Suche
 
Folgen Sie uns auf:

Barrian Mining Drills One of the Highest-grade Gold Intercepts to Date

28.10.2019  |  CNW
At Bolo With 29 Metres of 3.34 g/t Gold Oxide Within a Broader Intercept of 84 Metres of 1.37 G/t Oxide From Surface

VANCOUVER, Oct. 28, 2019 - Barrian Mining Corp. ("Barrian" or the "Company") (TSX-V: BARI, OTCQB: BARRF, FSE: BM5) is pleased to report analytical results for a third drill hole from the recently completed 1,838 metre reverse circulation (RC) drilling program at its flagship Bolo Gold-Silver Project. Hole BL19-01 represents one of the highest-grade gold intercept to date at Bolo, yielding 3.34 grams per tonne (g/t) gold over 29.0 metres, including a higher-grade zone of 4.97 g/t gold over 13.7 metres1. The intercept occurs within a broader envelope of mineralization averaging 1.37 g/t gold over 84 metres starting from surface1. These intercepts expand the footprint of gold mineralization approximately 35 metres vertically below the previous drilling on section. Mineralization remains open at depth (Figure 1).

Maximilian Sali, CEO and Co-Founder comments, "We are thrilled with the impressive drill results we continue to release at Bolo, which rank very favorably among all other publicly reported Nevada gold drill intercepts this year. The results demonstrate exceptional grade and width figures for Carlin-type oxide gold deposits in Nevada. Barrian's choice to focus on Nevada was due to its exceptional gold endowment combined with the generally low processing costs of heap-leachable Carlin-type oxide gold deposits. While Bolo is still an early-stage project, achieving one of the highest-grade intercepts to date with hole BL19-01 further reinforces our belief that there is excellent potential to significantly expand the known gold zones and make new discoveries. We continue to look forward to additional results from the South Mine Fault and the Uncle Sam silver gold prospects."

Table 1: Significant 2019 Bolo Gold-Silver Project RC Drilling Results to Date

Hole ID
(dip/azimuth)

Released

Target

From
(m)

To
(m)

Interval
(m)1,2

Au(g/t)
0.2 cut-off

BL19-01

(-65/270)

Current News Release

Down-dip extension of mineralization
in previous drill hole BL-39

0

83.8

83.8

1.37

Including

One of the highest grade gold
intercepts to date at Bolo extends gold
mineralization 35 m vertically

21.3

50.3

29.0

3.34

and

35.1

47.2

13.7

4.97

BL19-02

(-65/270)

Barrian News Release
October 21, 2019

Down-dip extension of mineralization in
historical hole BL-38; extends gold
mineralization 60 m vertically

48.8

134.1

85.3

1.01

including

67.1

99.1

32.0

2.01

BL19-04

(-55/270)

Barrian News Release
October 23, 2019

Down-dip extension of mineralization in
historical hole BL-29

79.3

201.2

121.9

1.19

including

Upper gold zone extends approximately
25-40 m vertically down from BL-29
with improvement in grade versus BL-29

80.8

117.4

36.6

2.10

and

96.0

111.3

15.2

3.25

and

New Discovery deep gold zone
intersected 200 m below surface

187.5

199.6

12.2

3.32


1 The true width of mineralization in most drill holes is estimated to be approximately 60-70% of drilled width.

2 The true width of the lower gold zone in BL19-04 is unknown.

 

Hole BL19-01 (-65° dip / 270 azimuth) was drilled in the South Mine Fault Zone approximately 30 metres north of hole BL19-02 (see Barrian's news release dated October 21, 2019) and 90 metres north of hole BL19-04 (see Barrian's news release dated October 23, 2019) targeting the down-dip extension of previous intercepts drilled by Columbus Gold (later spun-out to Allegiant Gold Ltd.) from hole BL-39, comprising 1.62 g/t Au over 54.9 m, including 3.28 g/t Au over 15.2 m and 2.03 g/t Au over 7.6 m1. BL19-01 intersected Carlin-style oxide gold mineralization from surface and approximately 35 metres vertically below BL-39 within visibly altered (silicified and oxidized) jasperoids, siliceous siltstones and cherty limestones within the hanging wall Cambrian Windfall Formation. The intensity of alteration decreases after 60 metres down hole, but remains continuous to 91 metres. Weak alteration is observed locally past 90 metres into the footwall Silurian Roberts Mountain Formation dolomite.

Prior to BL19-01, the highest-grade intercept drilled at Bolo was from hole BL-38 (located 30 metres south-southwest of BL19-01), comprising 3.24 g/t gold over 30.5 metres, including 5.08 g/t gold over 12.2 metres1. The intercepts from both holes are near identical in width and grade, and both holes were drilled west (270 azimuth) at a -65° dip.

Barrian anticipates additional drill results over the coming weeks for the other seven (7) drill holes. The remaining unreported drill holes include significant mineralized intersections that will provide potential to expand the South Mine Fault Zone and Uncle Sam Zone. The drilled areas form part of a greater mineralized trend that extends for over 1.2 kilometres along strike. The 2019 Induced Polarization and Resistivity (IP/Res) ground geophysical program generated targets that correspond well with new results. The IP/Res anomalies indicate mineralized areas may extend to depth and along strike, providing additional growth potential across the Bolo Project area.

Methodology and QA/QC
The analytical work reported on herein was performed by ALS Global (ALS), Elko (sample preparation), Reno (gold fire assay) Nevada, and Vancouver (multi-element geochemistry) Canada. ALS is an ISO-IEC 17025:2017 and ISO 9001:2015 accredited geoanalytical laboratory and is independent of the Barrian and the QP. RC drill samples were subject to crushing at a minimum of 70% passing 2 mm, followed by pulverizing of a 250 gram split to 85% passing 75 microns. Gold determination was via standard atomic absorption (AA) finish 30 gram fire-assay (FA) analysis, in addition to 48 element ICP-MS geochemistry. Barrian follows industry standard procedures for the work carried out on the Bolo Gold-Silver Project, with a quality assurance/quality control (QA/QC) program. Blank, duplicate and standard samples were inserted into the sample sequence sent to the laboratory for analysis. Barrian detected no significant QA/QC issues during review of the data. Barrian is not aware of any drilling, sampling, recovery or other factors that could materially affect the accuracy or reliability of the data referred to herein.

About Barrian Mining Corp.
Barrian Mining Corp. is a new gold exploration company focused on acquiring and advancing precious metal projects in the United States. Barrian's flagship Bolo Project, located 90 km northeast of Tonopah Nevada, hosts Carlin type gold mineralization and is fully funded and permitted for its current drill program. In addition, Barrian has an earn-in option to acquire 100% of the "Sleeper Project" which is located in the historic Mogollon epithermal silver-gold mining district of New Mexico. Barrian also has the option to acquire 100% of the previously producing Troy Canyon Project located in Nevada. Barrian is run by a strong management and technical team consisting of capital market and mining professionals with the goal of maximizing value for shareholders through new mineral discoveries, committed long-term partnerships, and the advancement of exploration projects in geopolitically favourable jurisdictions. Barrian trades on the TSXV under the ticker symbol "BARI", on the OTC markets under the symbol "BARRF" and on the German (Frankfurt) exchanges using the ticker symbol "BM5".

Qualified Person
The scientific and technical information contained in this news release as it relates to Barrian's Projects have been reviewed and approved by Kristopher J. Raffle, P.Geo. (BC) Principal and Consultant of APEX Geoscience Ltd. of Edmonton, AB and a Director of Barrian, and Christopher Livingstone, P.Geo. (BC) Project Geologist of APEX Geoscience Ltd. of Edmonton, AB, both "Qualified Persons" as defined in National Instrument 43-101 – Standards of Disclosure for Mineral Projects. Mr. Raffle and Mr. Livingstone verified the data disclosed which includes a review of the analytical and test data underlying the information and opinions contained therein.

On behalf of the Board of Directors,

/s/ "Max Sali"
Max Sali, Chief Executive Officer

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

Forward Looking Information

This news release includes certain statements that constitute "forward-looking information or statements" within the meaning of applicable securities law, including without limitation, receipt of additional drill results, expectations of the drill results, other statements relating to the technical, financial and business prospects of the Company and its properties, and other matters.

Forward-looking statements address future events and conditions and are necessarily based upon a number of estimates and assumptions. These statements relate to analyses and other information that are based on forecasts of future results, estimates of amounts not yet determinable and assumptions of management. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as "expects" or "does not expect", "is expected", "anticipates" or "does not anticipate", "plans", "estimates" or "intends", or stating that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved), and variations of such words, and similar expressions are not statements of historical fact and may be forward-looking statements. Forward-looking statement are necessarily based upon a number of factors that, if untrue, could cause the actual results, performances or achievements of the Company to be materially different from future results, performances or achievements express or implied by such statements. Such statements and information are based on numerous assumptions regarding present and future business strategies and the environment in which the Company will operate in the future, including the price of metals, anticipated costs and the ability to achieve goals, that general business and economic conditions will not change in a material adverse manner, that financing will be available if and when needed and on reasonable terms, and that third party contractors, equipment and supplies and governmental and other approvals required to conduct the Company's planned exploration activities will be available on reasonable terms and in a timely manner. While such estimates and assumptions are considered reasonable by the management of the Company, they are inherently subject to significant business, economic, competitive and regulatory uncertainties and risks.

Forward-looking statements are subject to a variety of risks and uncertainties, which could cause actual events, level of activity, performance or results to differ materially from those reflected in the forward-looking statements, including, without limitation: (i) risks related to gold and other commodity price fluctuations; (ii) risks and uncertainties relating to the interpretation of exploration results; (iii) risks related to the inherent uncertainty of exploration and cost estimates and the potential for unexpected costs and expenses; (iv) that resource exploration and development is a speculative business; (v) that the Company may lose or abandon its property interests or may fail to receive necessary licences and permits;  (vi) that environmental laws and regulations may become more onerous;  (vii) that the Company may not be able to raise additional funds when necessary; (viii) the possibility that future exploration, development or mining results will not be consistent with the Company's expectations; (ix) exploration and development risks, including risks related to accidents, equipment breakdowns, labour disputes or other unanticipated difficulties with or interruptions in exploration and development; * competition; (xi) the potential for delays in exploration or development activities or the completion of geologic reports or studies; (xii) the uncertainty of profitability based upon the Company's history of losses; (xiii) risks related to environmental regulation and liability; (xiv) risks associated with failure to maintain community acceptance, agreements and permissions (generally referred to as "social licence"); (xv) risks relating to obtaining and maintaining all necessary government permits, approvals and authorizations relating to the continued exploration and development of the Company's projects; (xvi) risks related to the outcome of legal actions; (xvii) political and regulatory risks associated with mining and exploration; (xix) risks related to current global financial conditions; and (xx) other risks and uncertainties related to the Company's prospects, properties and business strategy. These risks, as well as others, could cause actual results and events to vary significantly.

Factors that could cause actual results to differ materially from those in forward looking statements include, but are not limited to, continued availability of capital and financing and general economic, market or business conditions, the loss of key directors, employees, advisors or consultants, adverse weather conditions, increase in costs, equipment failures, litigation, exchange rate fluctuations, failure of counterparties to perform their contractual obligations and fees charged by service providers. Investors are cautioned that forward-looking statements are not guarantees of future performance or events and, accordingly are cautioned not to put undue reliance on forward-looking statements due to the inherent uncertainty of such statements. The forward-looking statements included in this news release are made as of the date hereof and the Company disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except as expressly required by applicable securities legislation.

SOURCE Barrian Mining Corp.



Contact

Karl Mansour, Paradox IR, Tel: (514) 341-0408, Email: karlmansour@paradox-pr.ca; Max Sali, Chief Executive Officer & Director, Tel: (604) 620-8406, Email: info@barrianmining.com

Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!




Mineninfo
New Placer Dome Gold Corp.
Bergbau
-
-
Minenprofile
Alle Angaben ohne Gewähr! Copyright © by GoldSeiten.de 1999-2024.
Die Reproduktion, Modifikation oder Verwendung der Inhalte ganz oder teilweise ohne schriftliche Genehmigung ist untersagt!

"Wir weisen Sie ausdrücklich auf unser virtuelles Hausrecht hin!"