Cancana Cancana Resources Corp. JV Provides Exploration Update for Brazil Manganese Project
- 188 drill holes have been completed to date, totalling over 10,000m. Results during the quarter included:
- 4.6m @ 22% Mn from 28.8m (Vitalino Prospect)
- 9.65m @ 19.3% Mn from 46.55m, including:
- 1.1m @ 53.5% Mn from 49.05m (Ademir-Vitoria Prospect)
- 7.15m @ 19.3% Mn from 48.4m (Eduardo Mendes Prospect)
- A third drill rig arrived on site in May and a fourth is being negotiated. Drilling will focus on an infill and extensional programs.
- A multi-commodity team has been formed to assess and explore for other metals on the license package.
Anthony Julien, President & CEO of Cancana stated, "Significant progress continues to be made and with a fourth drill rig being negotiated the project continues to accelerate. The current exploration team has been expanded to focus on multiple activities from quarter two, with infill drilling, reconnaissance drilling and multi-commodity exploration all planned."
EXPLORATION OVERVIEW
Exploration mapping, trenching and drilling programs continued through wet season over the first quarter of 2016 following a short post-Christmas closure in January. Targets are being progressively evaluated and activities are being supported by a community relations (CSR) team, established to facilitate exploration agreements and maintain close relationships and with local landholders. Support for BMC's activities has generally been positive, and the team is continuing to gain access to various areas.
The mapping and trenching activities have expanded the database of known manganese occurrences in the district. New areas are being scheduled for both pre-production activities (for short-term colluvial mining), and for deeper primary vein exploration. Over 5,000m of exploration trenching and 10,000m of drilling have been completed to date. Valuable information has also been gathered where mining activities have exposed profiles through some of the newly identified vein systems.
The exploration program has continued with broad reconnaissance traverses to confirm the position of vein systems associated with the dispersed colluvial manganese fields. BMC is currently engaged in discussions with its drilling contractors to increase the number of drill rigs so a greater emphasis can be placed on infill programs in the second and third Quarter.
MAPPING AND TRENCHING ACTIVITIES
The map below illustrates the distribution of mapping manganese occurrences compared to the original database at the commencement of activities. The distribution of new occurrences highlights the importance of E- to ENE-trending structural controls on the mineralization. NW and NE trending mineralised structures have also recently been identified, and an ongoing objective of the program will be to assess the potential for increased vein concentrations at the intersections of different mineralised trends.
Trenching activities are of prime importance in parallel with the mapping as the vein systems can often be concealed by the soil and laterite profile. Three trenching crews are currently engaged with the mapping and pre-production teams to delineate the distribution of manganese colluvium in the cover sequence and the position of underlying veins.
To view Figure 1, please visit the following link: http://www.marketwire.com/library/20160511-800cny1.jpg
To view Figure 2, please visit the following link: http://www.marketwire.com/library/20160511-800cny1a.jpg
In addition to regional mapping, more detailed surveys are being conducted where extraction activities have provided exposure of the vein profiles. In some areas, such as Dnei-Zenilda, the individual veins form more tabular bodies which have been extracted over a strike length of ~180m to date. In other areas such as Jaburi 2, multiple veins are present, not all of which project to the surface due to their tapering geometry. This indicates some areas will require tailored drilling programs to ensure the full package of veins is located and characterised.
Cuttings into the vein profile have been made at the Adesvaldo and Lucas prospects. The current plants are restricted in having no effective crushing facilities to liberate manganese minerals from the hard breccia material of these areas. The planned pilot plant will provide greater flexibility in processing such material (see September 15, 2015 news release). The vein positions in these areas are being surveyed with a differential GPS survey instrument. Mapped positions will be integrated with drilling information to assist with structural modelling.
To view Figure 3, please visit the following link: http://www.marketwire.com/library/20160511-800cny2a.jpg
To view Figure 4, please visit the following link: http://www.marketwire.com/library/20160511-800cny2b.jpg
To view Figure 5, please visit the following link: http://www.marketwire.com/library/20160511-800cny2c.jpg
DRILLING PROGRAM
188 drill holes have now been completed around the project area, with key corridors having undergone reconnaissance testing illustrated below. Drilling has generally continued at broad spacings of 300-500 meters along the strike of structural corridors as they are defined. Some local infill has been conducted and BMC will shortly be commencing more detailed testing in several prospects, including the Eduardo Mendes-Ademir-Vitalino corridor, the Antonio Gomes area, and on the Lavra corridor (Adesvaldo and the Dnei-Zenilda-Laudir area). Other prospects will be progressively added.
To view Figure 6, please visit the following link: http://www.marketwire.com/library/20160511-800cny3.jpg
Commentary on some of the prospects tested since the last report period are outlined below:
Eduardo Mendes -- Ademir -- Vitalino Corridor
This corridor forms a prominent ENE trending structure in the NE of the licence block. The structure has been prospected over a strike length of 14km to date. Several new zones of manganese colluvium and associated veining have now been detected on which drilling and pre-production activities are focussing. Historically ~20000t of manganese colluvium were recovered from the Eduardo Mendes prospect to the east and ~10000t from Vitalino to the west. Colluvial preproduction programs are currently testing the central Ademir area as a source of material for the 2016 production year. An application has been lodged for an extraction permit (Guia de Utilização) over this target. Preproduction activities will continue along extensions of the corridor where new domains of colluvial manganese dispersion have been located.
The broad trenching and drilling activities indicate that a number of sub-parallel structures are present. The infill drilling program will involve closer-spaced drilling initially on spacing of 100m to test the resource potential of the area. The ultimate drill spacing will be reviewed based on continuity observed in the drilling and supplementary trenching.
Drill results are tabulated in the diagrams below (with new results appended in the Intersection Table). Results of interest in the program to date from the various prospects along the trend include:
- DDH_VT_005: 4.6m @ 22% Mn from 28.8m (Vitalino Prospect)
- DDH_ADV_002: 9.65m @ 19.3% Mn from 46.55m, including
- 1.1m @ 53.5% Mn from 49.05m (Ademir-Vitoria Prospect)
- 1.1m @ 53.5% Mn from 49.05m (Ademir-Vitoria Prospect)
- DDH_ADE_002: 4.45m @ 23.85% Mn from 17.5m, including
- 1.4m @ 45.5% Mn from 17.5m (Ademir-California Prospect)
- 1.4m @ 45.5% Mn from 17.5m (Ademir-California Prospect)
- DDH_EM_0012: 7.15m @ 19.3% Mn from 48.4m (Eduardo Mendes Prospect)
As previously observed, the grade of the vein intersections correlates closely to the degree of silicate breccia associated with the mineralization. These breccia zones are an expected component of the hydrothermal systems. BMC will be conducting metallurgical testwork programs to study optimal processing scenarios for the breccia material, particularly using bulk samples from vein profiles exposed in mining operations.
To view Figure 7, please visit the following link: http://www.marketwire.com/library/20160511-800cny4a.jpg
To view Figure 8, please visit the following link: http://www.marketwire.com/library/20160511-800cny5.jpg
To view Figure 9, please visit the following link: http://www.marketwire.com/library/20160511-800cny6.jpg
Antonio Gomes Corridor
Field evaluation in the Antonio Gomes areas has identified a series of NE-trending structures associated with dispersed colluvium. These structures converge towards the main E-W structure outlined by the initial phase of drilling. An infill and extensional drill program is scheduled to commence in this area in the second quarter centered initially around the central section where multiple veins were encountered. The drill program will also test the resource potential of the NE-trending vein sets, for areas of vein thickening where the structures converge.
To view Figure 10, please visit the following link: http://www.marketwire.com/library/20160511-800cny7.jpg
Next Steps
BMC currently has two Geotechreserves do Brasil drill rigs on site, with one drill rig dedicated to infill work. BMC also has smaller drill rig from Energold Perfurações Ltda on site. BMC is in discussions with Energold to extend the current contract and to add a fourth drill rig. The smaller drill rigs allow access to steeper terrain and densely forested areas.
The infill program in nominated prospects has commenced in parallel with regional exploration continuing on new vein trends. All belts tested to date have shown the presence of manganese oxide mineralisation, and further drilling and trenching will continue to test for the potential for thickened vein zones at structurally favourable sites.
In addition to the manganese program, the newly formed multi-commodity team will assess the potential for other metals on the licence package - initial geochemical programs have commenced and updates on activities will be released shortly.
Intersection Tables | |||||||
Hole_Id | East | North | Dip | Azimuth | Depth | Intersection | |
DDH_VT_001 | 744283 | 8727924 | -50 | 340 | 31.60 | 5.2m @ 15.4% Mn from 9m | |
DDH_VT_002 | 744292 | 8727906 | -50 | 340 | 46.00 | 1.8m @ 24.2% Mn from 30.4m | |
DDH_VT_003 | 743813 | 8727854 | -50 | 160 | 50.15 | 2.5m @ 21.3% Mn from 19m | |
DDH_VT_004 | 743805 | 8727878 | -50 | 160 | 70.25 | Trace mineralization | |
DDH_VT_005 | 744178 | 8728073 | -50 | 160 | 44.00 | 4.6m @ 22% Mn from 28.8m | |
DDH_VT_006 | 744176 | 8728082 | -50 | 160 | 68.10 | 0.9m @ 16.2% Mn from 53.6m | |
DDH_VT_007 | 744297 | 8727882 | -50 | 340 | 77.00 | 7.7m @ 12.2% Mn from 55.3m | |
DDH_ADV_001 | 745150 | 8728303 | -50 | 160 | 29.00 | 4.15m @ 23.2% Mn from 11.15m | |
DDH_ADV_002 | 745141 | 8728322 | -50 | 160 | 65.40 | 1.67m @ 20.8% Mn from 10.1m 9.65m @ 19.3% Mn 46.55m | |
DDH_ADV_003 | 745133 | 8728339 | -50 | 160 | 101.20 | 3.3m @ 23% Mn from 85.4m 0.25m @ 52.5% Mn from 89.5m | |
DDH_ADV_004 | 745532 | 8728356 | -50 | 340 | 25.40 | 0.1m @ 30.1% Mn from 12.1m 0.45m @ 24.9% Mn from 14.8m | |
DDH_ADV_005 | 745544 | 8728338 | -50 | 340 | 69.90 | 0.2m @ 22.8% Mn from 0.6m 0.4m @ 27.3% Mn from 12.5m 0.4m @ 14% Mn from 37.4m | |
DDH_ADV_006 | 746165 | 8728512 | -50 | 350 | 16.40 | 2.09m @ 14.6% Mn from 4.41m | |
DDH_ADV_007 | 746161 | 8728529 | -50 | 360 | 48.10 | Trace mineralization | |
DDH_ADV_008 | 746159 | 8728526 | -50 | 180 | 33.50 | Trace mineralization | |
DDH_ADV_009 | 744751 | 8728385 | -50 | 180 | 25.20 | 4.5m @ 10.5% Mn from 8.9m | |
DDH_EM_006 | 755076 | 8731971 | -60 | 150 | 91.6 | 12.45m @ 9.8% Mn from 7.3m 2.45m @ 18.72%Mn from 68.05m 3.35m @ 8.2% Mn from 75.55m 6.55m @ 8.04% Mn from 81.35m | |
DDH_EM_007 | 754631 | 8731621 | -50 | 330 | 60.00 | 0.45m @ 15.7% Mn from 19.9m | |
DDH_EM_008 | 754360 | 8731733 | -50 | 300 | 55.10 | Trace mineralization | |
DDH_EM_009 | 754209 | 8731417 | -50 | 170 | 50.00 | Trace mineralization | |
DDH_EM_010 | 755387 | 8732158 | -50 | 140 | 64.80 | 0.95m @ 11.7% Mn from 19.75m 0.1m @ 58% Mn from 24.3m 0.4m @ 43.5% Mn from 26.5m 0.6m @ 51.7% Mn from 27.65m 0.1m @ 49.7% Mn from 30.4m 0.1m @ 41.8% Mn from 34.45m 0.7m @ 14.2% Mn from 38.4m | |
DDH_EM_011 | 755370 | 8732177 | -50 | 140 | 92.00 | 1.85m @ 33.9% Mn from 68.3m 0.2m @ 24% Mn from 72.55m 0.1m @ 24.3% Mn from 75.35m 0.15m @ 34.6% Mn from 77.45m 1.3m @ 27.2% Mn from 81.8m | |
DDH_EM_012 | 755374 | 8732079 | -50 | 150 | 80.00 | 7.15m @ 19.3% Mn from 48.4m 0.2m @ 15.7% Mn from 57m 0.55m @ 15.3% Mn from 59m 1.15m @ 15.2% Mn from 61.6m 2.15m @ 23.9% Mn from 65m | |
DDH_EM_013 | 755517 | 8732217 | -50 | 300 | 56.00 | 0.45m @ 37.6% Mn from 19.7m 2.5m @ 14.2% Mn from 22.1m 0.2m @ 20.8% Mn from 28m | |
DDH_EM_014 | 755604 | 8732153 | -50 | 160 | 77.00 | 0.35m @ 18.2% Mn from 2.2m | |
DDH_EM_015 | 755471 | 8732243 | -50 | 120 | 68.00 | Barren | |
DDH_EM_016 | 755836 | 8732315 | -50 | 160 | 40.5 | 0.25m @ 24.7% Mn from 15.75m 0.4m @ 22.4% Mn from 25.05m 0.1m @ 40.2% Mn from 26.5m | |
DDH_EM_017 | 755832 | 8732320 | -50 | 160 | 60 | 0.3m @ 45.6% Mn from 40.2m | |
DDH_CF_001 | 753139 | 8728292 | -50 | 360 | 82.20 | 0.45m @ 22.8% Mn from 16.45m 0.25m @ 19.3% Mn from 27.15m | |
DDH_CF_002 | 752814 | 8728309 | -50 | 360 | 80.70 | 0.2m @ 13.6% Mn from 31.3m | |
DDH_CF_003 | 752781 | 8728348 | -60 | 360 | 50.00 | 0.1m @ 58% Mn from 3.65m 0.35m @ 16.3% Mn from 19.4m 1m @ 14.5% Mn from 27.5m | |
DDH_CF_004 | 754238 | 8728396 | -50 | 360 | 65.20 | 0.7m @ 34.3% Mn from 9m 0.95m @ 20% Mn from 34.7m | |
DDH_CF_005 | 753950 | 8728342 | -45 | 360 | 82.50 | Trace Mineralization | |
DDH_CF_006 | 754238 | 8728383 | -50 | 360 | 73.90 | 0.1m @ 30.8% Mn from 23.6m | |
DDH_CF_007 | 753142 | 8728273 | -50 | 330 | 77.80 | Trace Mineralization | |
DDH_CF_008 | 752779 | 8728353 | -50 | 360 | 32.00 | 0.35m @ 42% Mn from 10.3m | |
DDH_LC_003 | 749323 | 8714174 | -50 | 210 | 40.90 | 1.15m @ 18.1% Mn from 12.1m | |
DDH_LC_004 | 749336 | 8714197 | -50 | 210 | 54.80 | 0.65m @ 32% Mn from 41.45m | |
DDH_LC_005 | 749438 | 8714137 | -56 | 215 | 59.00 | 0.1m @ 16.3% Mn from 31.75m | |
DDH_LC_006 | 749420 | 8714117 | -50 | 215 | 25.20 | 0.33m @ 10.7% Mn from 13.67m | |
DDH_LC_007 | 749651 | 8713969 | -60 | 210 | 41.00 | 0.3m @ 11.1% Mn from 17.7m | |
DDH_LC_008 | 749659 | 8713978 | -60 | 210 | 12.30 | Abandoned | |
DDH_AV_001 | 740140 | 8721807 | -50 | 360 | 67.10 | 0.2m @ 14.6% Mn from 47.5m | |
DDH_AV_002 | 740140 | 8721819 | -50 | 360 | 56.00 | 4.43m @ 16.2% Mn from 30.74m | |
DDH_AV_003 | 740141 | 8721832 | -50 | 360 | 44.00 | 2.5m @ 9.2% Mn from 21.9m | |
DDH_JM_001 | 742966 | 8721773 | -50 | 360 | 41.00 | Trace mineralization | |
DDH_JM_002 | 742913 | 8721779 | -50 | 360 | 39.00 | Trace mineralization | |
DDH_ED_001 | 749001 | 8720345 | -50 | 140 | 42.75 | 2.75m @ 13.5% Mn from 29.25m | |
DDH_ED_002 | 749001 | 8720357 | -50 | 140 | 95.35 | Trace mineralization | |
DDH_ZN_001 | 748624 | 8720243 | -50 | 360 | 55.30 | 1.8m @ 17.4% Mn from 15.2m 0.25m @ 18.9% Mn from 23.85m | |
DDH_ZN_002 | 748626 | 8720223 | -5 | 360 | 68.10 | 1.82m @ 14.6% Mn from 26.36m | |
DDH_ADM_001 | 749632 | 8720419 | -50 | 150 | 35.50 | Trace mineralization | |
DDH_EDS_001 | 749979 | 8720533 | -50 | 150 | 44.00 | Trace mineralization | |
DDH_AMA_001 | 748290 | 8720247 | -50 | 360 | 38.10 | Trace mineralization | |
DDH_AMA_002 | 748141 | 8720256 | -50 | 350 | 33.00 | 0.5m @ 10.40% Mn from 9.3m | |
DDH_AMA_003 | 748146 | 8720246 | -50 | 350 | 35.00 | 0.2m @ 10.7% Mn from 14.65m 0.45m @ 11.0% Mn from 16.75m | |
DDH_SC_001 | 745661 | 8718234 | -50 | 320 | 37.27 | 1.4m @ 22.1% Mn from 18.85m 0.2m @ 16.1% Mn from 24.65m | |
DDH_FP_001 | 748217 | 8724228 | -50 | 360 | 30.30 | Trace mineralization | |
DDH_FP_002 | 748217 | 8724215 | -55 | 360 | 62.00 | 0.8m @ 15.6% Mn from 61.35m | |
DDH_NZ_001 | 740804 | 8721835 | -50 | 10 | 36.20 | 0.52m @ 29.8% Mn from 14.55m | |
DDH_NZ_002 | 740804 | 8721817 | -50 | 10 | 60.40 | 0.3m @ 20.3% Mn from 44.35m 0.6m @ 15.3% Mn from 45.35m 0.2m @ 19.2% Mn from 47.25m | |
DDH_NZ_003 | 741125 | 8721880 | -50 | 180 | 54.35 | 1.9m @ 19.3% Mn from 19.35m 0.3m @ 20.2% Mn from 48.55m | |
DDH_NZ_004 | 741117 | 8721891 | -50 | 180 | 68.00 | 0.15m @ 14.9% Mn from 60.6m | |
DDH_MR_001 | 775163 | 8722628 | -50 | 160 | 30.00 | 0.27m @ 41.3% Mn from 0.83m 0.2m @ 15.2% Mn from 27.9m | |
DDH_MR_002 | 775157 | 8722649 | -55 | 160 | 51.70 | 1m @ 27.6% Mn from 0m 0.8m @ 28% Mn from 12.8m | |
DDH_MR_003 | 775682 | 8722692 | -50 | 160 | 33.30 | Trace Mineralization | |
DDH_MR_004 | 775682 | 8722692 | -70 | 160 | 45.00 | Trace Mineralization | |
DDH_MR_005 | 769653 | 8721617 | -50 | 310 | 46.9 | 1.1m @ 19.1% Mn from 21.2m 0.3m @ 17.2% Mn from 42.3m | |
DDH_MR_006 | 769661 | 8721611 | -50 | 310 | 69.20 | 2.6m @ 23.4% Mn from 35.45m | |
DDH_MR_007 | 769609 | 8721652 | -55 | 130 | 90.4 | 1.35m @ 18.6% Mn from 57.45m 1.85m @ 16.5% Mn from 61.8m | |
DDH_MR_008A | 776925 | 8722743 | -55 | 180 | 23.60 | 0.2m @ 31.9% Mn from 9.3m 0.55m @ 32.7% Mn from 15.75 | |
DDH_MR_009 | 776018 | 8722750 | -60 | 180 | 45.15 | 1m @ 20.8% Mn from 25.2m | |
DDH_ARO_001 | 747686 | 8720299 | -50 | 260 | 48.00 | 1.75m @ 20.3% Mn from 0.45m | |
DDH_ARO_002A | 747686 | 8720272 | -50 | 350 | 63.00 | Trace mineralization | |
DDH_NB_001 | 767981 | 8720246 | -50 | 120 | 35.00 | Trace mineralization | |
DDH_FT_001 | 762316 | 8722599 | -50 | 10 | 46.70 | Trace mineralization | |
DDH_FT_002 | 762318 | 8722582 | -50 | 10 | 70.00 | 0.55m @ 26.2% Mn from 27.75m | |
DDH_ADR_001 | 747168 | 8720335 | -50 | 350 | 21.00 | 0.35m @ 38.4% Mn from 9.95m | |
DDH_ADR_002 | 747171 | 8720319 | -50 | 350 | 45.00 | Trace mineralization | |
DDH_GL_001 | 749233 | 8719592 | -50 | 180 | 28.00 | Trace mineralization | |
DDH_GL_002 | 749235 | 8719601 | -55 | 180 | 55.00 | Trace mineralization | |
DDH_IN_001 | 748234 | 8719433 | -50 | 360 | 32.00 | 0.4m @ 15.8% Mn from 4.8m 0.4m @ 19.2% Mn from 15.15m | |
DDH_IN_002 | 748233 | 8719426 | -55 | 360 | 52.6 | Trace mineralization | |
DDH_SO_001 | 746834 | 8719489 | -50 | 360 | 22.00 | 0.3m @ 22.5% Mn from 12.05m | |
DDH_SO_002 | 746835 | 8719474 | -50 | 360 | 42.20 | Trace mineralization | |
DDH_DP_001 | 746593 | 8720351 | -50 | 180 | 43.00 | Trace mineralization | |
DDH_DP_002 | 746591 | 8720357 | -50 | 180 | 59.00 | 1.3m @ 17% Mn from 5.3m 3.6m @ 15.9% Mn from 11m 1.7m @ 16.9% Mn from 18.5m | |
DDH_EVE_001 | 746260 | 8720204 | -50 | 180 | 25.00 | Trace mineralization | |
DDH_EVE_002 | 746251 | 8720231 | -50 | 180 | 65.00 | Trace mineralization | |
DDH_EDE_001 | 744753 | 8722041 | -50 | 180 | 45.00 | Trace mineralization | |
DDH_EDE_002 | 744753 | 8722054 | -50 | 180 | 65.00 | Trace mineralization | |
DDH_AG_004 | 747316 | 8725248 | -45 | 120 | 24.00 | 0.12m @ 30.3% Mn from 0.88m 0.1m @ 37.9% Mn from 5.15m 0.1m @ 36.3% Mn from 13.1m 0.1m @ 16.9% Mn from 14.3m | |
DDH_AG_005 | 747310 | 8725269 | -50 | 120 | 51.00 | 0.1m @ 19% Mn from 11.8m 1m @ 14.2% Mn from 23.3 m 0.2m @ 17.2% Mn from 28.4m 0.5m @ 12.1% Mn from 29.8m 0.3m @ 32.4% Mn from 30.9m 0.5m @ 16.2% Mn from 32m | |
DDH_AG_006 | 745070 | 8723497 | -50 | 360 | 38.30 | 0.1m @ 14% Mn from 15.75m 0.25m @ 12.6% Mn from 21.0m | |
DDH_AG_007 | 745070 | 8723487 | -55 | 360 | 45.30 | 0.08m @ 58% Mn from 8.68m 0.7m @ 19.5% Mn from 37.1m 0.45m @ 16.5% Mn from 38.15m | |
DDH_AG_008 | 747836 | 8725398 | -50 | 180 | 27.00 | Trace mineralization | |
DDH_AG_009 | 747827 | 8725408 | -50 | 180 | 55.50 | 0.8m @ 16.7% Mn from 34.8m | |
DDH_AG_010 | 746210 | 8723613 | -50 | 340 | 40.50 | 0.6m @ 22.4% Mn from 15.47m 0.5m @ 27.3% Mn from 18.5m | |
DDH_AG_011 | 746223 | 8723618 | -50 | 340 | 45.00 | 2.6m @ 19.4% Mn from 27m | |
DDH_AG_012 | 746216 | 8723580 | -50 | 340 | 64.50 | 0.95m @ 41.9% Mn from 16.5m 2.65m @ 23.5% Mn from 41m | |
DDH_AG_013 | 746989 | 8724983 | -50 | 360 | 57.00 | 0.85m @ 10.4% Mn from 49.5m | |
DDH_AG_014 | 745493 | 8723533 | -50 | 350 | 35.00 | 0.85m @ 23.9% Mn from 7.6m 0.2m @ 28.5% Mn from 10.5m | |
DDH_AG_015 | 745486 | 8723515 | -50 | 350 | 60.00 | 0.2m @ 48.8% Mn from 29.4m |
Intersections are quoted with down-hole widths, intersections are not true width.
On behalf of the Board of Directors of
Anthony Julien, President, CEO and Director
QUALIFIED PERSON
The technical information about the Company's mining activities has been prepared under the supervision of and verified by Dr. Adrian McArthur (B.Sc. Hons, PhD. FAusIMM), a consultant to Brazil Manganese Corporation, who is a "qualified person" within the meaning of National Instrument 43-101.
ABOUT CANCANA
Cancana Resources Corp. is focused on exploring and developing the BMC manganese project in Brazil with its joint venture partner Ferrometals BV. The JV is employing a two-pronged strategy at BMC, where the primary objective is to advance the project to an initial resource and onward to feasibility, while also expanding current small-scale production to support those exploration activities. Further information can be found at cancanacorp.com, and bmcorporation.com.br.
ABOUT FERROMETALS
Ferrometals BV is part of a privately held metals group, focusing on acquisition, exploration, development and mining activities. Further information can be found at ferrometals.net.
FORWARD-LOOKING STATEMENTS
Some statements in this news release contain forward-looking information or forward-looking statements for the purposes of applicable securities laws. These statements include, among others, statements with respect to the Company's plans for exploration and development of BMC's properties and potential mineralization. These statements address future events and conditions and, as such, involve known and unknown risks, uncertainties and other factors, which may cause the actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the statements. Such risk factors include, among others, failure to obtain regulatory approvals, failure to complete anticipated transactions, the timing and success of future exploration and development activities, exploration and development risks, title matters, inability to obtain any required third party consents, operating hazards, metal prices, political and economic factors, competitive factors, general economic conditions, relationships with strategic partners, governmental regulation and supervision, seasonality, technological change, industry practices and one-time events. In making the forward-looking statements, the Company has applied several material assumptions including, but not limited to, the assumptions that: (1) the proposed exploration and development of mineral projects will proceed as planned; (2) market fundamentals will result in sustained metals and minerals prices and (3) any additional financing needed will be available on reasonable terms. The Company expressly disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise except as otherwise required by applicable securities legislation.
The Company cautions that it has not completed any feasibility studies on any of BMC's mineral properties, and no mineral reserve estimate has been established. Because the Company production decision, related to BMC, is not based upon a feasibility study of mineral reserves, the economic and technical viability of the property has not been established.
Notes
HQ-diameter drill core has been obtained from surface to end-of hole using a track-mounted Boartlongyear LF90D drill rig operated by drilling contractor Geotechreserves do Brasil and a man-portable EGD SII rig operated by Energold.
Collar positions are recorded by hand-held GPS (accuracy typically +/- 5m). The reported grid system is South America 1969, Zone 20S. Collar positions are marked with a cement plug for later survey pick up for any areas that progress to resource drilling. Down hole-deviation is measured by a Refelx Gyro survey tool.
Recovery is recorded against individual core runs whilst drilling, and any areas of core loss that can be specifically identified are recorded. Recovery is generally good to excellent. Some core loss may be incurred where the mineralized intervals are softer and friable. Overall recovery averages >90% for the reported intersections. Holes undergo geological and basic geotechnical logging, and are photographed prior to sampling. Samples are collected as half-HQ core where the core is competent. When occasionally broken, half the sample is hand-picked in the most representative way possible. Sampling is conducted to geological boundaries.
Samples are submitted to an accredited SGS Laboratory in Belo Horizonte, Brazil. Samples are dried, crushed to 3 mm, homogenised, then a split is pulverised to produce a pulp of 250 - 300 g with 95% passing 150 mesh. Submissions include certified references to monitor laboratory performance, which have returned results within the expected laboratory analytical error margins. Laboratory protocols include blanks, duplicates and repeats. Major oxides in mineralised zones are analysed by lithium-borate fusion - XRF techniques, with minor elements monitored via a multi-acid digest and ICP-OES analysis. Zones of wall rock alteration with trace mineralization are monitored analysed by multi-acid digest and ICP-OES analysis.
Until dispatch, samples are stored in BMC's supervised stockpile yard or exploration office. Individual bags are fitted with a tamper-proof bar-coded seal. The samples are couriered to the assay laboratory using a commercial contractor (Eucatur). Samples are weighed prior to dispatch and material received by the laboratory is reconciled with dispatch records. Pulps and rejects are returned to BMC. A subset is selected for periodic round-robin test work.
Contact
Cancana Resources Corp.
Anthony Julien
info@cancanacorp.com
+1-604-681-0405