Suche
 
Folgen Sie uns auf:

Alexco Expands Bermingham Silver Deposit, Initial Tests Confirm Excellent Metallurgical Performance

08.12.2016  |  CNW

VANCOUVER, Dec. 8, 2016 /CNW/ - Alexco Resource Corp. (TSX:AXR, NYSE?MKT:AXU) ("Alexco" or the "Company") today announced results from the final 32 of 50 drill holes comprising the balance of the 2016 diamond drill program in the Bermingham deposit area of the Keno Hill Silver District ("KHSD") in Canada's Yukon Territory. Preliminary metallurgical test results from Bermingham have also been received.

Numerous significant silver-rich intercepts have been received in the latest batch of Bermingham results including true width intercepts ranging from 7.16 meters ("m") grading 4,375 grams per tonne ("g/t") (140.7 ounces per ton ("oz/t")) silver, and 3.98 meters grading 6,477 g/t (208.2 oz/t) silver in the extensively mineralized Bear Vein, to an initial intercept grading 1,676 g/t (53.9 oz/t) silver over a true width of 0.51 meters in the newly identified and contiguous West Dipping Vein.

Metallurgical testing on mineralized material from the Bermingham deposit indicates expected silver and lead recoveries in the 94% to 96% range while producing a lead concentrate grading in excess of 60% lead and 30,000 g/t silver. Metallurgical parameters used to achieve these results are consistent with the current flowsheet of the existing District Mill at Keno Hill.

Alexco President and CEO Clynt Nauman commented "In addition to excellent metallurgical results, we now recognize four silver-rich mineralized vein sets in the Bermingham discovery area, the most important  being the Bear Vein that ranges in true width up to 7.49 meters at 87.3 oz/t silver (K-16-0608) and in grade up to 239.9 oz/t silver over 4.98 meters true width (K-15-0580) and has been traced with relatively close spaced drilling over a down-plunge extent of 270 meters (over a vertical range of 230 meters) with an increased plunge width of up to 100 meters. The top of the deposit is approximately 160 meters from surface and the deposit remains open at depth.

The picture emerging from the Bermingham discovery is one reflecting the tenor and geometry of historically mined ores at Keno Hill with these most recent results returning numerous very high grade intercepts ranging from 12 kilograms per tonne (387 oz/t) silver over 2.1 meters true width to 33 kilograms per tonne (1,069 oz/t) over a narrower interval of 0.18 m true width. This pattern is what makes Keno Hill the world class high grade silver district it is; and more importantly it demonstrates that new high grade silver discoveries are still to be made even within one kilometer of the 90 million ounce producing historic Hector-Calumet mine."

Bermingham Drill Composite Assay Interval Highlights (Refer to Table 2 for complete results)

  • K-16-0611: intercepted the Bear Vein over a true width of 7.16 m from 275.38 m with a composite assay of 4,375 g/t (140.7 oz/t), including 0.31 m from 278.74 m at 12,666 g/t (407.2 oz/t) silver; 0.29 m from 288.37 m at 19,141 g/t (615.4 oz/t) silver, and 0.18m from 289.06 m at 33,271 g/t (1,069.7 oz/t) silver.

  • K-16-0620: intercepted the Bear Vein over a true width of 3.98 m from 257.90 m with a composite assay of 6,477 g/t (208.3 oz/t), including nine intervals between 0.09 – 0.25 m in true width assaying over 200 oz/t silver up to a maximum of 0.18 m from 261.60 m at 26,069 g/t (838.2 oz/t) silver.

  • K-16-0610: intercepted three veins including:


    the Bear Vein over a true width of 1.84 m from 278.00 m with a composite assay of 1,894 g/t (60.9 oz/t) silver, that included several narrow veinlets to 7 centimeters wide assaying over 200 oz/t silver including one from 282.14 m at 21,182 g/t (681.0 oz/t) silver,


    and the newly recognized West Dipping Vein over 0.51 m true width from 334.86 m with a composite assay of 1,676 g/t (53.9 oz/t) silver, including 0.22 m from 335.63 m at 3,583 g/t (115.2 oz/t) silver.

  • K-16-0613 intercepted the Bear Vein over a true width of 2.1 m from 269.78 m with a composite assay of 1,371 g/t (44.1 oz/t) silver including 0.86 m from 270.20 m at 2,812 g/t (90.41 oz/t) silver.

  • K-16-0626 intercepted the Bear Vein over a true width of 5.15 m from 376.1 m with a composite assay of 746 g/t (24.0 oz/t) silver including 1.41 m from 380.2 m with a composite assay of 2,309 g/t (74.24 oz/t) silver.

While the assay results reported here are presented at the usual +30 g/t Ag composites (with up to two meters unmineralized material), it is noteworthy that the calculation of similar composites at a 1,500 g/t (48.2 oz/t) silver cut off demonstrate the extremely high grade nature of the deposit, with significant intercepts that include:

  • 226.3 oz/t silver over 1.85 m true width from 304.44 m in K-16-0610;

  • 158.0 oz/t silver over 3.60 m true width from 275.62 m and 407.9 oz/t silver over 1.04 m true width from 287.00 m in K-16-0611;

  • 77.8 oz/t silver over 1.21 m true width from 340.40 m in K-16-0615; and

  • 387.4 oz/t silver over 2.11 m true width from 259.90 m in K-16-0620.

Metallurgy

Metallurgical test work using composited mineralized material from the Bermingham deposit is on-going at SGS Group Management SA of Vancouver B.C. under the direction of International Metallurgical and Environmental Inc. Preliminary test results confirm that the Bermingham high grade silver zone will have excellent metallurgical performance in the District Mill that Alexco operates for the recovery of silver, lead and zinc.

Test work has demonstrated that silver and lead recoveries are expected to be in the range of 94% to 96%, while producing a lead concentrate grading in excess of 60% lead and 30,000 g/t silver. Zinc recovery is predicted to be in the range of 70% to 75% to a zinc concentrate grading in excess of 50% zinc. Metallurgical parameters used to achieve these results are consistent with the operation of the existing process plant at Keno Hill, including primary grind targets and reagent utilization experienced during active plant operations between 2011 and 2013.

The Bermingham zone material fits well into a metallurgical model, which incorporates data from a number of deposits in the KHSD including the Bellekeno, Flame and Moth and Lucky Queen deposits. 

Geology and Drilling

The 2016 Bermingham surface drill program was completed in early November with 50 drill holes totaling 17,371 m of diamond drilling. This drilling has achieved resource definition coverage with intersections at 20 – 30 m centers confirming the size and grades of the projected high grade shoot (see press release dated September 13 2016, entitled "Alexco Confirms, Expands High Grade Silver Zone at Bermingham Deposit; Drilling Continues").

The additional results have confirmed the extremely high grades of the Bear Vein developed in a favourable structural orientation approximately 50 m to the northeast of, and continuous with, the adjacent mineralized Bermingham and Bermingham Footwall vein structures that have a current indicated  resource estimate in the Etta and the Artic Zones (not including the Bear Zone) of 377,000 tonnes with average grade of 430 g/t silver totaling 5.2 million ounces of silver (see news release dated April 29, 2015, entitled "Alexco Announces Indicated Silver Resource Estimate Increases of 17% at Flame & Moth and 37% at Bermingham, Resulting in a 10% Increase Overall for Keno Hill Silver District").

The Bear Vein mineralization lies in a position controlled by a flexure in the Bermingham and Bermingham Footwall vein-fault structures and is located stratigraphically above the inferred unique stratigraphic and structural setting occupied by the adjacent Hector-Calumet mine. Although the vein and fault geometry is complex, it has now been 3D modeled to include a previously unknown highly mineralized west-dipping conjugate vein set. This work has additionally confirmed the position of and offset along a post-mineral cross-fault at depth.

The drilling also confirmed that mineralized vein development does continue at depth into the favourable Hector-Calumet stratigraphy, although less highly mineralized at the locations tested. The vein structure remains open at depth, as well as along the Bermingham and Bermingham Footwall veins in the vicinity of existing mineralization where structural architecture similar to that of the Bear Vein discovery remains untested.

The mineralogy of the Bear Zone is characterized by the presence of a complex silver bearing mineral assemblage including pyrargyrite (ruby silver), freibergite, argentiferous galena, stephanite, polybasite and wire silver in a dominantly sideritic gangue. The mineralized structures exhibit textures indicative of prolific fluid flow, hydro-brecciation, and fluid boiling during several pulses of mineralization and fault movement.

A new resource estimation, that will link the mineralization in the vicinity of the Bear Vein to the existing Etta and Arctic resource zones, is currently being prepared by SRK Consulting (Canada) Inc. and is anticipated to be released prior to year end.   

Beyond the exploration drilling and metallurgical test work, other work in the Bermingham area in 2016 has included completion of hydrological well drilling and geotechnical investigation, as well as waste rock characterization studies to support permitting activity.

Details of the drill holes are shown in Table 1. Composite assay grades and intervals, calculated at a 30 g/t silver cutoff restricted to include a maximum of two meters unmineralized dilution, used to identify the mineralized zones are shown in Table 2. The locations of the drill holes are shown in Figures 1 and 2 and are available for review on the Company's website at www.alexcoresource.com.

Notes

The 2016 exploration drill program and sampling protocol has been reviewed, verified and compiled by Alexco's geologic staff under the supervision of Alan McOnie, Vice President, Exploration for Alexco and a Qualified Person as defined by National Instrument 43-101 ("NI 43-101"). The metallurgical testing information in this news release has been reviewed and verified by Jeffrey B. Austin P. Eng., President International Metallurgical and Environmental Inc. and a Qualified Person as defined by NI 43-101. A rigorous quality control and quality assurance protocol is used on the project, including blank, duplicate and standard reference samples in each batch of 20 samples delivered to the assay lab. Drill core samples were shipped through ALS Minerals Labs at Whitehorse, Yukon for preparation, fire assay, multi-element ICP and overlimit analyses completed at the ALS Minerals facility in North Vancouver, British Columbia. The disclosure of scientific and technical information about Alexco's mineral projects contained in this news release has also been reviewed and approved by Mr. McOnie.

About Alexco

Alexco Resource Corp. owns the Bellekeno silver mine, one of several mineral properties held by Alexco which encompass substantially all of the historical Keno Hill Silver District located in Canada's Yukon Territory. Employing a unique business model, Alexco also provides mine-related environmental services, remediation technologies and reclamation and mine closure services to both government and industry clients through the Alexco Environmental Group, its wholly-owned environmental services division.

Keno Hill Silver District History

Between 1921 and 1988, the Keno Hill Silver District was a world-class silver producer, with more than 217 million ounces of silver produced at average grades of 44 oz/t silver, 6.7% lead and 4% zinc (Cathro 2006).  These historical production grades would rank Keno Hill in the top 3% by grade of today's global silver producers.

Some statements ("forward-looking statements") in this news release contain forward-looking information concerning the Company's anticipated results and developments in the Company's operations in future periods, planned exploration and development of its properties, plans related to its business and other matters that may occur in the future, made as of the date of this news release.  Forward-looking statements may include, but are not limited to, statements with respect to future remediation and reclamation activities, future mineral exploration, the estimation of mineral reserves and mineral resources, the realization of mineral reserve and mineral resource estimates, future mine construction and development activities, future mine operation and production, the timing of activities and reports, the amount of estimated revenues and expenses, the success of exploration activities, permitting time lines, requirements for additional capital and sources and uses of funds.  Forward-looking statements are subject to a variety of known and unknown risks, uncertainties and other factors which could cause actual events or results to differ from those expressed or implied by the forward-looking statements.  Such factors include, among others, risks related to actual results and timing of exploration and development activities; actual results and timing of mining activities; actual results and timing of environmental services activities; actual results and timing of remediation and reclamation activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; future prices of silver, gold, lead, zinc and other commodities; possible variations in mineable resources, grade or recovery rates; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes and other risks of the mining industry; First Nation rights and title; continued capitalization and commercial viability; global economic conditions; competition; and delays in obtaining governmental approvals or financing or in the completion of development activities.  Forward-looking statements are based on certain assumptions that management believes are reasonable at the time they are made.  In making the forward-looking statements included in this news release, the Company has applied several material assumptions, including, but not limited to, the assumption that market fundamentals will result in sustained silver, gold, lead and zinc demand and prices.  There can be no assurance that forward-looking statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements.  The Company expressly disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except as otherwise required by applicable securities legislation.

Table 1
Location and Orientation of 2016 Bermingham Drill Holes Completed after August 31, 2016
Map Projection UTM NAD83 Zone 8

Hole

Easting (m)

Northing (m)

Elevation (m)

Length (m)

Surface Azimuth

Surface Dip

Date Started

Date Completed

K-16-0588

479180.98

7086840.95

1340.30

245.26

288.0

-59.0

11/06/2016

15/06/2016

K-16-0595

479116.99

7086850.81

1336.49

155.00

332.0

-58.0

28/06/2016

30/06/2016

K-16-0596

479239.37

7086601.30

1363.38

470.00

306.0

-59.0

29/06/2016

08/07/2016

K-16-0601

479157.24

7086675.64

1353.49

383.00

304.0

-64.0

17/07/2016

23/07/2016

K-16-0604

479157.28

7086676.37

1353.57

380.00

312.0

-57.0

23/07/2016

30/07/2016

K-16-0606

479157.29

7086676.15

1353.54

386.00

309.0

-61.0

30/07/2016

04/08/2016

K-16-0607*

479184.00

7086719.00

1351.00

50.00

328.0

-63.0

04/08/2016

05/08/2016

K-16-0609

479183.83

7086719.39

1350.93

341.00

328.0

-63.0

05/08/2016

10/08/2016

K-16-0610

478971.85

7086849.98

1330.25

435.50

111.0

-60.0

10/08/2016

19/08/2016

K-16-0611

479183.65

7086719.75

1350.97

308.00

328.0

-56.5

11/08/2016

16/08/2016

K-16-0612

479157.93

7086675.40

1353.57

404.00

306.0

-69.0

12/08/2016

19/08/2016

K-16-0613

479183.11

7086720.21

1350.99

295.60

326.0

-52.5

16/08/2016

21/08/2016

K-16-0614

478971.72

7086850.14

1330.37

326.00

113.5

-57.5

19/08/2016

24/08/2016

K-16-0615

479158.90

7086676.11

1353.62

362.00

320.0

-70.5

19/08/2016

24/08/2016

K-16-0616

479182.88

7086719.51

1351.06

341.20

304.0

-68.0

22/08/2016

27/08/2016

K-16-0617

478972.12

7086850.67

1330.39

320.40

98.0

-56.5

24/08/2016

30/08/2016

K-16-0618

479157.72

7086673.74

1353.64

478.00

283.0

-67.0

24/08/2016

02/09/2016

K-16-0619

479263.95

7086790.93

1347.93

329.00

292.5

-54.0

27/08/2016

03/09/2016

K-16-0620

478971.60

7086850.64

1330.35

319.00

98.0

-57.5

30/08/2016

04/09/2016

K-16-0621

479153.62

7086672.51

1353.53

593.00

248.0

-69.0

02/09/2016

14/09/2016

K-16-0622

479265.61

7086791.91

1347.72

381.60

315.0

-75.0

03/09/2016

13/09/2016

K-16-0623

478971.74

7086851.06

1330.33

327.75

82.0

-53.0

05/09/2016

11/09/2016

K-16-0624

479191.78

7086714.90

1351.60

353.00

318.0

-64.5

12/09/2016

18/09/2016

K-16-0625

479240.19

7086603.19

1363.51

508.00

307.0

-65.0

13/09/2016

25/09/2016

K-16-0626

479156.53

7086675.20

1353.81

434.00

289.0

-66.0

14/09/2016

20/09/2016

K-16-0627*

479190.50

7086716.42

1351.73

83.00

328.0

-55.0

19/09/2016

20/09/2016

K-16-0628

479190.14

7086713.15

1351.75

419.33

275.0

-77.5

20/09/2016

27/09/2016

K-16-0629

479383.59

7086566.19

1374.69

605.00

307.0

-56.0

21/09/2016

03/10/2016

K-16-0630*

479240.84

7086602.81

1363.39

271.40

307.0

-79.0

26/09/2016

30/09/2016

K-16-0631

479190.39

7086713.15

1351.67

472.00

275.0

-85.0

27/09/2016

08/10/2016

K-16-0632

479241.20

7086602.51

1363.45

656.00

307.0

-79.0

30/09/2016

28/10/2016

K-16-0633

479193.76

7086686.97

1354.18

404.05

335.0

-68.0

08/10/2016

16/10/2016


*

 Hole Abandoned

 

Table 2
Assay Composites Calculated for 2016 Bermingham Drill Holes with Assays Completed after August 31, 2016
Using 30 g/t cut-off with a maximum of two meters unmineralized internal dilution












Hole


From (m)

To (m)

Interval (m)

True Width (m)

Ag (g/t)

Ag (oz/t)

Pb (%)

Zn (%)

Au (g/t)

K-16-0596


391.55

392.00

0.45

0.32

101

3.25

0.17

4.08

0.33



395.51

397.62

2.11

1.52

911

29.30

0.28

0.23

0.31


including

395.51

396.62

1.11

0.80

1,680

54.01

0.44

0.26

0.48



417.00

417.72

0.72

0.01

324

10.42

0.74

0.06

0.04












K-16-0601


340.85

344.00

3.15

2.67

387

12.44

0.35

1.47

0.17



346.55

348.55

2.00

1.34

245

7.88

0.98

0.55

0.09












K-16-0604


311.90

312.60

0.70

5.66

50

1.62

0.32

0.49

0.05



314.70

318.25

3.55

3.16

152

4.89

1.47

0.91

0.05



321.65

322.65

1.00

0.89

375

12.06

0.59

0.02

0.04



342.25

357.20

14.95

10.75

605

19.46

1.65

0.77

0.12


including

343.25

344.15

0.90

0.65

3,030

97.42

3.75

0.90

0.17


and

350.90

351.35

0.45

0.32

4,180

134.39

5.75

0.29

0.28



361.85

362.80

0.95

0.68

4,520

145.32

0.00

0.01

0.09












K-16-0606


201.30

201.95

0.65

0.56

43

1.38

0.01

0.03

0.20



324.00

329.00

5.00

4.33

698

22.44

2.07

1.85

0.14



354.15

355.55

1.40

0.80

2,086

67.06

2.69

3.11

0.17



359.70

360.50

0.80

0.55

73

2.35

0.01

0.00

0.02



368.00

368.95

0.95

0.65

1,412

45.38

0.95

2.23

0.05


including

368.00

368.70

0.70

0.48

1,745

56.10

0.78

2.24

0.06












K-16-0609


281.90

282.05

0.15

0.06

807

25.95

1.32

14.00

0.13



295.36

295.80

0.44

0.19

1,215

39.06

0.20

8.32

0.13



299.16

312.76

13.60

3.29

625

20.08

0.97

1.49

0.12


including

305.15

305.60

0.45

0.11

7,550

242.74

14.55

8.63

0.57


and

309.43

309.97

0.54

0.13

5,350

172.01

3.90

0.55

0.42



320.49

321.76

1.27

0.87

118

3.80

0.81

2.12

0.05



323.91

324.52

0.61

0.42

342

11.00

0.33

3.50

0.06












K-16-0610


239.86

240.79

0.93

0.39

106

3.41

0.59

0.31

0.03



243.70

250.61

6.91

2.92

183

5.87

0.43

0.66

0.11



254.21

258.24

4.03

1.70

66

2.11

0.26

0.37

0.01



262.10

262.28

0.18

0.08

624

20.06

0.32

3.16

0.06



269.00

270.52

1.52

0.64

35

1.13

0.08

0.18

0.01



276.44

301.42

24.98

6.89

835

26.86

2.32

1.01

0.24


including

278.00

284.69

6.69

1.84

1,894

60.91

2.06

1.49

0.33


with

280.23

280.39

0.16

0.04

8,370

269.11

4.28

2.52

0.71


with

282.14

282.32

0.18

0.05

21,182

681.03

12.35

0.06

0.82


with

283.37

283.54

0.17

0.05

6,760

217.34

18.70

19.20

0.85


with

284.44

284.69

0.25

0.07

13,184

423.87

15.95

0.68

1.04


and

288.99

289.32

0.33

0.09

5,020

161.40

15.50

21.10

0.64



303.62

311.00

7.38

5.82

2,447

78.67

14.11

3.95

0.29


including

304.44

306.81

2.37

1.87

7,040

226.33

36.60

12.02

0.62


with

304.44

305.00

0.56

0.44

8,210

263.96

13.90

6.96

0.69


with

305.00

305.37

0.37

0.29

12,957

416.58

48.42

13.40

0.73



334.86

338.53

3.67

0.51

1,676

53.90

10.61

0.51

0.26


including

335.63

337.24

1.61

0.22

3,583

115.20

23.30

0.96

0.42












K-16-0611


275.38

292.33

16.95

7.16

4,375

140.66

13.58

3.85

0.31


including

276.66

289.49

11.23

4.75

6,431

206.77

19.07

5.70

0.44


with

277.45

278.74

1.29

0.55

7,320

235.35

31.69

6.25

0.44


with

278.74

279.48

0.74

0.31

12,666

407.23

52.35

1.78

0.47


with

279.48

280.28

0.80

0.34

8,310

267.18

26.20

6.91

0.37


with

283.78

284.20

0.42

0.18

9,960

320.23

27.89

11.40

0.34


with

288.37

289.06

0.69

0.29

19,141

615.39

29.26

2.26

1.23


with

289.06

289.49

0.43

0.18

33,271

1069.70

33.53

0.04

1.94












K-16-0612


359.32

360.70

1.38

1.17

321

10.32

0.07

0.99

0.05



366.27

370.32

4.05

2.66

82

2.64

0.12

0.13

0.31












K-16-0613


255.10

256.37

1.27

1.25

78

2.51

0.97

0.79

0.09



269.78

272.98

3.20

2.10

1,371

44.07

7.53

0.96

0.07


including

270.20

271.51

1.31

0.86

2,812

90.41

13.47

2.06

0.14


with

270.20

270.56

0.36

0.24

8,030

258.17

32.83

7.22

0.34



276.00

277.64

1.64

1.08

47

1.52

0.04

0.05

0.07












K-16-0614


266.00

282.38

16.38

3.68

749

24.07

1.66

2.90

0.14


including

266.00

268.12

2.12

0.48

4,421

142.15

9.83

13.72

0.46


with

266.00

266.26

0.26

0.06

7,770

249.82

28.61

17.35

0.85


with

266.26

266.57

0.31

0.07

8,470

272.32

12.20

18.00

1.03


and

279.10

279.55

0.45

0.10

1,715

55.14

2.54

1.04

0.13



286.60

292.15

5.55

1.25

209

6.71

0.63

0.50

0.01



298.00

298.40

0.40

0.31

493

15.85

1.05

1.33

0.07












K-16-0615


329.00

342.65

13.65

7.43

535

17.21

0.74

0.29

0.10


including

334.70

335.00

0.30

0.16

1,785

57.39

0.04

0.28

0.23


and

340.40

342.65

2.25

1.23

2,421

77.83

3.92

1.07

0.35












K-16-0616


291.35

292.65

1.30

1.09

67

2.15

0.21

0.39

0.09



300.82

302.00

1.18

0.98

1,333

42.85

6.08

9.70

0.38


including

300.82

301.40

0.58

0.29

2,510

80.70

12.30

16.00

0.38



304.85

305.10

0.25

0.13

4,630

148.86

52.94

4.85

0.31



312.25

313.81

1.56

0.77

5,485

176.36

34.15

2.79

0.41


including

312.92

313.81

0.89

0.44

9,530

306.39

59.15

4.85

0.71


with

312.92

313.20

0.28

0.14

7,580

243.71

51.91

2.44

0.42


with

313.20

313.40

0.20

0.10

20,337

653.86

42.70

10.45

1.98



323.38

323.88

0.50

0.31

1,007

32.38

11.42

1.00

0.15












K-16-0617


284.35

285.35

1.00

0.87

1,877

60.34

4.77

17.53

0.15












K-16-0618


235.85

237.05

1.20

0.65

93

3.00

0.00

0.03

0.50



363.50

366.48

2.98

2.47

194

6.25

0.82

0.59

0.08



414.15

424.30

10.15

6.11

304

9.76

1.00

0.68

0.10


including

416.30

417.00

0.70

0.42

1,670

53.69

2.98

1.46

0.16



443.45

444.05

0.60

0.36

1,755

56.43

0.67

2.04

0.32



452.30

453.90

1.60

0.96

62

1.98

0.36

0.24

0.10












K-16-0619


254.81

256.03

1.22

1.20

104

3.36

0.79

1.02

0.08



285.25

310.80

25.55

21.90

117

3.77

0.38

0.64

0.04


including

306.72

306.90

0.18

0.15

8,580

275.86

11.20

30.13

0.83












K-16-0620


252.70

254.35

1.65

0.59

764

24.57

1.11

0.82

2.27



257.90

269.00

11.10

3.98

6,477

208.25

6.81

3.39

0.81


including

259.90

265.75

5.85

2.10

12,049

387.38

12.38

6.34

1.20


with

260.35

261.05

0.70

0.25

16,789

539.77

20.47

2.20

1.84


with

261.05

261.60

0.55

0.20

20,433

656.95

15.30

13.60

2.09


with

261.60

262.10

0.50

0.18

26,069

838.15

18.75

8.25

1.88


with

262.10

262.65

0.55

0.20

16,135

518.74

12.55

3.61

1.26


with

262.65

262.90

0.25

0.09

9,390

301.90

7.63

0.12

0.66


with

262.90

263.60

0.70

0.25

14,733

473.68

8.98

13.30

2.29


with

263.60

264.10

0.50

0.18

6,610

212.52

6.12

9.51

0.82


with

264.90

265.25

0.35

0.13

7,440

239.21

7.98

10.55

0.51


with

265.25

265.75

0.50

0.18

7,990

256.89

14.50

4.42

0.72



276.85

279.90

3.05

2.56

989

31.81

0.87

0.16

0.16


including

278.00

278.55

0.55

0.46

4,930

158.51

4.09

0.12

0.81



282.80

288.95

6.15

5.16

296

9.52

0.88

1.60

0.06


including

284.25

284.80

0.55

0.46

2,110

67.84

7.09

1.84

0.36












K-16-0621


420.15

425.35

5.20

3.61

842

27.08

3.28

3.65

0.16


including

423.25

424.40

1.15

0.80

3,667

117.91

14.26

15.52

0.45



523.94

524.27

0.33

0.18

38

1.22

0.15

0.08

0.37



554.70

555.15

0.45

0.25

149

4.79

0.05

0.01

0.09



557.55

558.55

1.00

0.54

32

1.01

0.05

0.12

0.01



561.47

562.10

0.63

0.34

430

13.83

0.01

0.06

0.30












K-16-0622


303.13

305.50

2.37

1.55

31

1.00

0.23

0.04

0.03



317.56

318.33

0.77

0.51

108

3.47

0.27

0.39

0.10



323.48

323.88

0.40

0.26

42

1.33

0.03

0.46

0.09



326.80

327.26

0.46

0.30

31

1.00

0.17

0.53

0.28



334.20

335.46

1.26

0.83

192

6.17

0.02

0.36

0.01












K-16-0623


195.78

199.01

3.23

1.05

26

0.85

0.39

1.50

0.11



203.82

204.63

0.81

0.26

206

6.62

1.56

2.49

0.11



208.64

211.50

2.86

0.93

127

4.10

1.49

2.13

0.10



249.50

257.00

7.50

2.44

37

1.19

0.09

0.45

0.02



260.78

264.85

4.07

1.33

1,306

41.99

2.42

0.69

0.11


including

261.32

261.69

0.37

0.12

13,087

420.76

22.91

6.11

1.17



299.00

306.28

7.28

6.30

110

3.54

0.45

0.87

0.01












K-16-0624


279.85

281.39

1.54

0.32

47

1.52

0.12

0.11

0.01



297.73

298.62

0.89

0.42

100

3.21

0.02

4.57

0.03



308.35

310.47

2.12

0.36

69

2.22

0.34

0.86

0.01



318.18

321.05

2.87

1.52

820

26.36

5.78

3.45

0.14


including

318.18

318.46

0.28

0.15

3,220

103.53

12.20

2.94

0.25


and

320.65

321.05

0.40

0.21

2,370

76.20

22.71

6.11

0.24












K-16-0625


372.00

372.75

0.75

0.49

34

1.10

0.64

2.45

0.04



424.10

425.00

0.90

0.66

67

2.16

0.78

0.53

0.14












K-16-0626


162.20

163.15

0.95

0.85

38

1.23

0.10

0.05

0.29



351.95

353.55

1.60

1.36

795

25.55

3.40

1.85

0.18


including

351.95

352.35

0.40

0.34

3,010

96.78

13.40

6.27

0.54



376.10

384.65

8.55

5.15

746

24.00

2.22

1.98

0.12


including

380.20

382.55

2.35

1.41

2,309

74.24

5.53

5.10

0.32



392.35

395.85

3.50

2.15

290

9.33

0.26

0.44

0.05












K-16-0628


363.26

366.29

3.03

1.47

405

13.04

0.62

0.25

0.13



370.16

375.79

5.63

2.73

117

3.77

0.21

0.87

0.18



381.96

387.32

5.36

4.17

849

27.30

0.36

0.80

0.12


including

386.87

387.32

0.45

0.35

7,240

232.77

2.67

2.02

0.89












K-16-0629


477.78

478.44

0.66

0.40

105

3.39

0.10

6.84

0.02



521.21

522.44

1.23

0.74

74

2.39

0.12

0.26

0.14



530.08

530.50

0.42

0.25

98

3.14

0.15

1.16

0.10












K-16-0631


411.25

412.15

0.90

0.63

30

0.96

0.54

0.40

0.05



416.20

418.60

2.40

1.69

151

4.85

2.25

0.07

0.01



424.00

425.00

1.00

0.42

610

19.61

0.63

0.03

0.09



428.40

429.75

1.35

0.57

368

11.82

1.12

0.04

0.07



439.90

440.65

0.75

0.32

30

0.97

0.21

0.03

0.04












K-16-0633


284.60

287.48

2.88

0.08

293

9.43

0.94

0.49

0.02



302.37

309.23

6.86

4.40

688

21.13

1.83

1.94

0.06














Assay Composites Calculated for 2016 Bermingham Drill Holes with assays completed after August 31, 2016.
















Using 30 g/t Ag cut-off with a maximum of two metres unmineralized internal dilution,






Intervals greater than 50 oz/t Ag.









Intervals greater than 200 oz/t Ag.








True width estimates based on measured vein orientation or derived from current 3D interpretation



 

SOURCE Alexco Resource Corp.



Contact
Clynton R. Nauman, President and Chief Executive Officer; Mike Clark, Chief Financial Officer, Phone: (604) 633-4888 Email: info@alexcoresource.com
Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!




Mineninfo
Alexco Resource Corp.
Bergbau
-
-
Minenprofile
Alle Angaben ohne Gewähr! Copyright © by GoldSeiten.de 1999-2024.
Die Reproduktion, Modifikation oder Verwendung der Inhalte ganz oder teilweise ohne schriftliche Genehmigung ist untersagt!

"Wir weisen Sie ausdrücklich auf unser virtuelles Hausrecht hin!"