Suche
 
Folgen Sie uns auf:

Silvercorp Reports its 2015 Resource Expansion Drilling at the SGX Mine, Ying Mining District, China

16.11.2015  |  CNW

Trading Symbol:
TSX: SVM
NYSE: SVM

VANCOUVER, Nov. 16, 2015 /CNW/ - Silvercorp Metals Inc. ("Silvercorp" or the "Company") (TSX:SVM) is pleased to report the results of its on-going exploration program in the first three quarters of 2015 at the SGX mine, Ying Mining District, Henan Province, China.

The 2015 exploration program consists of (1) resource upgrade tunneling and step out drilling on major production vein structures S2, S4, S6, S7, S7-1, S8, S14, S16W, S21, S22 and S29 and (2) definition drilling of their parallel subzones and splay structures and veins that have not been well explored such as S19 and S19E. Results of the current exploration program continues to demonstrate the strike and downdip extension of major mineralized vein structures. The most significant new discovery thus far has been the S19 that is becoming an important production vein utilizing the existing mining facilities in the nearby S16W and S7-1 vein structures.

Highlights of selected intersections of drill holes for the S19 vein:

  • Hole ZK03S7-111 intersected a 3.94 meter ("m") interval from 66.47m to 70.41m, 2.19m true width, of vein S19 grading 422 grams per tonne ("g/t") silver ("Ag"), 18.32% lead ("Pb") and 0.32% zinc ("Zn") at the 212m elevation, including an 1.5m interval, 0.83m true width, grading 837g/t Ag, 49.64% Pb and 0.76% Zn, a 0.64m interval from 278.01m to 278.65m, 0.4m true width, of vein S7-1 grading 753g/t Ag, 6.87% Pb and 2.58% Zn at the 40m elevation, and an 1.63m interval from 285.56m to 287.19m, 1.08m true width, of vein S7-1E grading 308g/t Ag, 0.69% Pb and 4.06% Zn;
  • Hole ZK3A11 intersected an 1.73m interval from 37.12m to 38.85m, 1.19m true width, of vein S19 grading 596g/t Ag, 2.31% Pb and 0.42% Zn at the 253m elevation, and a 2.04m interval from 182.33m to 184.37m, 1.93m true width, of vein S7-1 grading 1,000g/t Ag, 2.03% Pb and 5.24% Zn at the 199m elevation;
  • Hole ZK9AS1901 intersected a 2.23m interval from 139.16m to 141.39m, 1.46m true width, of vein S19 grading 398g/t Ag, 2.96% Pb and 1.69% Zn at the 387m elevation, including a 0.87m interval, 0.57m true width, grading 996g/t Ag, 5.68% Pb and 2.50% Zn; and
  • Hole ZK07S1902 intersected an 1.49m interval from 152.06m to 153.55m, 0.91m true width, of vein S19E grading 293g/t Ag, 9.42% Pb and 0.43% Zn at the 344m elevation, and a 7.4m interval from 182.02m to 189.42m, 2.71m true width, of vein S19 grading 212g/t Ag, 5.62% Pb and 0.88% Zn at the 322m elevation, including a 0.9m interval, 0.37m true width, grading 1,178g/t Ag, 19.55% Pb and 4.42% Zn.

Highlights of mineralized zones exposed in drift tunnels for the S19 vein:

  • Drift Tunnel PD700-S19-490-15NYM exposed mineralization of 100m long and 0.97m wide grading 430g/t Ag, 5.55% Pb and 3.95% Zn within vein structure S19 on the 490m level.

A total of 25,623m diamond drilling in 97 holes were completed with 8 underground rigs in the first three quarters of 2015. Most of the holes were designed as stepout and test holes to penetrate multiple vein structures for resource expansion and new resource delineation between the 640m and minus 110m elevations. Drill stations were mainly located in underground workings at the present development and mining levels. Stepout holes were drilled around previously defined resource blocks to further expand the known mineral resources and test drilling was targeted at the strike and downdip extensions of known mineralized vein structures to seek new mineralized zones and parallel vein structures. A total of 1,376 core samples were collected from intersections of altered and mineralized vein structures. As of September 30, the Company received assay results for 92 holes, including 17 holes drilled in late 2014 and 75 holes completed in 2015. 54 of the 92 holes intersected one or multiple mineralized zones and other holes intercepted target structures.

Exploration tunneling comprised drifting, crosscutting and raising between levels 750m and 180m. A total of 10,232m underground tunneling, including 6,960m drift tunneling, was driven along and across major production veins on 14 levels, and 3,408 channel samples were collected. As of September 30, 2015, the on-going exploration tunneling program exposed a total of 2,854m mineralization of 0.74m in average width grading 298g/t Ag, 5.7% Pb and 3.03% Zn. The exposed mineralization constitutes 41% of the completed 6,960m drift tunneling.

Tables 1 and 2 below list the assay results of some selected mineralized intersections in drill holes and mineralized zones exposed in drift tunnels.

Table 1: Selected drilling results from the SGX Mine in the first three quarters of 2015












Hole ID

From
(m)

to (m)

Elevation
(m)

Sample
Length
(m)

True
Width
(m)

Ag
(g/t)

Pb
(%)

Zn
(%)

Mineralized
Vein

Remarks

ZK5A11

17.56

19.13

260

1.57

1.56

305

3.24

0.31

S19

Infill*


149.84

152.41

224

2.57

2.43

392

0.27

0.38

S7-1

Stepout**

ZK12AS16W2001

281.59

282.84

348

1.25

0.59

464

9.09

0.31

S16W2

Stepout

ZK08S1802

244.22

245.76

431

1.54

1.1

89

0.17

0.43

New zone,
to be named

Testing***

ZK07S1901

172.42

173.06

384

0.64

0.42

11

0.97

2.79

S19

Stepout

ZK08A21

192.44

192.84

134

0.4

0.33

124

0.27

0.38

S14

Stepout

ZK07S1902

152.06

153.55

344

1.49

0.91

293

9.42

0.43

S19E

Test


182.02

189.42

322

7.4

2.71

212

5.62

0.88

S19

Stepout


Including

183.35

184.25

321

0.9

0.37

1,178

19.55

4.42



ZK10S1401

135.71

137.26

195

1.55

0.81

412

6.41

0.57

S14-2

Stepout


187.12

187.66

168

0.54

0.43

162

4.34

0.82

S14-1

Test


207.02

208.1

158

1.08

0.57

135

1.77

0.24

S14

Stepout

ZK0531

26.03

29.27

252

3.24

2.45

145

5.93

1.75

S19

Infill


Including

27.09

27.77

251

0.68

0.52

638

25.37

7.31



ZK9AS1901

139.16

141.39

387

2.23

1.46

398

2.96

1.69

S19

Test


Including

140.52

141.39

386

0.87

0.57

996

5.68

2.50



ZK5A12

30.17

31.37

245

1.2

1.08

39

2.89

0.31

S19

Infill

ZK08A25

85.86

86.34

186

0.48

0.28

171

2.03

0.81

S6E

Test


273.28

273.7

16

0.42

0.26

135

2.14

0.02

S14-1

Test

ZK9AS1902

250.65

251.8

249

1.15

0.74

161

1.37

15.8

S19W

Test

ZK020801

50.49

51.4

236

0.91

0.66

164

1.49

0.61

S29

Test


115.47

117.55

200

2.08

1.41

159

17.04

0.18

S2W

Stepout

ZK6014

323.1

324.09

-32

0.99

0.73

14

1.42

2.41

S16W

Test

ZK09S1902

158.22

160.91

330

2.69

1.65

189

11.28

1.18

S19

Stepout

ZK0532

39.12

43.16

234

4.04

2.79

173

2.29

1.81

S19

Infill

ZK0533

56.41

59.41

214

3

1.77

492

13.95

0.38

S19

Infill


Including

57.23

57.79

213

0.56

0.33

1,422

73.94

0.44



ZK0206A01

193.85

194.75

134

0.9

0.46

190

6.72

6.87

S2W2

Test

ZK09S8004

155.46

157.13

201

1.67

1.58

147

0.49

0.12

S8

Test

ZK09S8006

149.31

149.99

149

0.68


77

0.37

1.58

New zone,
to be named

Test


219.92

220.63

93

0.71

0.47

171

9.40

3.19

S8

Test

ZK0711

146.31

149.94

184

3.63

3.15

125

0.50

0.2

S7-1

Stepout

ZK03S1901

245.13

245.87

323

0.745

0.54

51

1.86

3.53

S19

Infill

ZK01S1901

58.09

59.03

433

0.94

0.9

347

4.3

1.06

S16W2

Test


198.72

199.28

385

0.56

0.53

20

0.17

3.81

S19E

Test


231.64

232.64

374

1

0.95

138

2.4

2.63

S19

Test

ZK3A11

37.12

38.85

253

1.73

1.19

596

2.31

0.42

S19

Test


182.33

184.37

199

2.04

1.93

1,000

2.03

5.24

S7-1

Stepout


Including

182.33

183.67

199

1.34

1.27

1,496

2.81

7.24



ZK01S1902

263.62

265.78

289

2.16

1.63

301

6.07

0.53

S19

Test

ZK1A11

214.21

215.61

156

1.4

1.1

275

0.43

0.31

S7-2

Stepout


233.14

233.8

146

0.66

0.5

303

0.66

0.79

S7-1

Stepout

ZK05S1901

51.75

54.20

436

2.45

1.75

150

1.43

3.61

S16W1

Infill


281.05

281.63

357

0.58

0.44

1,725

5.07

7.08

S19

Stepout

ZK1A12

57.32

58.15

224

0.83

0.41

172

9.11

0.78

S19

Test

ZK07S8010

256.53

257.71

52

1.18

0.62

228

1.71

0.83

S8W

Test

ZK5S8002

26.46

27.02

627

0.56

0.53

215

4.18

4.73

S7-1

Test

ZK03S7-111

66.47

70.41

212

3.94

2.19

422

18.92

0.32

S19

Test


Including

67.53

69.03

211

1.5

0.83

837

49.64

0.76




278.01

278.65

40

0.64

0.4

753

6.87

2.58

S7-1

Test


285.56

287.19

34

1.63

1.08

308

0.69

4.06

S7-1E

Test

ZK03S7-112

86.7

89.4

188

2.7

1.14

190

5.21

1.13

S19

Test


306.76

307.47

-9

0.71

0.39

67

0.20

3.00

S7-2

Test


341.39

342.03

-40

0.64

0.33

22

3.15

1.66

S7-1

Test

ZK7AS8003

182.93

184.14

165

1.21

0.81

249

8.93

0.89

S8

Test

ZK12A7502

243.7

245.16

70

1.46

1.17

174

2.36

0.92

S7E

Test

ZK5808

214.77

215.74

191

0.97

0.34

108

0.73

1.08

S16E

Test

ZK7AS8005

203.56

205.09

103

1.53

0.84

164

1.80

0.41

S8W

Test

ZK3A14

307.64

310.81

-5

3.17

2.19

124

0.23

7.17

S7-1

Test

ZK7S8003

22.27

22.8

630

0.53

0.39

55

0.24

9.30

S7-1

Test












*Infill: intersections within previous lower-category resource blocks for resource upgrade;

**Stepout: intersections adjacent to existing resource blocks for resource expansion;

***Test: intersections in open areas without known mineralized intersections nearby.

 

Table 2: Selected mineralized zones exposed by exploration tunneling at the SGX Mine in the first three quarters of 2015









Drift Tunnel

Target Vein

Elevation

(m)

Length
(m)

Average
Width
(m)

Ag
g/t

Pb %

Zn %

XPD-S2-520-2NYM

S2

520

35

0.41

330

2.00

4.41

CM105-S2-260-12SYM

S2

260

60

1.10

900

20.05

4.34

CM105-S2-260-14NYM

S2

260

65

0.74

576

7.75

4.90

PD16-S2-260-6ASYM

S2

260

60

0.51

130

3.19

0.38

CM105-S2-220-12SYM

S2

220

75

0.84

663

12.35

1.31

CM105-S2-220-14NYM

S2

220

90

0.87

345

8.70

1.12

PD16-S2W-400-2ANYM

S2W

400

40

0.46

178

2.31

1.17

CM105-S2W2-260-12ANYM

S2W2

260

62

0.95

143

3.61

3.83

PD16-S4-400-8NYM

S4

400

75

0.45

290

3.55

7.28

PD16-S4-350-8ANYM

S4

350

65

0.50

312

2.43

7.62

PD16-S4-300-8NYM

S4

300

30

0.58

245

1.21

5.12

PD16-S6-450-10NYM

S6

450

85

0.37

116

1.49

1.46

PD16-S6-260-4ANYM

S6

260

31

0.52

238

4.08

1.14

CM105-S6E1-260-12ANYM

S6E1

260

80

0.55

355

5.06

4.77

CM105-S6E1-220-12SYM

S6E1

220

55

0.46

201

3.49

2.49

PD750-S7-750-0SMW-ECM14

S7

750

127

1.13

205

2.44

4.31

CM105-S7-260-8ANYM

S7

260

65

0.84

187

4.33

0.41

PD700-S7-1-450-13ANYM

S7-1

450

27

0.98

140

4.95

2.09

PD700-S7-1-450-15ASYM

S7-1

450

25

0.88

106

7.82

2.22

PD700-S7-1-400-11SYM

S7-1

400

20

0.53

216

2.24

4.77

XPD-S7-1-300-3SYM

S7-1

300

80

1.13

303

8.91

2.11

XPD-S7-1E-300-5SYM

S7-1E

300

45

0.72

218

6.30

6.47

CM102-S7-2-400-4ASYM

S7-2

400

108

0.61

155

3.98

1.70

CM101-S7-2-350-1BSYM

S7-2

350

56

0.80

63

2.44

4.84

CM102-S8-480-14NYM

S8

480

60

0.89

36

4.56

2.16

CM101-S8-400-SYM

S8

400

53

0.95

422

7.26

2.29

CM102-S8-350-2ASYM

S8

350

30

0.85

114

1.14

1.95

CM102-S8E-440-2ASYM

S8E

440

105

0.83

139

1.12

5.40

CM102-S8E-400-4SYM

S8E

400

55

0.57

104

3.65

4.72

XPD-S14-520-4SYM

S14

520

40

0.83

347

7.62

1.11

XPD-S14-520-2BNYM

S14

520

110

0.58

522

6.59

0.84

CM105-S14-220-12SYM

S14

220

70

0.76

872

8.65

1.05

CM105-S14-220-12NYM

S14

220

20

0.59

112

2.71

1.70

PD16-S14-2-450-8NYM

S14-2

450

35

0.40

107

0.64

7.60

CM102-S14-555-NMW

S14E-branch

555

15

0.65

583

9.04

3.38

PD690-S16W2-690-12NYM

S16W2

690

45

0.92

190

4.85

0.83

CM101-S16W2-400-1ASYM

S16W2

400

40

0.73

113

2.62

7.61

CM101-S16W2-400-1ANYM

S16W2

400

50

0.52

112

2.10

8.21

PD700-S19-570-13NYM

S19

570

50

0.44

225

7.77

3.72

PD700-S19-530-17NYM

S19

530

25

0.87

265

7.30

1.50

PD700-S19-530-13ANYM

S19

530

95

0.67

296

5.71

1.46

PD700-S19-490-15NYM

S19

490

100

0.97

430

5.55

3.95

CM101-S19-350-8SYM

S19

350

40

1.02

180

6.96

0.19

CM105-S19-300-10SYM

S19

300

35

1.06

209

5.15

0.18

XPD-S19-300-3SYM

S19

300

45

0.97

322

7.28

2.06

XPD-S19-260-7SYM

S19

260

20

0.56

136

3.68

0.63

CM105-S21-260-8ANYM

S21

260

25

0.75

104

3.35

1.43

CM101-S21W1-350-8ANYM

S21W1

350

40

1.01

371

8.16

1.41

CM101-S21W1branch-350-8ANYM

S21W1branch

350

20

0.70

573

17.99

0.25

CM105-S22-260-8ASYM

S22

260

10

0.50

350

8.13

0.56

PD16-S29-350-2ANYM

S29

350

20

0.39

191

3.65

2.26

PD16-S29-350-0SYM

S29

350

40

0.57

564

3.97

12.99

Longitudinal sections for the veins showing the location of the drilling results in this news release are available at the following Company link:

http://www.silvercorpmetals.com/English/projects/ying-mining-district/lm-mine/Long-Sections. - See more at: http://www.silvercorpmetals.com/news/news-release-details/2014/Silvercorp-Reports-High-Grade-Zones-at-the-SGX-Mine-Ying-Mining-District-China/default.aspx#sthash.SWfPbH9U.dpuf

Quality Control

Drill cores are NQ size. Drill core samples, limited by apparent mineralization contact or shear/alteration contact, were split into halves by saw cutting. The half cores are stored in the Company's core shacks for future reference and checking, and the other half core samples are shipped in security sealed bags to the Chengde Huakan 514 Geology and Minerals Testing and Research Institute in Chengde, Hebei Province, China, 226 km northeast of Beijing, and the Zhenzhou Nonferrous Exploration Institute Lab in Zhengzhou, Henan Province, China, and both labs are ISO9000 certified analytical lab. For analysis the sample is dried and crushed to minus 1mm and then split to a 200-300g subsample which is further pulverized to minus 200 mesh. Two subsamples are prepared from the pulverized sample. One is digested with aqua regia for gold analysis with AAS, and the other is digested with two-acids for analysis of silver, lead, zinc and copper with AAS.

Channel samples are collected along sample lines perpendicular to the mineralized vein structure in exploration tunnels. Spacing between sampling lines is typically 5m along strike. Both the mineralized vein and the altered wall rocks are cut with continuous chisel chipping. Sample length ranges from 0.2m to more than 1m, depending on the width of the mineralized vein and the mineralization type. Channel samples are prepared and assayed with AAS at Silvercorp's mine laboratory (Ying Lab) located at the mill complex in Luoning County, Henan Province, China. The Ying lab is officially accredited by the Quality and Technology Monitoring Bureau of Henan Province and is qualified to provide analytical service. The channel samples are dried, crushed and pulverized. A 200g sample of minus 160 mesh is prepared for assay. A duplicate sample of minus 1mm is made and kept at the laboratory archives. A 0.5g pulp sample is treated with two-acid digestion and assayed for silver, lead, zinc and copper with AAS.

A routine quality assurance/quality control procedure is adopted at each lab to monitor the analytical quality at the lab. Certified reference materials (CRMs), pulp duplicates and blanks are inserted into each lab batch of samples. QA/QC data at the lab are attached to the assay certificates for each batch of samples.

The Company maintains its own comprehensive quality assurance and quality control program to ensure best practice in sample preparation and analysis of the exploration samples. Project geologists regularly insert CRM, field duplicates and blanks to each batch of core samples to monitor the sample preparation and analysis procedures at the labs. The analytical quality of the labs is further evaluated with external checks by sending about 3-5% of the pulp samples to higher level labs to check for lab bias.

Data from both the Company's and the labs' QA/QC programs are reviewed on a timely basis by project geologists.

Ruijin Jiang, P. Geo. reviewed the exploration data and prepared the scientific and technical information regarding exploration results contained herein. Alex Zhang, P. Geo, VP exploration of the Company, is the Qualified Person on the project as defined under National Instrument 43-101 and he has verified and approved the contents of this news release.

About Silvercorp

Silvercorp is a low-cost silver-producing Canadian mining company with multiple mines in China. The Company's vision is to deliver shareholder value by focusing on the acquisition of under developed projects with resource potential and the ability to grow organically.  For more information, please visit our website at www.silvercorp.ca.

CAUTIONARY DISCLAIMER - FORWARD LOOKING STATEMENTS

Certain of the statements and information in this press release constitute "forward-looking statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 and "forward-looking information" within the meaning of applicable Canadian provincial securities laws. Any statements or information that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as "expects", "is expected", "anticipates", "believes", "plans", "projects", "estimates", "assumes", "intends", "strategies", "targets", "goals", "forecasts", "objectives", "budgets", "schedules", "potential" or variations thereof or stating that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved, or the negative of any of these terms and similar expressions) are not statements of historical fact and may be forward-looking statements or information.  Forward-looking statements or information relate to, among other things: the price of silver and other metals; the accuracy of mineral resource and mineral reserve estimates at the Company's material properties; the sufficiency of the Company's capital to finance the Company's operations; estimates of the Company's revenues and capital expenditures; estimated production from the Company's mines in the Ying Mining District; timing of receipt of permits and regulatory approvals; availability of funds from production to finance the Company's operations; and access to and availability of funding for future construction, use of proceeds from any financing and development of the Company's properties.

Forward-looking statements or information are subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events or results to differ from those reflected in the forward-looking statements or information, including, without limitation, risks relating to: fluctuating commodity prices; calculation of resources, reserves and mineralization and precious and base metal recovery; interpretations and assumptions of mineral resource and mineral reserve estimates; exploration and development programs; feasibility and engineering reports; permits and licenses; title to properties; property interests;  joint venture partners; acquisition of commercially mineable mineral rights; financing; recent market events and conditions; economic factors affecting the Company; timing, estimated amount, capital and operating expenditures and economic returns of future production; integration of future acquisitions into the Company's existing operations;  competition;  operations and political conditions; regulatory environment in China and Canada;  environmental risks; foreign exchange rate fluctuations; insurance; risks and hazards of mining operations; key personnel; conflicts of interest; dependence on management; internal control over financial reporting as per the requirements of the Sarbanes-Oxley Act; and bringing actions and enforcing judgments under U.S. securities laws.

This list is not exhaustive of the factors that may affect any of the Company's forward-looking statements or information. Forward-looking statements or information are statements about the future and are inherently uncertain, and actual achievements of the Company or other future events or conditions may differ materially from those reflected in the forward-looking statements or information due to a variety of risks, uncertainties and other factors, including, without limitation, those referred to in the Company's Annual Information Form for the year ended March 31, 2014 under the heading "Risk Factors".  Although the Company has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be as anticipated, estimated, described or intended.  Accordingly, readers should not place undue reliance on forward-looking statements or information.  

The Company's forward-looking statements and information are based on the assumptions, beliefs, expectations and opinions of management as of the date of this press release, and other than as required by applicable securities laws, the Company does not assume any obligation to update forward-looking statements and information if circumstances or management's assumptions, beliefs, expectations or opinions should change, or changes in any other events affecting such statements or information. For the reasons set forth above, investors should not place undue reliance on forward-looking statements and information.

SOURCE Silvercorp Metals Inc.



Contact
Lorne Waldman, Senior Vice President, Silvercorp Metals Inc., Phone: (604) 669-9397, Toll Free: 1(888) 224-1881, Email: investor@silvercorp.ca, Website: www.silvercorpmetals.com
Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!




Mineninfo
Silvercorp Metals Inc.
Bergbau
A0EAS0
CA82835P1036
Minenprofile
Alle Angaben ohne Gewähr! Copyright © by GoldSeiten.de 1999-2024.
Die Reproduktion, Modifikation oder Verwendung der Inhalte ganz oder teilweise ohne schriftliche Genehmigung ist untersagt!

"Wir weisen Sie ausdrücklich auf unser virtuelles Hausrecht hin!"