Suche
 
Folgen Sie uns auf:

Melkior Resources Inc. Contracts Consulting Firm for Maseres

01.05.2019  |  The Newswire
Timmins, May 1, 2019 - Melkior Resources Inc. ("Melkior") (TSXV:MKR) is pleased to announce that in follow-up to the positive maiden drill program at Maseres it is ready to commence on the summer exploration program. Melkior has awarded the summer program to Geologica Groupe-Conseil Inc who has over 30 years of experience in the Urban-Barry Camp. Please refer to the link below for Geologica's experience:
http://www.geologica.qc.ca/projects/?lang=en

The summer program will be conducted in three phases and will kick off on May 29th with a site visit:

Phase 1: Geoscientific Compilation:

Geological Base Map of the property (public information from the Ministry of Quebec)

Revision of the geophysical surveys (Mag, VTEM and IP)

Integration of all database from Melkior (surface mapping, sampling, Mag, VTEM, IP and recent Drilling)

Identify and locate areas of interest for future work efforts

Phase 2: Review of drill core and selection of drill holes for check sampling and resampling:

Mineralized quartz veinlets and veins

Intrusive and pegmatite dykes with sulphides (pyrite and/or pyrrhotite and/or chalcopyrite)

All sections with disseminated sulphides (pyrite and/or pyrrhotite and/or chalcopyrite)

Sheared and fractured altered zones hosting quartz-tourmaline and sulphides

Phase 3: Prospection and outcrop stripping with detailed mapping and sampling:

Prospection of selected priority areas previously defined in Phase 1

Mechanical Stripping on sub-cropping selected areas following the prospection

Detailed mapping with channel sampling of the mineralization of the stripped outcrops

Jim Deluce, CEO of Melkior remarks, "We are excited to work with Geologica Groupe-Conseil Inc on the summer program at Maseres. With their extensive experience in the Urban-Barry area, we believe they are the right group to take the Maseres project to the next level."


ON BEHALF OF THE BOARD

Keith James Deluce
CEO



For more information, please contact:

Melkior Resources Inc.
E-mail: info@melkior.com
Tel: 705-267-4000
The reader is invited to visit Melkior's web site www.melkior.com.



Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Copyright (c) 2019 TheNewswire - All rights reserved.

Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!




Mineninfo
Melkior Resources Inc.
Bergbau
A2P0Z5
CA58549W3030
Minenprofile
Alle Angaben ohne Gewähr! Copyright © by GoldSeiten.de 1999-2024.
Die Reproduktion, Modifikation oder Verwendung der Inhalte ganz oder teilweise ohne schriftliche Genehmigung ist untersagt!

"Wir weisen Sie ausdrücklich auf unser virtuelles Hausrecht hin!"