Suche
 
Folgen Sie uns auf:

Nortec Minerals updates Phase 1 drilling, TOM-1 Target, Tomboko Gold Property, Northeast Guinea

04.12.2017  |  The Newswire
Vancouver, December 4, 2017 - Nortec Minerals Corp.. (TSX-V: NVT; OTC-PK: NMNZF) (the "Company" or "Nortec") announces that Energold Drilling (EMEA) Limited, has completed seven diamond core holes on the TOM-1 Target, Tomboko Project, Northeastern Guinea, West Africa (Figure 1). Five holes, TBDD003, 004, 005, 006 and 007 were drilled on Priority 1 Target and two drill holes TBDD0001 and 002 were drilled on Priority 3 Target (Figures 2 and 3). The holes were designed to intersect the source of the significant northwest trending soil and termite anomalies. All drill holes intersected zones of intense silicification, alteration and brecciation with pyrite. All the samples have been sent for analyses and results will be released upon receipt.

The core drilling program has been halted pending receipt of the assays from these seven drill holes. This will both conserve funds and allow time to interpret the geology and plan the next drilling phase. The next phase is expected to commence in January 2018, and as the rainy season is over (July - October) will consist of less expensive Rotary Air Blast (RAB) and Reverse Circulation Drilling (RC). Focus will be on the rest of the termite mound anomalies on the Tom 1 target, geochemical soil and termite mound anomalies, as well as artisanal workings on the Tom 2 and Tom 3 targets. This is intended to further assist in defining target areas for delineating the mineralized zones.

Mohan Vulimiri, CEO and Chairman comments, "We are very pleased to have started the drill program on the Tomboko project after many delays due to the rainy season. We are looking forward to continuing exploration program with RAB and RC drilling on the identified geochemical anomalies and artisanal working areas on the Tom 1, Tom 2 and Tom 3 Targets"

Details with respect to the geology and historical geochemical results are contained in press releases on the Company's website. Further to the Company press release dated November 7, 2017, the Nortec is amending and updating the NI-43-101 Technical Report on review and comments by TSX Venture Exchange. The Report was filed on SEDAR on November 8, 2017.

About Nortec Minerals Corp.

Nortec is a mineral exploration and development company based in Vancouver, British Columbia. The Company has a 49% interest in the Tammela Lithium and Gold Project in South-West Finland. Sunstone Metals (formerly Avalon Minerals), a public Australian mining company has earned the 51% interest and is carrying out the 29% Stage 2 earn-in interest on the Tammela Project. Sunstone has completed more than 3,000 meters diamond drilling on the Kietyonmaki Lithium prospect and the Satulinmaki and Riukka gold prospects that comprise the Tammela Project. Drilling on the Kietyonmaki returned values of 42.1m at 1.05% Li2O from 17.9m downhole, including 24.2m at 1.44% Li2O from 17.9m and 9m at 2.00% Li2O from 29m downhole. Detailed information on the Company's projects have been posted on the Company's website www.nortecminerals.com.

On behalf of the Board of Directors,

"Mohan R. Vulimiri"

Mohan R. Vulimiri, CEO and Chairman

The TSX Venture Exchange has not reviewed and does not accept the responsibility for the adequacy or accuracy of this news release.

This press release contains certain forward looking statements which involve known and unknown risks, delays and uncertainties not under the Company's control which may cause actual results, performances or achievements of the Company to be materially different from the results, performances or expectations implied by these forward looking statements. This news release does not constitute an offer to sell or a solicitation of an offer to buy any of the securities in the United States.


Click Image To View Full Size

Figure 1: Location Map. Guinea, West Africa


Click Image To View Full Size

Figure 2: Outcrop Grab Sampling Results - Tom 1 North Target and Termite and Soil Geochemical Anomalies, Tom 1 North, Tom 1 South and Tom 3 targets - Tomboko Permit. Note that grab samples may not necessarily be representative of the rock unit or the mineralization style being sampled.


Click Image To View Full Size

Figure 3: Completed core drill holes, TBDD0001, 0002, 0003, 0004, 0005, 0006 and 0007 (all holes were drilled at -50? dip and an azimuth of 50?) - Tom 1 North Target, Tomboko Permit.

Copyright (c) 2017 TheNewswire - All rights reserved.

Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!




Mineninfo
Nortec Minerals Corp.
Bergbau
A3D350
CA65655Q3017
Minenprofile
Alle Angaben ohne Gewähr! Copyright © by GoldSeiten.de 1999-2024.
Die Reproduktion, Modifikation oder Verwendung der Inhalte ganz oder teilweise ohne schriftliche Genehmigung ist untersagt!

"Wir weisen Sie ausdrücklich auf unser virtuelles Hausrecht hin!"