.14 8.41 4.64 -550
GC4001 063/-38 37.20 48.50 5.7 50.87 0.20 8.00 3.59 -422
52.00 64.40 5.2 22.26 0.09 8.68 4.48 -431
GC4003 063/-64 11.60 13.20 1.6 20.56 0.02 10.32 3.99 -410
21.00 31.00 6.9 18.94 0.05 10.36 5.54 -418
36.00 41.50 4.6 12.10 0.13 15.45 8.11 -432
55.40 65.00 9.3 17.36 0.02 3.90 1.76 -449
159.00 163.60 3.9 22.50 0.08 12.12 7.19 -541
GC4005 063/73 105.40 115.80 10.4 20.59 0.08 15.04 6.61 -282
122.10 133.60 10.0 352.90 0.54 9.79 4.12 -267
GC4023 063/-28 234.50 236.50 1.9 34.88 0.18 22.77 12.39 -502
GC4026 063/-43 158.40 170.20 11.4 13.33 0.10 11.22 6.13 -505
GC4028 063/-55 155.70 159.00 3.1 13.96 0.00 8.57 4.38 -527
GC4030 063/-8.5 45.60 49.10 2.2 18.36 0.09 6.92 3.10 -401
100.10 115.60 14.0 15.79 0.04 10.86 4.79 -408
GC4031 063/-66 120.00 136.70 9.1 26.41 0.14 2.90 1.61 -510
158.10 168.30 7.9 21.77 0.07 6.13 3.15 -546
173.80 183.80 6.8 25.60 0.12 14.15 8.10 -557
GC4038 243/-70 261.40 267.70 6.3 23.03 0.11 3.08 1.62 -645
GC4041 063/9 68.20 71.00 2.6 19.97 0.04 10.26 4.69 -381
84.80 92.80 7.3 43.98 0.10 9.00 3.24 -378
GC4050 063/-63 124.90 134.50 9.6 19.03 0.14 6.73 2.98 -516
140.80 145.20 3.5 12.15 0.14 12.96 3.32 -530
GC4054 063/-87 224.00 229.60 4.5 53.05 0.16 12.26 6.31 -629
GC4067 063/-25 160.10 163.90 3.7 35.97 0.28 8.10 3.40 -470
West Wall GC4023 063/-28 515.10 517.30 1.6 11.02 0.02 16.89 9.22 -628

Deep 200 South
Definition

GC3963 243/-71 273.00 281.00 7.0 41.21 0.04 3.69 3.21 -1524
484.50 494.50 9.5 32.93 0.48 10.29 5.80 -1725
GC3970 243/-63 298.00 305.60 6.4 31.53 0.04 4.81 2.78 -1534
GC3975 063/-64 386.00 406.00 4.5 10.58 0.10 3.12 1.68 -1616
487.50 499.80 9.6 26.49 0.03 2.13 1.19 -1708
GC3977 063/-76 294.00 300.50 6.2 18.48 0.11 1.70 1.05 -1554
GC3981 063/-86 269.50 278.80 8.6 20.58 0.17 4.43 2.62 -1537
GC3988 243/-62 301.00 307.70 6.2 61.86 0.04 2.10 1.29 -1534
GC3992 243/-70 501.80 509.20 6.7 22.94 0.14 1.68 0.77 -1741
GC3998 243/-55 319.30 330.30 9.3 24.21 0.11 3.13 2.02 -1531
GC4009 063/-82 281.00 285.80 4.3 26.29 0.21 4.36 2.76 -1548
643.00 647.00 2.4 17.94 0.00 3.50 1.76 -1911
GC4013 243/-87 255.80 263.20 6.5 10.85 0.08 1.39 0.73 -1524
GC4021 243/-59 299.50 310.20 7.8 15.06 0.13 1.02 0.64 -1528
GC4029 063/-83 272.50 278.20 4.8 17.96 0.17 1.14 0.58 -1539
618.90 626.00 4.6 27.23 0.20 14.13 6.81 -1885
641.90 661.50 12.6 15.13 0.13 6.26 3.72 -1906
GC4039 063/-60 405.10 413.30 5.0 20.03 0.12 0.82 0.51 -1622
GC4051 243/-73 263.90 266.00 1.9 52.71 0.04 5.68 3.12 -1522
568.90 575.30 5.7 30.24 0.33 7.34 3.99 -1763
9a Definition GC4004 063/83 226.90 236.60 6.1 17.35 0.02 15.95 6.22 -87
263.00 267.30 1.7 25.00 0.04 27.97 11.01 -51
GC4007 063/70 190.40 209.00 18.6 14.16 0.02 22.07 9.73 -119
238.90 250.00 10.2 10.45 0.06 18.42 7.88 -88
GC4020 243/86 247.30 294.00 14.4 15.16 0.10 8.57 4.53 -66
411.60 417.30 1.8 55.97 0.37 10.35 6.36 96
GC4033 063/-1.5 322.00 334.60 11.4 35.33 0.20 9.77 4.98 -329
GC4055 063/46 305.00 317.10 10.4 11.13 0.03 21.06 6.61 -101
365.70 373.60 6.4 12.88 0.02 19.58 9.03 -58
GC4066 063/11 380.00 396.70 14.0 26.76 0.01 3.75 2.41 -243

Casa Berardi (Quebec)

Zone Drill Hole Number

Drill Hole
Section

Drill Hole
Azm/Dip

Sample
From

Sample
To

True
Width
(feet)

Gold
(oz/ton)

Depth
From Mine
Surface
(feet)

South-West (107) CBW-0365-012 10738 360/-66 177.2 188.6 9.8 0.20 -1354.3
Upper 118 (118-42) CBP-0530-186 12058 341/-31 127.3 147.6 18.7 0.21 -1825.8
(118-43) CBP-0530-189 12068 360/-20 76.8 133.5 24.3 0.22 -1791.0
(118-47) CBP-0530-193 12081 017/-10 65.3 85.3 19.0 0.33 -1770.0
(118-47) CBP-0530-194 12081 016/-20 60.4 88.9 26.2 0.54 -1781.2
(118-42) CBP-0530-197 12054 341/-20 134.5 163.1 24.0 0.26 -1815.0
(118-46) CBP-0530-199 12059 305/-78 131.6 155.2 22.3 0.22 -1898.6
(118-46) CBP-0530-205 12060 248/-80 131.9 158.1 25.3 0.27 -1901.2
(118-46) CBP-0530-206 12059 211/-72 141.1 170.6 26.9 0.22 -1904.9
Lower 118 (118-32) CBP-0910-037 12120 180/-32 70.2 83.7 12.5 0.21 -3018.7
(118-27) CBP-0910-040 12011 183/-45 275.6 357.6 54.8 0.21 -3212.3
(118-32) CBP-0910-041 12118 181/-49 75.5 96.1 17.7 0.36 -3047.2
(118-22) CBP-0910-048 12032 170/-31 324.8 360.9 34.1 0.30 -3158.5
(118-31) CBP-0930-001 12052 166/-2 147.6 165.4 15.7 0.55 -3048.2
(118-27) CBP-0930-006 12043 176/10 190.3 203.4 13.1 0.23 -3008.9
(118-27) CBP-0930-008 12031 188/-5 177.5 196.5 17.7 0.24 -3054.5
(118-22) CBP-0930-010 12027 188/-32 267.7 282.2 13.5 0.34 -3150.6
Upper 123 (123-05) CBP-0550-090 12539 142/47 259.5 291.0 21.7 0.25 -1609.6
(123-05) CBP-0550-091 12554 135/20 229.0 276.6 37.1 0.23 -1718.5
(123-05) CBP-0550-092 12546 135/29 210.0 256.9 46.6 0.26 -1698.2
(123-05) CBP-0550-093 12544 135/37 206.7 262.5 55.1 0.20 -1666.0
Lower 123 (123-02) CBP-0810-017 12386 181/-26 336.3 352.4 15.7 1.84 -2753.6
(123-01) CBP-0810-018 12385 181/-19 332.3 347.8 11.8 0.34 -2695.5
(123-01) CBP-0810-019 12387 181/-11 307.1 324.8 13.5 0.77 -2666.7
(123-01) CBP-0810-020 12388 181/3 259.5 280.8 18.4 1.08 -2581.4
(123-01) CBP-0810-021 12375 189/-4 322.8 335.3 11.8 1.11 -2615.8
(123-01) CBP-0810-022 12376 189/-11 339.6 353.0 12.5 0.55 -2655.2
(123-01) CBP-0810-027 12276 171/-5 278.2 290.7 11.2 1.21 -2619.4
(123-03) CBP-0810-032 12395 176/-29 327.1 338.9 10.2 1.09 -2766.7
(123-04) CBP-0830-041 12241 211/49 354.3 371.4 12.1 0.42 -2445.2
(123-03) CBP-0830-042 12292 165/-27 200.1 251.6 31.5 0.32 -2808.4
(123-04) CBP-0830-054 12243 202/17 290.0 305.8 15.1 0.34 -2624.7
(123-04) CBP-0850-047 12320 186/-24 381.6 393.7 10.8 0.73 -2873.0
(123-03) CBP-0850-055 12386 139/-1 215.9 229.0 10.5 1.63 -2721.1
(123-03) CBP-0850-056 12390 139/-17 246.1 264.4 13.5 1.04 -2795.3
(123-02) CBP-0850-058 12387 147/-30 292.0 308.7 13.8 1.13 -2863.5
(123-03) CBP-0850-059 12377 147/-15 227.4 252.6 21.3 0.80 -2784.1
(123-03) CBP-0850-060 12378 147/2 207.3 228.7 17.7 1.18 -2711.9
Principale (124-81) CBP-0250-050 12539 170/49 128.3 137.8 7.9 0.44 -698.5
(124-81) CBP-0250-051 12538 170/58 141.1 160.8 16.7 0.62 -669.6
(124-81) CBP-0250-053 12531 192/45 49.2 55.8 6.6 0.31 -757.2
Explo U 117 CBW-1069 11700 010/-77 4068.2 4104.3 21.8 0.15 -4501.6
CBW-1069 11,600 010/-73 4,190.8 4,206.1 12.10 0.64 (4,601.3)
Explo S 100 CBS-099-047EXT 10550 360/-72 4068.2 4104.3 14.4 0.15 -2615.5
Explo S 124 CBS-15-624 12900 360/-60 1200.8 1235.2 64.0 0.20 -802.2

San Sebastian (Mexico)

Zone

Drill Hole
Number

Sample
From (ft)

Sample To
(ft)

Width
(feet)

True Width
(feet)

Gold
(oz/ton)

Silver
(oz/ton)

East Francine Vein SS-797 95.1 127.4 32.2 32.2 0.09 26.05
East Francine Vein SS-798 67.7 86.4 18.6 18.6 1.18 358.73
East Francine Vein SS-801 53.6 65.2 11.5 11.5 0.87 160.80
East Francine Vein SS-802 41.3 59.6 18.3 18.2 0.58 61.94
East Francine Vein SS-804 113.7 128.9 15.2 15.2 0.22 12.15
East Francine Vein SS-805 61.9 89.3 27.4 27.4 0.11 42.14
East Francine Vein SS-806 25.5 41.9 16.4 16.4 0.38 9.85
East Francine Vein SS-807 39.3 57.9 18.7 18.7 0.26 25.35
East Francine Vein SS-808 84.9 100.0 15.1 15.1 0.78 120.32
East Francine Vein SS-811 64.3 70.0 5.8 5.5 0.15 29.46
Middle Vein SS-771 241.7 243.9 2.2 2.0 0.17 12.15
Middle Vein SS-790 764.7 773.7 9.0 8.9 0.02 11.06
Middle Vein SS-799 322.7 330.2 7.5 7.0 0.10 13.19
Middle Vein SS-808 366.1 369.7 3.6 3.6 0.04 2.11
Middle Vein SS-836 259.3 264.4 5.2 5.1 0.02 5.09
Middle Vein SS-838 116.5 128.4 12.0 11.3 0.03 2.04
Middle Vein SS-846 252.3 262.3 10.0 9.6 0.02 4.04
Middle Vein SS-852 147.2 156.4 9.2 9.2 0.02 5.40
Middle Vein SS-856 280.6 285.9 5.3 5.3 0.01 4.03
Middle Vein SS-859 143.0 146.2 3.1 3.1 0.22 12.21
Middle Vein SS-863 148.8 156.1 7.3 7.3 0.57 157.33
Middle Vein SS-865 202.2 207.5 5.2 5.2 0.01 5.30
Middle Vein SS-867 139.5 141.3 1.8 1.8 0.01 4.66
Middle Vein SS-868 93.9 99.4 5.5 5.5 0.24 26.85
Middle Vein SS-870 155.3 161.6 6.2 5.0 0.19 25.50
Middle Vein SS-872 261.3 266.8 5.5 5.1 0.04 5.58
Middle Vein SS-873 115.4 118.4 3.1 3.1 0.13 42.16
Middle Vein SS-875 175.9 184.0 8.2 8.2 0.18 18.25
Middle Vein SS-876 244.8 252.0 7.2 6.9 0.04 9.46
Middle Vein SS-877 141.1 143.7 2.6 2.6 0.13 37.72
Middle Vein SS-878 173.7 180.0 6.2 5.9 0.05 7.01
North Vein SS-773 459.7 464.3 4.6 4.6 0.11 5.67
North Vein SS-777 479.3 484.6 5.2 5.2 0.03 4.87
North Vein SS-778 579.9 584.0 4.1 4.1 0.01 14.78
North Vein SS-782 669.2 675.2 6.0 5.6 0.03 8.15
North Vein SS-784 423.8 424.4 0.6 0.6 0.21 9.07
North Vein SS-785 528.0 537.3 9.3 9.2 0.02 4.75
North Vein SS-794 692.4 697.7 5.2 5.2 0.01 6.75
North Vein SS-799 773.0 778.0 5.0 5.0 0.04 11.72
North Vein SS-832 104.9 108.4 3.5 3.5 0.24 8.24
North Vein SS-835 74.3 76.0 1.6 2.6 0.84 16.77
North Vein SS-837 67.4 70.0 2.6 2.5 0.74 5.51
North Vein SS-839 83.5 99.7 16.2 15.5 0.08 2.96
North Vein SS-840 19.5 26.9 7.4 7.1 0.18 0.48
North Vein SS-843 68.5 70.3 1.8 1.8 0.49 6.42
North Vein SS-845 76.6 94.0 17.4 17.3 0.15 9.48
North Vein SS-848 75.3 77.4 2.1 3.1 0.69 10.12
North Vein SS-850 74.3 78.3 4.0 3.9 0.61 6.40
North Vein SS-851 54.7 62.8 8.1 8.1 0.13 5.39
North Vein SS-853 54.3 60.0 5.7 5.7 0.27 5.33
North Vein SS-854 25.7 42.9 17.2 17.2 0.10 2.32
North Vein SS-857 57.0 66.9 10.0 9.9 0.30 3.13
North Vein SS-858 44.3 52.5 8.2 8.0 0.30 3.63
North Vein SS-860 40.2 45.0 4.8 4.5 0.12 2.22
North Vein SS-861 67.5 71.9 4.4 3.2 0.10 2.11
North Vein SS-896 10.4 14.8 4.4 4.3 0.24 3.19
North Vein Foot Wall Vein SS-896 100.5 102.5 2.0 2.0 0.01 5.31


Contact

Hecla Mining Company
Mike Westerlund, 800-HECLA91 (800-432-5291)
Vice President – Investor Relations
hmc-info@hecla-mining.com
http://www.hecla-mining.com


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!




Mineninfo
Hecla Mining Company
Bergbau
854693
US4227041062
Minenprofile
Alle Angaben ohne Gewähr! Copyright © by GoldSeiten.de 1999-2024.
Die Reproduktion, Modifikation oder Verwendung der Inhalte ganz oder teilweise ohne schriftliche Genehmigung ist untersagt!

"Wir weisen Sie ausdrücklich auf unser virtuelles Hausrecht hin!"