Suche
 
Folgen Sie uns auf:

Piedmont Announces Initial Mineral Resource Estimate at Central Property

24.04.2019  |  Business Wire

Piedmont Lithium Ltd. (“Piedmont” or “Company”) is pleased to announce an initial Mineral Resource estimate on its Central property of 2.8 Mt at 1.34% Li2O. Approximately 50% or 1.41 million tonnes of the Mineral Resource is classified in the Indicated Resource category. The Mineral Resource estimate has been prepared by independent consultants, CSA Global Pty Ltd (“CSA”) and is reported in accordance with JORC Code (2012 Edition).

This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20190423006022/en/

Figure 1. Resource Location Map (Graphic: Business Wire)

The reported Central Mineral Resource estimate (“MRE”) above is based on 18 diamond core holes totaling 2,840 meters. Significant intercepts from all 18 holes are reported in Appendix 1. The deposit is open in all directions. The Central Property is located approximately 1 mile south of the Core Property (Figure 1). The Company’s project-wide Mineral Resources now total 19.0 Mt at 1.15% Li2O.

Piedmont Lithium Project Mineral Resource Estimate Summary (0.4% cut-off)
Resource Category Core Property Central Property Total
Tonnes (Mt) Grade (Li2O%) Tonnes (Mt) Grade (Li2O%) Tonnes (Mt) Grade (Li2O%)
Indicated 8.50 1.15 1.41 1.38 9.91 1.18
Inferred 7.70 1.09 1.39 1.29 9.09 1.12
Total 16.20 1.12 2.80 1.34 19.00 1.15

Phase 4 drilling is ongoing and the Company expects to announce a further Mineral Resource update in June 2019. The Central MRE and overall Resource update will be included in the Project’s updated scoping study scheduled for July 2019.

Keith D. Phillips, President and Chief Executive Officer, commented: “We are very pleased with the initial high-grade Mineral Resource Estimate at Central. This is a property with great potential and the MRE is based on only 18 drill holes, 16 of which encountered thick, high-grade mineralization. We hope to expand our land holdings in this area and ultimately drill out a substantially larger resource at Central. Phase 4 drilling continues with 3 rigs operating on the Core property and we expect a material resource upgrade in June. The Piedmont project is quickly becoming one of the largest hard-rock lithium projects in North America, while enjoying all the benefits of our unique North Carolina, USA location.”

Click here to view the full ASX Announcement



Contact

Keith D. Phillips
President & CEO
T: +1 973 809 0505
E: kphillips@piedmontlithium.com

Anastasios (Taso) Arima
Executive Director
T: +1 347 899 1522
E: tarima@piedmontlithium.com


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!




Mineninfo
Piedmont Lithium Inc. (ADR)
Bergbau
A3CPH1
US72016P1057

weitere Unternehmen:

Minenprofile
Alle Angaben ohne Gewähr! Copyright © by GoldSeiten.de 1999-2024.
Die Reproduktion, Modifikation oder Verwendung der Inhalte ganz oder teilweise ohne schriftliche Genehmigung ist untersagt!

"Wir weisen Sie ausdrücklich auf unser virtuelles Hausrecht hin!"