Osprey Announces Acquisition of Unassayed 2014 Diamond Drill Core from Goldenville Gold Project and Commences Logging and Sampling
Company President Cooper Quinn stated, "We are excited for the Company to have acquired this drill core. It represents an opportunity for us to gain rapid, firsthand insight to Goldenville. Access to this historic un-assayed core represents a cost-effective and efficient mechanism to increase our geological data set and improve our understanding of the project's mineralization. This acquisition is a great head-start for us to build on our resource estimate announced on March 16th, and will help guide our 2017 exploration program."
The Company will commence geologic logging and sampling of the core in due course, and assay results will be released as they become available.
About Goldenville and Osprey
The Goldenville Property consists of three contiguous mineral titles totaling approximately 970 ha in Northeastern Nova Scotia. In a news release dated March 2nd, 2017, Osprey announced the closing of an option to acquire a 100% interest in Goldenville (the "Goldenville Transaction"). The Property is under option to Crosby Gold Ltd. which retains the right to earn a 100% interest in the claims subject to certain royalties.
The Goldenville Gold District, where the Goldenville Property is located, is regarded as one of the most important gold mining districts in Nova Scotia with past gold production between 1862 and 1942 of approximately 212,300 ounces from 551,797 tonnes indicating an historic recovered grade of 11.97 g/t.
As disclosed in the Company's March 16 News Release, Goldenville has an Inferred Resource of 2,800,000 tonnes at 3.20 grams per tonne ("g/t") gold for 288,000 ounces of gold (2,800,000 tonnes at 4.96 g/t gold for 447,000 ounces of gold uncapped). The resource estimate was completed by David G. Thomas, M.Sc., P. Geo. and Neil Pettigrew, M.Sc., P. Geo. of Fladgate Exploration Consulting Corporation ("Fladgate") based in Thunder Bay, Ontario. A technical report, which will include this resource estimate, will be posted on the Company's website at www.ospreygold.com and filed on SEDAR at www.sedar.com within 45 days.
Footnotes to mineral resource statement:
-
Mineral resources are not mineral reserves and do not have demonstrated economic viability. No mineral reserves have as yet been defined. Inferred mineral resources are considered too speculative geologically to have the economic considerations applied to them that would enable them to be considered for estimation of mineral reserves, and there is no certainty that the inferred mineral resources will be realized.
-
Fladgate undertook data verification, and reviewed historical quality assurance and quality control programs on the mineral resources data. Fladgate concluded that the collar, survey, assay, and lithology data were adequate to support mineral resources estimation.
-
A dry bulk density value of 2.67 g/cm3 for all material was assigned from similar Meguma-type gold mineralization with similar rock types in Nova Scotia.
-
Fladgate assumed a metallurgical recovery of 90% based on a qualitative assessment of the gold mineralogy and grain size.
-
Near surface mineral resources are constrained within an open pit shell optimized with an L-G algorithm. A process and G&A cost of $25 and a mining cost of $3.00/tonne have been used.
-
Underground resources have been constrained within a grade shell using a 2.0 g/t threshold, assuming a mining cost of $50/tonne in addition to the operating costs. Isolated blocks were removed from the grade shell. The mineral resources have been depleted using solids representing underground development and areas of stoping for post 1920's historical mining for which technical drawings are available, however no records are available for the abundant, pre 1920's mining development, which is known to have occurred throughout the property.
-
Blocks were classified as inferred in accordance with CIM Definition Standards.
-
The contained metal figures shown are in situ. The resource estimation methodology incorporates a significant amount of external and internal dilution due to the use of 2 meter composites, probabilistic domaining and the grade smoothing introduced by ordinary kriging with a variogram which has a short range of influence.
-
No assurance can be given that the estimated quantities will be produced. All figures have been rounded to reflect accuracy and to comply with securities regulatory requirements. Summations within the tables may not agree due to rounding.
The technical information in this release has been reviewed and approved by Brandon Macdonald, P.Geo, a 'Qualified Person' under NI 43-101. Additional information regarding the Goldenville property, Osprey is available under the Company's profile at www.sedar.com and at www.ospreygold.com.
For further information please contact:
ON BEHALF OF Osprey Gold Development Ltd.,
"Cooper Quinn"
Cooper Quinn, President and Director
For further information please contact Gonzaga at (236)521-0944 or cooper@ospreygold.com
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
All statements in this press release, other than statements of historical fact, are "forward-looking information" with respect to Osprey within the meaning of applicable securities laws including, without limitation economic estimates and statements related to estimated mining costs. Osprey provides forward-looking statements for the purpose of conveying information about current expectations and plans relating to the future and readers are cautioned that such statements may not be appropriate for other purposes. By its nature, this information is subject to inherent risks and uncertainties that may be general or specific and which give rise to the possibility that expectations, forecasts, predictions, projections or conclusions will not prove to be accurate, that assumptions may not be correct and that objectives, strategic goals and priorities will not be achieved. These risks and uncertainties include but are not limited to exploration findings, results and recommendations in connection with the updated technical report on the Goldenville property, as well as those risks and uncertainties identified and reported in Osprey's public filings under Osprey's SEDAR profile at www.sedar.com. Although Osprey has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking information, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate as actual results and future events could differ materially from those anticipated in such statements. Osprey disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise unless required by law.