Suche
 
Folgen Sie uns auf:

US Cobalt Expanded Diamond Drill Sampling Increases Widths of Iron Creek Cobalt Mineralized Envelop

07.02.2018  |  GlobeNewswire

Highlights:
Hole IC17-06 - Now 9.9 meters of 0.51% CoEq was 5.5 meters grading 0.55% CoEq
Hole IC17-10 - Now 6.2 meters of 0.51% CoEq was 2.2 meters of 0.66% CoEq
CoEq = Cobalt Equivalent; calculated as Copper % /10.58 + Cobalt %

VANCOUVER, British Columbia, Feb. 07, 2018 (GLOBE NEWSWIRE) -- US Cobalt Inc. (the "Company") (TSXV:USCO) (Frankfurt:26X) (OTCQB:USCFF) announces the successful completion of a program of infill sampling from the early 2017 diamond drill campaign at the Iron Creek project (the "Property") in Idaho, USA. As the 2017 diamond drill program progressed, the understanding of the Cobalt mineralization evolved to indicate significant cobalt mineralization occurs in zones with sulfide mineralization that is not massive or semi-massive. The results of the expanded sampling of the earlier holes show that significant cobalt mineralization occurs related to areas with a lower sulfide content in disseminations or stringers or seams. These values coupled with the previously released analytical results indicate an increased width of the cobalt mineralized envelop. The previous work had focused on the massive to semi-massive sulfide mineralization hosting the Cobalt and Copper values.

Two of the nine holes subjected to expanded sampling showed significant improvements in cobalt content, four of these holes showed significant new low grade mineralization, and three of these holes showed little change from the results previously announced (see Company news release dated October 4, 2017).

An indication of the increased mineralized envelop of cobalt values is presented below:


HOLE # RESULTS WITH
ADDITIONAL SAMPLING

PREVIOUSLY
REPORTED RESULTS
OCT.14/17
IC17-06 32.4 feet (9.9 meters) of 0.51% CoEq
within
105.6 feet (32.2 meters) of 0.31% CoEq,
18 feet (5.5 meters) grading 0.55% CoEq
within
44.5 feet (13.6 meters) 0.39% CoEq

IC17-10 20.2 feet (6.2 meters) 0.51% CoEq
within
118.4 feet (36.1 meters) 0.29% CoEq,
7.1 feet (2.2 meters) 0.66% CoEq
within
56 feet (17.1 meters) 0.39% CoEq

-Widths are true width. - CoEq = Cobalt Equivalent; calculated as copper % /10.58 + Cobalt %

These results confirm that cobalt mineralization exists outside of the massive and semi-massive sulfide zones at Iron Creek. Sampling protocols have been updated to reflect the understanding of cobalt and copper values in lower sulfide environments.

Sr. Vice President, Exploration, Brian Kirwin commented: "These results from additional core sampling in these nine holes are encouraging for potential of the Iron Creek project. We have learned that cobalt and copper mineralization occurs in zones with lower sulfide contents than previously thought and we now routinely sample broader zones containing lower sulfide contents. The results of the additional sampling has increased confidence in the increased widths of the mineralized envelop. We are excited to commence drilling from underground in mid-February, this will continue to evaluate the expansion of the Cobalt mineralization."

Additional significant results from the expanded sampling, as compared to the previous intercepts, is presented in the table below:


Hole ID From
feet
To feet Drilled
Length
feet
True
With
feet
True
With
meters
Cobalt % Copper% CoEQ %
IC17-06
Initial
Results
Oct 4
2017
Interval 295.0 400 105 44.5 13.6 0.38 0.06 0.39
Including 305.0 350 45 18.0 5.5 0.54 0.07 0.55
Which Includes 329.5 345 15.5 6.5 2.0 0.81 0.06 0.82
And Including 360.0 370.1 10.1 4.8 1.5 0.79 0.03 0.79
Interval 450.0 500 50 27.0 8.2 0.28 0.00 0.28
Including 477.0 500 23 12.5 3.8 0.48 0.00 0.48


IC17-06
Feb 6,
2018
Extended
Sampling
Interval 295 505 210 105.6 32.2 0.31 0.03 0.31
Including 305 370.1 65.1 32.4 9.9 0.51 0.06 0.51
which Includes 310 345 35 17.4 5.3 0.59 0.06 0.6
(including) 329.5 345 15.5 7.7 2.3 0.81 0.06 0.82
which also includes 360 370.1 10.1 5.0 1.5 0.79 0.03 0.79
And Including 477 505 28 14.3 4.4 0.51 0 0.51
which Includes 494.6 505 10.4 5.4 1.6 0.9 0 0.9
Interval 645 655 10 5.8 1.8 0.17 0 0.17


and

IC17-10
Initial
Results
Oct 4
Interval 100.0 195 95 56.0 17.1 0.31 0.91 0.39
Including 128.0 140 12 7.1 2.2 0.61 0.55 0.66
And Including 160.0 180 20 11.8 3.6 0.41 1.05 0.51
Interval 230.0 275 45 26.5 8.1 0.19 1.37 0.32

IC17-10
Feb 6,
2018
Extended
Sampling
Interval 85 310 225 118.4 36.1 0.21 0.9 0.29
Including 128 170 42 20.2 6.2 0.44 0.8 0.51
Which Includes 128 140 12 6.3 1.9 0.61 0.55 0.66
And Including 230 240 10 5.8 1.8 0.3 1.58 0.45
And Including 255 275 20 11.5 3.5 0.21 1.81 0.38
Interval 638.3 644.6 6.3 4.0 1.2 0.18 0 0.18


and

IC17-11
Initial
Results
Oct 4
Interval 962.5 967.5 5 0.15 0.01 0.15
3.9 1.2


IC17-11
Feb 6,
2018
Extended
Sampling
Interval 185 320 135 66.6 20.3 0.1 0.08 0.1
Including 245 255 10 4.9 1.5 0.21 0.15 0.22
Interval 660 710 50 24.7 7.5 0.14 0 0.14
Interval 905 927.4 22.4 10.9 3.3 0.1 0 0.1
Interval 962.5 967.5 5 2.4 0.7 0.15 0.01 0.15


and

IC17-13
Initial
Results
Interval 180.0 191 11 4.5 1.4 0.14 0.21 0.16
Interval 245.0 256.5 11.5 5.5 1.7 0.14 0.01 0.14
Interval 350.0 355 5 2.6 0.8 0.23 0.44 0.27


IC17-13
Feb 6,
2018
Extended
Sampling
Interval 160 285 125 69.6 21.2 0.1 0.05 0.11
Including 180 191 11 6.0 1.8 0.14 0.21 0.16
And Including 225 230 5 2.8 0.9 0.23 0.09 0.24
And Including 245 256.5 11.5 6.4 2.0 0.14 0.01 0.14
And Including 270 285 15 8.4 2.6 0.16 0.03 0.16
Interval 330 365 35 18.7 5.7 0.08 0.51 0.13
Including 345 355 10 5.2 1.6 0.14 0.62 0.2


and

IC17-18
Initial
Results
Interval 245.0 265 20 18.5 5.6 0.06 1.97 0.24
Interval 445.0 460 15 14.1 4.3 0.04 0.84 0.11
Interval 486.2 491.2 5 4.7 1.4 0.64 0.02 0.64

IC17-18
Feb 6,
2018
Extended
Sampling
Interval 245 265 20 18.5 5.6 0.06 1.97 0.24
Including 250 260 10 9.3 2.8 0.09 3.35 0.4
Interval 318.7 330 11.3 10.5 3.2 0.13 0.42 0.16
Including 323.5 330 6.5 6.0 1.8 0.19 0.49 0.24
Interval 486.2 503.5 17.3 16.0 4.9 0.23 0.01 0.23
Including 486.2 491.2 5 4.6 1.4 0.64 0.02 0.64
Interval 695 700 5 4.6 1.4 0.213 0.014 0.214


and

IC17-07
Initial
Results
Oct 4
2017
Interval 170.0 180 10 5.3 1.6 0.41 0.18 0.43
Interval 200.0 210 10 7.5 2.3 0.18 0.33 0.21
Interval 265.0 275 10 6.5 2.0 0.17 0.29 0.19
Interval 300.0 310 10 6.6 2.0 0.29 0.13 0.30
Interval 370.0 390 20 13.5 4.1 0.13 0.01 0.13
Interval 675.0 685 10 7.2 2.2 0.19 0.00 0.19


IC17-07
Feb 6,
2018
Extended
Sampling
Interval 170 210 40 23.3 7.1 0.18 0.17 0.2
Including 170 180 10 5.7 1.7 0.41 0.18 0.43
Interval 255 390 135 81.0 24.7 0.09 0.15 0.1
Including 255 275 20 11.5 3.5 0.15 0.3 0.18
And Including 300 310 10 5.9 1.8 0.29 0.13 0.3
Interval 585 600 15 10.5 3.2 0.16 0 0.16
Interval 675 685 10 6.8 2.1 0.19 0 0.19
Interval 740 770 30 21.4 6.5 0.15 0.01 0.15


and

IC17-04
Initial
Results
Oct 4
2017
Interval 265.0 441.9 176.9 65.8 20.1 0.21 0.11 0.22
Including 265.0 290 25 8.0 2.4 0.28 0.06 0.29
And Including 315.0 325 10 2.8 0.9 0.40 0.32 0.43
And Including 355.0 395 40 19.0 5.8 0.31 0.23 0.33
Which Includes 360.0 370 10 4.8 1.5 0.50 0.02 0.50


IC17-04
Feb 6,
2018
Extended
Sampling
Interval 265 441.9 176.9 65.8 20.1 0.21 0.11 0.22
Including 315 325 10 3.7 1.1 0.4 0.32 0.43
And Including 355 400 45 16.6 5.1 0.3 0.21 0.32
which Includes 360 375 15 5.5 1.7 0.42 0.27 0.45
Interval 1025 1045 20 10.2 3.1 0.16 0 0.16


and

IC17-08
Initial
Results
Oct 4
Interval 330.0 397.5 67.5 33.9 10.3 0.49 0.06 0.50
Including 365.0 393.8 28.8 12.0 3.7 0.73 0.02 0.73
Which Includes 384.0 393.8 9.8 4.5 1.4 1.08 0.02 1.09
Interval 430.0 440 10 5.8 1.8 0.17 0.01 0.17


IC17-08
Feb 6,
2018
Extended
Sampling
Interval 325 397.5 72.5 33.6 10.2 0.46 0.06 0.47
Including 365 393.8 28.8 13.6 4.1 0.73 0.02 0.73
Which Includes 384 393.8 9.8 4.6 1.4 1.08 0.02 1.09
Interval 430 440 10 4.9 1.5 0.17 0.01 0.17
Interval 520 535 15 7.5 2.3 0.29 0 0.29


and

IC17-09
Initial
Results
Oct 4
Interval 210.0 240 30 3.0 0.9 0.18 0.05 0.18
Interval 255.0 265 10 1.8 0.5 0.23 0.04 0.23
Interval 395.0 425 30 6.8 2.1 0.19 0.02 0.20
Including 410.0 420 10 2.0 0.6 0.30 0.02 0.30


IC17-09
Feb 6,
2018
Extended
Interval 210 275 65 21.5 6.6 0.15 0.05 0.15
Interval 295 480 185 62.3 19.0 0.1 0.03 0.11
Including 295 310 15 5.0 1.5 0.23 0.02 0.24
And Including 410 420 10 3.5 1.1 0.3 0.02 0.3


As previously announced, the Project is leased from Chester Mining Company subject to the Company's buy-out rights.

As previously announced, historic tonnage and grade estimates indicate that the Property contains 1,279,000 tons grading 0.59% cobalt – please refer to the Company's news release dated September 7, 2016. Due to the age of the previous geological work completed to establish historic tonnage, the Company is treating these tonnage and grade estimates as historical estimates. The historical estimates do not use categories that conform to current CIM Definition Standards on Mineral Resources and Mineral Reserves as outlined in National Instrument 43-101, Standards of Disclosure for Mineral Projects ("NI 43-101") and have not been redefined to conform to current CIM Definition Standards. They were prepared in the 1980s prior to the adoption and implementation of NI 43-101. The historical estimates are contained within a report entitled "Iron Creek Prospect, Lemhi County, Idaho (#0483) Progress Report" by Terry A Webster and Thomas K Stump for Noranda Exploration, Inc., July 1980, which report does not detail cut-off grades and metal prices used to estimate the historical mineralization and used a tonnage factor of 11 cubic feet per ton. A qualified person has not done sufficient work to classify the historical estimates as current mineral resources and the Company is not treating the historical estimates as current mineral resources. More work, including, but not limited to, drilling, will be required to confirm the estimates to current CIM Definition Standards. Investors are cautioned that the historical estimates do not mean or imply that economic deposits exist on the Property. Other than as provided for in this press release, the Company has not undertaken any independent investigation of the historical estimates or other information contained in this press release nor has it independently analyzed the results of the previous exploration work in order to verify the accuracy of the information. The Company believes that the historical estimates and other information contained in this press release are relevant to continuing exploration on the Property because they identify significant mineralization that will be the target of the Company's exploration program.

The drill samples and underground channel samples are collected by Company personnel or contractors working for the Company at the drill or portal. All of the Company's facilities are kept secure. The core is transported to the Company's core processing facility in Challis operated by Earl Waite and Sons Mining Contractors who are contracted by the Company. There the core is logged, cut and sampled and subsequently delivered to the laboratory. All facilities are secure.

All core is logged for recovery and other geotechnical features, prior to being sawed lengthwise in half by the Company's contractors. Individual core samples are selected on a geological basis to characterize mineralization. The core is geologically logged and half core is stored on site as reference samples in a secure facility. The samples are bagged, labeled and tied at the core processing facility by the Company's contractors. Geologic information is recorded on standardized sample description forms which included color, rock type, alteration, mineral species and abundance. Samples are stored in a secure facility at the core processing site until delivered to the laboratory. Blanks, duplicates and standards are inserted at the core processing site as part of the QA/QC program. The drill samples were loaded directly from the core processing facility to the truck of a shipping company and driven directly to the laboratory where the lab took custody directly from a Company employee. The sampling was overseen by Brian Kirwin, Senior Vice President Exploration for the Company.

American Assay Laboratories (AAL) in Sparks, Nevada conducted the analyses of the drill core samples, and analyzed the Company's QA/QC samples at the same time, and the Company plans to utilize the services of AAL for the core samples. AAL is ISO / IEC 17025 certified and has successfully completed Canadian proficiency testing (CCRMP). Approximately 20% of the samples analyzed are control samples consisting of checks, blanks, and duplicates inserted by the Company - this is in addition to the control samples inserted by the lab. Correlation of the standards with expected values were excellent. At the AAL laboratory, the drill core samples were dried, weighed and crushed to 85 % passing -6 mesh, roll crushed to 85% passing -10 mesh, split 250 gram pulps, then pulverized in a closed bowl ring pulverizer to 95 % passing -150 mesh, then analyzed by a 5 acid digestion for ICP analysis.

Mr. Garry Clark, P. Geo., of Clark Exploration Consulting, is the "qualified person" as defined in NI 43-101, who has reviewed and approved the technical content in this press release.

For additional information please contact:

US Cobalt Inc.
Wayne Tisdale, President
T: (604) 639-4457

E: info@uscobaltinc.com
Website: www.uscobaltinc.com.

Reader Advisory
This news release contains certain "forward-looking information" within the meaning of applicable securities law. Forward-looking information is frequently characterized by words such as "plan", "expect", "project", "intend", "believe", "anticipate", "estimate" and other similar words, or statements that certain events or conditions "may" or "will" occur. In particular, forward-looking information in this press release includes, but is not limited to, statements with respect to the proposed exploration program on the Property. Although we believe that the expectations reflected in the forward-looking information are reasonable, there can be no assurance that such expectations will prove to be correct. We cannot guarantee future results, performance or achievements. Consequently, there is no representation that the actual results achieved will be the same, in whole or in part, as those set out in the forward-looking information.

Forward-looking information is based on the opinions and estimates of management at the date the statements are made, and are subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those anticipated in the forward-looking information. Some of the risks and other factors that could cause the results to differ materially from those expressed in the forward-looking information include, but are not limited to: general economic conditions in Canada and globally; industry conditions, including governmental regulation and environmental regulation; failure to obtain industry partner and other third party consents and approvals, if and when required; the availability of capital on acceptable terms; the need to obtain required approvals from regulatory authorities; stock market volatility; liabilities inherent in mining operations; competition for, among other things, skilled personnel and supplies; incorrect assessments of the value of acquisitions; geological, technical, processing and transportation problems; changes in tax laws and incentive programs; failure to realize the anticipated benefits of acquisitions and dispositions; and the other factors. Readers are cautioned that this list of risk factors should not be construed as exhaustive.

The forward-looking information contained in this news release is expressly qualified by this cautionary statement. We undertake no duty to update any of the forward-looking information to conform such information to actual results or to changes in our expectations except as otherwise required by applicable securities legislation. Readers are cautioned not to place undue reliance on forward-looking information.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!




Mineninfo
US Cobalt Inc.
Bergbau
-
-
Minenprofile
Alle Angaben ohne Gewähr! Copyright © by GoldSeiten.de 1999-2024.
Die Reproduktion, Modifikation oder Verwendung der Inhalte ganz oder teilweise ohne schriftliche Genehmigung ist untersagt!

"Wir weisen Sie ausdrücklich auf unser virtuelles Hausrecht hin!"