Suche
 
Folgen Sie uns auf:

Critical Elements: High-Grade Lithium Drill Results at Lemare

24.11.2016  |  Marketwired

- High-grade lithium confirmed by diamond drilling at Lemare

- Results include 21 m @ 2.65% Li2O, 41.5 m @ 1.71% Li2O and 23 m @ 1.61% Li2O

- All lithium mineralisation contained within spodumene

- Main pegmatite extended to 300 m length, and open to the northeast

- New spodumene pegmatite identified to the SW, 600 m strike, up to 4.26% Li2O in rock chip samples


MONTREAL, QUEBEC--(Marketwired - Nov 24, 2016) - Critical Elements Corp. ("Critical Elements" or the "Company") (TSX VENTURE:CRE) (OTCQX:CRECF) (FRANKFURT:F12) and Platypus Minerals Ltd (ASX: PLP) ("Platypus") are pleased to announce positive results from the Stage 1 exploration program completed at the Lemare spodumene pegmatite located in the James Bay lithium district in Quebec, Canada (Figure 1).

Platypus' first exploration program at Lemare comprised 16 diamond drill holes, totaling 1,788 m of NQ core, drilled into the Lemare pegmatite along 8 lines spaced a nominal 50 m apart. In conjunction, a program of regional rock chip sampling was undertaken along the projected extension of the pegmatite beyond the bounding lake to the southwest (Figures 2 and 3).

The drilling confirmed the presence of a high grade spodumene pegmatite that was initially identified by a series of channel samples. This pegmatite is seen to extend at least 300 m along strike and remains open to the NE. It is up to 20 m in true width and pinches and swells both along strike and down dip (Figures 4 and 5). The pegmatite is closed off to the SW where it approaches a lake.

Several parallel pegmatites were intersected by the drilling. These are generally low grade and only sporadically mineralized.

Better drilling results include:

41.5 m @ 1.71% Li2O, including 15 m @ 2.18% Li2O and 3 m @ 3.6% Li2O in hole LE-16-14;
21m @ 2.65% Li2O in hole LE-16-13;
18.85 m @ 1.35% Li2O, including 8.4 m @ 2.26% Li2O in hole LE-16-07; and
23 m @ 1.61% Li2O, including 10.5 m @ 2.51% Li2O in hole LE-16-03.

Full details and results of the drilling are presented in Tables 1 and 2, below.

Rock chip sampling along the projected extension of the pegmatite beyond the lake to the SW has identified a new zone of spodumene mineralization over a 600 m strike length (Figure 2). This zone remains open to the SW.

Fairly consistent grades of 2% - 3% Li2O were recorded from intermittent pegmatite outcrops along a 600 m long semi-coherent zone (average of 10 samples is 2.3% Li2O). This represents new mineralization that is even more prospective than the area just drilled and is therefore an attractive future drilling target.

The total Lemare spodumene-prospective pegmatite strike length now exceeds 1.2 km.

The new SW zone will ideally require further prospecting, including trenching, and detailed mapping to determine the length and width of the pegmatite zone ahead of drilling the optimal target area.

Under the terms of the Lemare Option Agreement, Platypus is earning up to a 75% interest in the project. To maintain its position, Platypus has an initial requirement to spend $800,000 on exploration by March 31, 2017 (extended from December 31, 2016 by mutual agreement) of which approximately $450,000 has been spent to date.

Platypus is considering whether to drill the SW zone now or to defer drilling until after systematic exploration can be undertaken in the summer season.

Table 1. Results from the 16 diamond drill holes completed during the Stage 1 program at Lemare

Hole_ID From
(m)
To
(m)
Down Hole
Interval (m)
Li2O
(%)
True Width
(m)
LE-16-01 40.7 56.6 15.9 1.26 10.77
incl 45.2 50.9 5.7 2.15 3.86
LE-16-02 No Significant Result
LE-16-03 17.2 18.7 1.5 0.6 1
25.9 31.6 5.7 0.21 3.8
38.8 61.8 23 1.61 15.72
incl 44.8 55.3 10.5 2.51 7.18
LE-16-04 29.3 32.3 3 0.97 2.03
47.9 51.9 4 1.25 2.81
60.8 63.3 2.5 0.71 1.76
LE-16-05 32.7 41.2 8.5 1.16 6.12
incl 35.2 40.5 5.3 1.79 3.82
46 47.75 1.75 2.28 1.31
86.3 100.5 12.2 0.08 9.26
LE-16-06 68.5 85.85 17.35 0.5 13.13
incl 73.9 76.25 2.35 1.92 1.78
132.9 137.25 4.35 0.12 3.39
139.45 144.6 5.15 0.12 4.02
LE-16-07 36 54.85 18.85 1.35 13.8
incl 39.6 48 8.4 2.26 6.15
LE-16-08 100.3 106.5 6.2 0.08 4.18
LE-16-09 81.85 85.85 4 0.72 2.72
87.7 95.7 8 0.38 5.44
LE-16-10 40.2 47.1 6.9 0.17 4.98
85.5 105 19.5 0.22 14.18
LE-16-11 8.8 23.65 14.85 0.25 9.77
32.3 34.5 2.2 0.25 1.45
44.8 46.8 2 0.1 1.32
LE-16-12 14.45 32.9 18.45 0.87 6.37
incl 24.5 32.9 8.4 1.43 2.9
55.5 62.5 5 0.12 1.77
85 92.4 7.4 0.23 2.68
LE-16-13 5.5 34 28.5 2.16 18.01
incl 7 28 21 2.65 13.27
LE-16-14 10.5 52 41.5 1.71 14.26
Incl 13.5 28.5 15 2.18 5.18
And 42 48 6 3.6 2.06
LE-16-15 Missed Target
LE-16-16 No Significant Result
Overall intersections calculated on total width of pegmatite. Inclusive high grade zones calculated using 1% Li2O cut with up to 1m of internal dilution.

Table 2. Lemare Diamond Drilling Collar Information

Hole_ID Easting Northing RL Depth (m) AZIMUTH DIP
LE-16-01 471652 5734437 323 63 335 -50
LE-16-02 471652 5734437 323 135 335 -70
LE-16-03 471704 5734457 324 72 335 -50
LE-16-04 471751 5734464 323 91 348 -46
LE-16-05 471799 5734501 329 225 335 -45
LE-16-06 471716 5734434 324 284 334 -43
LE-16-07 471849 5734507 329 81 335 -45
LE-16-08 471863 5734473 327 126 335 -50
LE-16-09 471815 5734468 327 126 335 -50
LE-16-10 471902 5734526 328 105 335 -45
LE-16-11 471778 5734526 319 57 155 -50
LE-16-12 471778 5734526 319 102 155 -70
LE-16-13 471640 5734456 323 51 335 -50
LE-16-14 471640 5734456 323 102 335 -70
LE-16-15 471610 5734396 320 51 335 -45
LE-16-16 471565 5734392 313 117 335 -45
Holes are NQ diamond and located in UTM NAD83 Zone 18 coordinates

Jean-Sébastien Lavallée (OGQ #773), geologist, shareholder and President and Chief Executive Officer of the Company and a Qualified Person under NI 43-101, has reviewed and approved the technical content of this release.

About Critical Elements Corporation

A recent financial analysis (Technical Report and Preliminary Economic Assessment (PEA) on the Rose lithium-tantalum Project, Genivar, December 2011) of the Rose project, 100% owned by Critical Elements, based on price forecasts of US$260/kg ($118/lb) for Ta2O5 contained in a tantalite concentrate and US$6,000/t for lithium carbonate (Li2CO3) showed an estimated after-tax Internal Rate of Return (IRR) of 25% for the Rose project, with an estimated Net Present Value (NPV) of CA$279 million at an 8% discount rate. The payback period is estimated at 4.1 years. The pre-tax IRR is estimated at 33% and the NPV at $488 million at a discount rate of 8%. (Mineral resources are not mineral reserves and do not have demonstrated economic viability). (The preliminary economic assessment is preliminary in nature). (See press release dated November 21, 2011.)

The conclusions of the PEA indicate the operation would support a production rate of 26,606 tons of high purity (99.9% battery grade) Li2CO3 and 206,670 pounds of Ta2O5 per year over a 17-year mine life.

The project hosts a current Indicated resource of 26.5 million tonnes of 1.30% Li2O Eq. or 0.98% Li2O and 163 ppm Ta2O5 and an Inferred resource of 10.7 million tonnes of 1.14% Li2O Eq. or 0.86% Li2O and 145 ppm Ta2O5.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Figure 1 is available at the following link: http://media3.marketwire.com/docs/1077726a_CRE_Fig1.pdf

Figure 2 is available at the following link: http://media3.marketwire.com/docs/1077726a_CRE_Fig2.pdf

Figure 3 is available at the following link: http://media3.marketwire.com/docs/1077726a_CRE_Fig3.pdf

Figure 4 is available at the following link: http://media3.marketwire.com/docs/1077726a_CRE_Fig4.pdf

Figure 5 is available at the following link: http://media3.marketwire.com/docs/1077726a_CRE_Fig5.pdf



Contact

Jean-Sebastien Lavallee, P.Geo.
President and Chief Executive Officer
819-354-5146
president@cecorp.ca
www.cecorp.ca
Investor Relations:
Paradox Public Relations
514-341-0408


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!




Mineninfo
Critical Elements Lithium Corp.
Bergbau
A1H7ZM
CA22675W1077
Minenprofile
Alle Angaben ohne Gewähr! Copyright © by GoldSeiten.de 1999-2024.
Die Reproduktion, Modifikation oder Verwendung der Inhalte ganz oder teilweise ohne schriftliche Genehmigung ist untersagt!

"Wir weisen Sie ausdrücklich auf unser virtuelles Hausrecht hin!"