Suche
 
Folgen Sie uns auf:

Osisko Intersects 27.6 g/t Au Over 3.1 Metres at Fox

23.11.2016  |  Marketwired

New Mineralization Intersected NW, SE and SW of Fox Discovery Hole


MONTREAL, QUEBEC--(Marketwired - Nov. 23, 2016) - Osisko Mining Inc. (TSX:OSK) ("Osisko" or the "Corporation") is pleased to announce new results from the Fox discovery, located 3.7 kilometres NW of the Windfall Lake Gold Deposit. The exploration drill program at Fox is part of the ongoing 150,000 metre drill program at Osisko's 100% owned Windfall Lake gold project. 

Significant new results from the exploration drilling at Fox include: 27.6 g/t Au over 3.1 metres in DDH OSK-U-16-734; 8.04 g/t Au over 3.0 metres in DDH OSK-U-16-732; 6.78 g/t Au over 2.0 metres in DDH OSK-U-16-731; and 5.14 g/t Au over 2.1 metres in DDH OSK-U-16-736.

The Fox discovery was made with DDH OSX-W-16-717 (which returned 3.22 g/t Au over 11.6 metres, see Osisko press release dated August 29, 2016). The discovery underscores the strong potential that exists for new gold mineralization on the Urban-Barry property, particularly in areas proximal to the expanding Windfall gold deposit. Additional drilling is planned to follow up on these new results and to test lateral extensions of the mineralization. Significant results from four new exploration holes are presented in the table below.

Hole Number From (m) To (m) Interval (m) Au (g/t) Zone
OSK-U-16-732 65.5 68.5 3.0 8.04 Fox
including 67.0 68.5 1.5 16.1
OSK-U-16-734 406.0 409.1 3.1 27.6 Fox
including 407.0 407.7 0.7 96.2
and 408.8 409.1 0.3 48.0
OSK-U-16-736 260.6 262.7 2.1 5.14 Fox
OSK-U-16-736 313.0 315.6 2.6 4.32 Fox
OSK-U-16-738 217.8 221.7 3.9 2.58 Fox
Notes:  
(1) For complete drilling results please see www.osiskomining.com
(2) True Widths of the new exploration intercepts reported in this press release have yet to be determined. Additional drilling is planned for the immediate area which will enable the true width determination

Drill Hole Collar Coordinates and Information

Hole Number Azimuth
 (°)
Dip
 (°)
Length
 (m)
UTM
 Easting
UTM
 Northing
OSX-W-16-716 331.6 -45.1 602.5 448895 5435348
OSX-W-16-721 327.0 -45.0 486.6 448442 5436942
OSX-W-16-723 331.7 -43.8 766.5 447874 5436916
OSX-W-16-725 330.0 -50.0 583.5 447946.8 5436105.6
OSK-U-16-729 330.4 -43.0 483.5 450104.1 5433288.5
OSK-U-16-730 330.4 -44.7 502.5 449901.4 5433571.9
OSK-U-16-732 330.7 -55.8 421.5 448759 5435644
OSK-U-16-733 358.7 -54.4 502.5 448759 5435644
OSK-U-16-734 302.0 -45.9 560.5 448759 5435644
OSK-U-16-736 302.1 -60.3 590.5 448759 5435644
OSK-U-16-738 275.7 -45.7 547.5 448758 5435640

The Fox Zone mineralization occurs within a zone of strong texturally-destructive sericite and silica alteration in bleached andesitic volcanics containing pyrite stringers. In the area of the discovery, the gold mineralization is cross-cut by a post-mineral porphyry dyke and mineralization occurs both in the hanging wall and the footwall of the dyke. The mineralized zones at Fox are very similar to those seen peripheral to high grade gold zones at the nearby Windfall gold deposit.

DDH OSK-U-16-732 intersected shallow mineralization 100 metres to the southeast of the Fox discovery hole OSX-W-16-717, returning 8.04 g/t Au over 3.0 metres in altered andesite containing minor pyrite.

DDH OSK-U-16-734 intersected 27.6 g/t Au over 3.1 metres in a series of laminated quartz-tourmaline veins containing visible gold located 180 metres to the northwest of the Fox Zone.

DDH OSK-U-16-736 intersected the Fox Zone 100 metres to the southwest and 100 metres deeper than the discovery intersection in DDH OSX-W-16-717. The intersection returned 5.14 g/t Au over 2.1 metres in a strongly sericitized andesite with pyrite stringers.

DDH OSK-U-16-738 returned 2.58 g/t Au over 3.9 metres from the hanging wall of a porphyry dyke, in a moderately bleached andesite with pyrite stringers.

Exploration DDH's OSX-W-16-716, -721, -723, -725; and OSK-U-16-729, -730, -733 returned no significant results.

Full analytical results from the four exploration drill holes are available at www.osiskomining.com.

Qualified Person

The scientific and technical content of this press release has been reviewed, prepared and approved by Mr. Jean-Philippe Desrochers, Ph.D., P.Geo. Senior Project Manager of the Windfall Lake gold project, who is a "Qualified Person" as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101").

Quality Control

True widths of the new exploration intercepts reported in this press release have yet to be determined. Additional drilling is planned for the immediate area which will enable the true width determination. Assays are uncut except where indicated. All NQ core assays reported were obtained by either 1 kg whole rock metallic screen/fire assay or standard 50 gram fire-assaying with AA or gravimetric finish at ALS Laboratories in Val d'Or, Québec or Sudbury, Ontario. The 1 kg metallic screen assay method is selected by the geologist when samples contain coarse gold or present a higher percentage of pyrite than surrounding intervals. All samples are also analysed for multi-elements, including silver, using an Aqua Regia-ICP-AES method at ALS laboratories. Drill program design, Quality Assurance/Quality Control and interpretation of results is performed by qualified persons employing a QA/QC program consistent with NI 43-101 and industry best practices. Standards and blanks are included with every 20 samples for QA/QC purposes by the Corporation as well as the lab. Approximately 5% of sample pulps are sent to secondary laboratories for check assays.

About the Windfall Lake Gold Deposit

The Windfall Lake gold deposit is located between Val-d'Or and Chibougamau in the Abitibi region of Québec, Canada. The current mineral resource comprises 2,762,000 tonnes at 8.42 g/t Au (748,000 ounces) in the indicated category and 3,512,000 tonnes at 7.62 g/t Au (860,000 ounces) in the inferred category (sourced from a technical report dated June 10, 2015 entitled "Preliminary Economic Assessment of the Windfall Lake Gold Property, Québec, Canada" with an effective date of April 28, 2015, prepared in accordance with NI 43-101). The Windfall Lake gold deposit is currently one of the highest grade resource-stage gold projects in Canada. The bulk of the mineralization occurs in the Main Zone, a southwest/northeast trending zone of stacked mineralized lenses, measuring approximately 600 metres wide and at least 1,400 metres long. The deposit is well defined from surface to a depth of 500 metres, and remains open along strike and at depth. Mineralization has been identified only 30 metres from surface in some areas and as deep as 870 metres in others, with significant potential to extend mineralization up and down-plunge and at depth.

About Osisko Mining Inc.

Osisko is a mineral exploration company focused on the acquisition, exploration, and development of precious metal resource properties in Canada. Osisko holds a 100% in the high-grade Windfall Lake gold deposit located between Val-d'Or and Chibougamau in Québec and holds a 100% undivided interest in a large area of claims in the surrounding Urban Barry area (82,400 hectares), a 100% interest in the Marban project located in the heart of Québec's prolific Abitibi gold mining district, and properties in the Larder Lake Mining Division in northeast Ontario, including the Jonpol and Garrcon deposits on the Garrison property, the Buffonta past producing mine and the Gold Pike mine property. The Corporation also holds interests and options in a number of additional properties in northern Ontario. Osisko continues to be well financed and has approximately $80 million in cash and cash equivalents as well as marketable securities of approximately $50 million.

Cautionary Note Regarding Forward-Looking Information

This news release contains "forward-looking information" within the meaning of the applicable Canadian securities legislation that is based on expectations, estimates and projections as at the date of this news release. The information in this news release about, potential mineralization, the ability to realize upon any mineralization in a manner that is economic, the ability to complete any proposed exploration activities and the results of such activities; the continuity or extension of any mineralization; and any other information herein that is not a historical fact may be "forward-looking information". Any statement that involves discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions, future events or performance (often but not always using phrases such as "expects", or "does not expect", "is expected", "anticipates" or "does not anticipate", "plans", "budget", "scheduled", "forecasts", "estimates", "believes" or "intends" or variations of such words and phrases or stating that certain actions, events or results "may" or "could", "would", "might" or "will" be taken to occur or be achieved) are not statements of historical fact and may be forward-looking information and are intended to identify forward-looking information. This forward-looking information is based on reasonable assumptions and estimates of management of Osisko, at the time it was made, involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of Osisko to be materially different from any future results, performance or achievements expressed or implied by such forward-looking information. Such factors include, among others, risks relating to property interests; ability to obtain required approvals, complete definitive documentation and complete transactions on the terms announced, ability of Osisko to complete further exploration activities, including drilling; the results of exploration activities; risks relating to mining activities; the global economic climate; metal prices; dilution; environmental risks; and community and non-governmental actions. Although the forward-looking information contained in this news release is based upon what management believes, or believed at the time, to be reasonable assumptions, Osisko cannot assure shareholders and prospective purchasers that actual results will be consistent with such forward-looking information, as there may be other factors that cause results not to be as anticipated, estimated or intended, and neither Osisko nor any other person assumes responsibility for the accuracy and completeness of any such forward-looking information. Osisko does not undertake, and assumes no obligation, to update or revise any such forward-looking statements or forward-looking information contained herein to reflect new events or circumstances, except as may be required by law.



Contact

John Burzynski
President and Chief Executive Officer
(416) 363-8653


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!




Mineninfo
Osisko Mining Inc.
Bergbau
-
-
Minenprofile
Alle Angaben ohne Gewähr! Copyright © by GoldSeiten.de 1999-2024.
Die Reproduktion, Modifikation oder Verwendung der Inhalte ganz oder teilweise ohne schriftliche Genehmigung ist untersagt!

"Wir weisen Sie ausdrücklich auf unser virtuelles Hausrecht hin!"