Suche
 
Folgen Sie uns auf:

Additional near-Surface High Grade Drill Results from Piedmont’s Core Property

29.05.2019  |  Business Wire

Piedmont Lithium Ltd. (“Piedmont” or “Company”) is pleased to announce Phase 4 drill results for 41 drill holes (refer to Appendix 1) completed on the Piedmont Lithium Ltd. Project (“Project”) located within the world-class Carolina Tin-Spodumene Belt (“TSB”) in North Carolina, USA. The results are from Exploration Target areas and new properties within the Project’s Core property (“Core”) (Figure 1). Significant mineralization was encountered in 40 of the 41 holes reported.

This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20190529005244/en/

Property Location Map (Graphic: Business Wire)

Phase 4 drilling continues to expand the extent and continuity of the pegmatite system on Core, thus giving confidence in a significant Mineral Resource estimate update in June. In 2018, the Company announced a Mineral Resource estimate at Core of 16.2Mt @ 1.12% Li2O which supported a 13-year project life as reported in the Company’s Scoping Study announced in September 2018. In April 2019 the Company announced an increased Mineral Resource estimate of 19.0Mt @ 1.15% Li2O inclusive of a Mineral Resource estimate at the Company’s Central property.

Keith D. Phillips, President and Chief Executive Officer, commented: “We are very pleased with these interim results from Phase 4 drilling, which continue to highlight high-grade mineralization near-surface. The shallow nature of the ore body, combined with pure spodumene mineralogy, local by-product markets and exceptional infrastructure, are important factors which should position the Piedmont Lithium Ltd. Project in the first quartile of the cost curve. We look forward to reporting a significant increase to our property-wide resource in June, and to reflecting that enlarged resource in an updated scoping study in July.”

Click here to view the full ASX Announcement.



For further information, contact:

Piedmont Lithium Ltd.
Keith D. Phillips, President & CEO
T: +1 973 809 0505
E: kphillips@piedmontlithium.com

Anastasios (Taso) Arima, Executive Director
T: +1 347 899 1522
E: tarima@piedmontlithium.com


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!




Mineninfo
Piedmont Lithium Inc. (ADR)
Bergbau
A3CPH1
US72016P1057

weitere Unternehmen:

Minenprofile
Alle Angaben ohne Gewähr! Copyright © by GoldSeiten.de 1999-2024.
Die Reproduktion, Modifikation oder Verwendung der Inhalte ganz oder teilweise ohne schriftliche Genehmigung ist untersagt!

"Wir weisen Sie ausdrücklich auf unser virtuelles Hausrecht hin!"