Suche
 
Folgen Sie uns auf:

Scorpio Gold Produces 10,089 Ounces of Gold in Second Quarter 2016 at the Mineral Ridge Operation

14.07.2016  |  Marketwired
Announces Change in Cash Flow Distributions from the Mineral Ridge Project

VANCOUVER, Jul 14, 2016 - Scorpio Gold Corp. ("Scorpio Gold" or the "Company") (TSX VENTURE:SGN) announces its operating results for the second quarter ("Q2") of 2016 at its 70% owned Mineral Ridge project, located in Nevada.

Production at Mineral Ridge in Q2 of 2016 totalled 10,089 ounces of gold and 4,325 ounces of silver, representing increases of 16% and 20% respectively over Q2 2015 production levels. The increased metal production is primarily attributed to higher crusher throughput, resulting in increased recoverable ounces placed on the heap leach pad and expected improvement in leach pad recoveries, as previously reported. Total gold production for the first half ("H1") of 2016 now stands at 18,597 ounces, a decrease of 10% from H1 of 2015. The Company's 2016 production forecast remains unchanged at 30,000 to 35,000 ounces of gold (as reported in the Company's March 23, 2016 news release).

Peter J. Hawley, President & CEO, comments, "The Company is pleased to report another solid quarter of production at Mineral Ridge. We continue to focus on operational excellence while meeting our production forecast for 2016. The Company continues to evaluate ways to enhance the economics of the Mineral Ridge project without affecting safety and overall performance."

Production in the second half of 2016 is scheduled from the Mary LC pit and from the Missouri satellite pit.

Key Operating Statistics
Three months ending
June 30
Six months ending
June 30
2016 2015 Change 2016 2015 Change
Mining operations
Mary LC pit
Ore tonnes mined 138,795 - 100.0 % 285,667 - 100.0 %
Waste tonnes mined 919,453 - 100.0 % 1,622,483 - 100.0 %
Total mined 1,058,248 - 100.0 % 1,908,150 - 100.0 %
Strip Ratio 6.6 - 100.0 % 5.7 - 100.0 %
Satellite pits
Ore tonnes mined 39,493 56,046 -29.5 % 142,745 114,119 25.1 %
Waste tonnes mined 139,664 113,521 23.0 % 366,720 285,873 28.3 %
Total mined 179,157 169,567 5.7 % 509,465 399,992 27.4 %
Strip Ratio 3.5 2.0 75.0 % 2.6 2.5 4.0 %
Mary pit
Ore tonnes mined - 78,343 -100.0 % - 196,307 -100.0 %
Waste tonnes mined - 298,704 -100.0 % - 1,043,681 -100.0 %
Total mined - 377,047 -100.0 % - 1,239,988 -100.0 %
Strip Ratio - 3.8 -100.0 % - 5.3 -100.0 %
Total producing pits
Ore tonnes mined 178,288 134,389 32.7 % 428,412 310,426 38.0 %
Waste tonnes mined 1,059,117 412,225 156.9 % 1,989,203 1,329,554 49.6 %
Total mined 1,237,405 546,614 126.4 % 2,417,615 1,639,980 47.4 %
Strip Ratio 5.9 3.1 90.3 % 4.6 4.3 7.0 %
Pits under development
Ore tonnes mined - 53,264 -100.0 % - 92,146 -100.0 %
Waste tonnes mined 67,732 1,190,883 -94.3 % 123,354 1,995,432 -93.8 %
Total mined 67,732 1,244,147 -94.6 % 123,354 2,087,578 -94.1 %
Total mining operation
Ore tonnes mined 178,288 187,653 -5.0 % 428,412 402,572 6.4 %
Waste tonnes mined 1,126,849 1,603,108 -29.7 % 2,112,557 3,324,986 -36.5 %
Total mined 1,305,137 1,790,761 -27.1 % 2,540,969 3,727,558 -31.8 %
Processing
Tonnes processed 275,551 194,651 41.6 % 527,138 413,023 27.6 %
Gold head grade (g/t) 1.33 1.37 -2.9 % 1.48 1.39 6.5 %
Tonnes milled at Goldwedge facility - - - - 1,392 -100.0 %
Gold head grade (g/t) - - - - 8.87 -100.0 %
Ounces produced
Gold 10,089 8,738 15.5 % 18,597 20,690 -10.1 %
Silver 4,325 3,591 20.4 % 8,246 9,910 -16.8 %
Recoverable(1) gold (ounces) placed on pad 8,002 5,769 38.7 % 17,034 12,428 37.1 %
(1) A weighted average metallurgical recovery factor has been applied to the estimated contained ounces crushed and placed on the leach pad based on the pit from which the ore was mined.

Change to cash flow distributions from the Mineral Ridge project

On July 4, 2016, the settlement price of gold on the LBMA PM fix exceeded $1,350, and as such under the terms of the Mineral Ridge operating agreement, the Company's entitlement to cash flows distributed from the Mineral Ridge mine reverted to 70% from the previous 80% entitlement. Under the terms of the operating agreement, the 10% additional amount distributed to Scorpio, representing an amount of $35,714, from distributions made after the operating agreement amendment in August, 2015, was repaid in full to Elevon, LLC. For more information, see the Company's news release dated August 17, 2015.

About Scorpio Gold

Scorpio Gold holds a 70% interest in the Mineral Ridge gold mining operation located in Esmeralda County, Nevada with joint venture partner Elevon, LLC. Mineral Ridge is currently in production as a conventional open pit mining and heap leach operation. The Mineral Ridge property is host to multiple gold-bearing structures, veins and lenses at exploration, development and production stages. Scorpio Gold also holds a 100% interest in the advanced exploration-stage Goldwedge property in Manhattan, Nevada, with a fully permitted underground mine and 400 ton per day mill facility. The Goldwedge mill facility has been placed on a care and maintenance basis and can be restarted immediately when needed.

Scorpio Gold's President & CEO, Peter J. Hawley, PGeo, is a Qualified Person as defined by National Instrument 43-101 and has reviewed and approved the content of this release.

ON BEHALF OF THE BOARD

SCORPIO GOLD CORPORATION

Peter J. Hawley, President & CEO

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

The Company relies on litigation protection for forward-looking statements. This news release contains forward-looking statements that are based on the Company's current expectations and estimates. Forward-looking statements are frequently characterized by words such as "plan", "expect", "project", "intend", "believe", "anticipate", "estimate", "suggest", "indicate" and other similar words or statements that certain events or conditions "may" or "will" occur, and include, without restriction, any statements regarding the Company achieving production forecasts for 2016, or planned future production schedules. Such forward-looking statements involve known and unknown risks, uncertainties and other factors that could cause actual events or results to differ materially from estimated or anticipated events or results implied or expressed in such forward-looking statements, including risks related to open pit mining and heap leach operations, including unanticipated changes in the mineral content of materials being mined; unanticipated changes in recovery rates; changes in project parameters; failure of equipment or processes to operate as anticipated; the failure of contracted parties to perform; availability of skilled labour and the impact of labour disputes; delays in obtaining governmental approvals; changes in metals prices; the availability of cash flows or financing to meet the Company's ongoing financial obligations; unanticipated changes in key management personnel; changes in general economic conditions; other risks of the mining industry; and those risk factors outlined in the Company's Management Discussion and Analysis as filed on SEDAR. Any forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise. Forward-looking statements are not guarantees of future performance and accordingly undue reliance should not be put on such statements due to the inherent uncertainty thereof.



Contact

Scorpio Gold Corp.
Peter J. Hawley, President & CEO
(819) 825-7618
phawley@scorpiogold.com
www.scorpiogold.com

Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!




Mineninfo
Scorpio Gold Corp.
Bergbau
A3E2GX
CA80918M3021
Minenprofile
Alle Angaben ohne Gewähr! Copyright © by GoldSeiten.de 1999-2024.
Die Reproduktion, Modifikation oder Verwendung der Inhalte ganz oder teilweise ohne schriftliche Genehmigung ist untersagt!

"Wir weisen Sie ausdrücklich auf unser virtuelles Hausrecht hin!"