Suche
 
Folgen Sie uns auf:

Jaguar Announces Turmalina Mine Infill Diamond Drill Results, Resumption Of Growth Exploration Drilling

28.01.2020  |  Accesswire
  • Infill diamond drilling results confirm model grades and thickness of main orebodies
  • Orebody A: 15.22 g/t Au over 8.36m (including 20.20 g/t Au over 5.55m)
  • Orebody C: 8.02 g/t Au over 7.66m (including 19.35 g/t Au over 2.75m)

TORONTO, January 28, 2020 - Jaguar Mining Inc. ("Jaguar" or the "Company") (TSX: JAG)(OTCPINK:JAGGF) is pleased to announce results of its 2019 Infill diamond drilling campaign and the resumption of growth exploration drilling activities at its Turmalina Mine Operation ("Turmalina").

Infill drilling completed in 2019 confirms expected modelled grade and thickness of both Orebody A and Orebody C which are the source of current production. This drilling is expected to support replacement of Mineral Reserves net of 2019 production depletion.

Definitions: ETW - estimated true width, g/t Au - grams per tonne gold, m - metres, grade (g/t Au) x thickness (m) = GM (gram - metres)

At Turmalina, 11 infill drilling intersections reported grade (g/t Au) x thickness (m) results > 25 GM (refer to Table 1, Figure 1 and Appendix 1, 2) with the best results from Orebody A, including 15.22 g/t Au over 8.36m (including 20.20 g/t Au over 5.55m) and Orebody C including 8.02 g/t Au over 7.66m (including 19.35 g/t Au over 2.75m).

Contractors, Major Drilling, have mobilized an underground diamond rig dedicated to growth exploration at Turmalina through 2020. This drilling will initially focus on evaluating the important C-SE Block between level 6 and level 8 and below current level 8 access development as well as test priority targets on Orebody A, Orebody B and C-Central / NW (Figure 1). The location of planned and targeted 2020 infill and growth exploration drilling is presented in Figure 2.

Vern Baker CEO, Jaguar Mining commented: "Resumption of growth exploration drilling at Turmalina is an important milestone in Jaguar´s ongoing transformation to stabilize, grow and sustain production from its key operations in the prolific Iron Quadrangle of Brazil. The highly successful prior cycle of growth exploration Investment by Jaguar, commenced in late 2016, culminated in a material increase in the company's Mineral Resource inventory in 2017-2018 and Mineral Reserve inventory in early 2019. Infill Drilling activities at Turmalina in 2019 are expected to replace 2019 mine depletion. With a sustained four-year reserve inventory underpinning the Company's planned production at current mining rates going forward, this growth exploration cycle will focus on adding new, high-quality Mineral Resource and Mineral Reserve ounces contiguous with existing mining infrastructure, while leveraging existing excess plant capacity. In parallel, the exploration team is working to progress the next generation of priority, near-mine brownfields targets, supporting the Company's immediate and longer-term growth objectives."

Jon Hill, Expert Advisor, Geology and Exploration, Jaguar Mining Management Committee commented: "The previous investment in the growth exploration cycle (2016-2019) at Jaguar, successfully provided the company with a solid and sustainable four-year reserve inventory at low discovery and conversion costs. This new cycle of growth exploration will focus on targeting a number of clear, near-term productivity and growth opportunities, which have been either recently discovered, recognized or under-explored mineralized zones. These compelling targets have been generated through a combination of high-quality geological and structural mapping and careful review of historical data by the Geology and Exploration Team. The benefits of this approach are proven, and we expect to once again deliver material value to Jaguar via strong, researched drill programs supported by a successful and highly motivated team."

Turmalina Gold Mine Drill Results showing intercepts reporting greater than 25 gram meters.

Figure 1. Location Infill Drilling Impacts Orebody A, Orebody C-SE and C-Central On Grade X Thickness Projection.

Table 1. 2019 Infill Drilling Results Orebody A and Orebody C-Central.

Summary of Significant Intersections with greater than 25 gram metres
Jaguar Mining Inc. - Turmalina Mine

Hole ID

From (m)

To (m)

Down Hole Interval (m)

Estimated True Width (m)

Gold Grade (g/t Au)

GT (ETW)

Date (mm/dd/yyyy)

Orebody

FTS1727

103.68

118.48

14.80

12.12

2.45

29.69

5/28/2019

A

131.73

146.11

14.38

11.77

5.56

65.44

A

Including

139.16

143.30

4.14

3.38

12.69

42.91

A

FTS1728

142.68

151.58

8.90

8.36

15.22

127.24

A

Including

143.84

149.74

5.90

5.55

20.20

112.13

A

FTS1729

83.03

89.99

6.96

5.70

4.39

25.02

5/14/2019

A

FTS1731

94.85

106.08

11.23

9.52

3.35

31.89

5/10/2019

A

FTS1740

125.50

136.15

10.65

7.66

8.02

61.43

6/24/2019

C-Central

Including

130.29

134.12

3.83

2.75

19.35

53.21

C-Central

FTS1747

144.51

150.44

5.93

4.67

5.43

25.36

7/4/2019

A

FTS1748

146.79

157.82

11.03

9.03

8.62

77.84

7/5/2019

A

Including

151.50

155.23

3.73

3.00

18.64

55.92

A

FTS1754

150.72

156.51

5.79

4.56

5.49

25.03

7/1/2019

C-Central

FTS1755

92.86

96.03

3.17

2.65

16.65

44.12

7/11/2019

A

FTS1763

50.64

54.48

3.84

3.58

7.04

25.20

9/13/2019

CSE

FTS1764

55.62

58.45

2.83

2.5

29.03

72.58

CSE

Figure 2. Location of 2020 Infill and Growth Exploration Drilling in Orebody A, Orebody C-SE and C-Central.

Figure 3. Location of 2020 Infill and Growth Exploration Drilling in Orebody A, Orebody C-SE and C-Central.

Table 2. Metreage of 2020 Infill and Growth Exploration Drilling Turmalina Mine.

Qualified Person

Scientific and technical information contained in this press release has been reviewed and approved by Jonathan Victor Hill, BSc (Hons) (Economic Geology - UCT), FAUSIMM, Senior Expert Advisor Geology and Exploration to the Jaguar Mining Management Committee, who is also an employee of Jaguar Mining Inc., and is a "qualified person" as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101").

Quality Control

Jaguar continues to use a quality-control program that includes insertion of blanks and commercial standards in order to ensure best practice in sampling and analysis.

HQ, NQ, and BQ size drill core is sawn in half with a diamond saw. Samples are selected for analysis in standard intervals according to geological characteristics such as lithology and hydrothermal alteration. All diamond drill hole collars are accurately surveyed using a Total Station instrument and down-hole deviations are surveyed using a non-magnetic Reflex Gyrosmart 642.

Mean grades are calculated using a variable lower grade cut-off (generally 0.5g/t Au). No upper gold grade cut has been applied to the data. However, the requirement for assay top cutting will be assessed during future resource work.

Half of the sawed sample is forwarded to the analytical laboratory for analysis while the remaining half of the core is stored in a secure location. The drill core samples from growth exploration drill holes are transported in securely sealed bags and sent for physical preparation to the independent ALS Brazil (subsidiary of ALS Global) laboratory located in Vespasiano, Minas Gerais, Brazil. The analysis is conducted at ALS Global's respective facilities (fire assay are conducted by ALS Global in Lima, Peru, and multi-elementary analysis are conducted by ALS Global in Vancouver, Canada). ALS has accreditation in a global management system that meets all requirements of international standards ISO/IEC 17025:2005 and ISO 9001:2015. All major ALS geochemistry analytical laboratories are accredited to ISO/IEC 17025:2005 for specific analytical procedures.

The infill drilling results presented on this news release are from drill holes completed by both Major Drilling on contract and Jaguar Mining Inc.´s own drilling machines. The infill samples are transported for physical preparation and analysis in securely sealed bags to the Jaguar in-house laboratory located at the Roça Grande Mine, Caeté, Minas Gerais.

For a complete description of Jaguar's sample preparation, analytical methods and QA/QC procedures, please refer to the "Technical Report on the Roça Grande and Pilar Operations, Minas Gerais State, Brazil", a copy of which is available on the Company's SEDAR profile at www.sedar.com.

The Iron Quadrangle

The Iron Quadrangle has been an area of mineral exploration dating back to the 16th century. The discovery in 1699-1701 of gold contaminated with iron and platinum-group metals in the southeastern corner of the Iron Quadrangle gave rise to the name of the town Ouro Preto (Black Gold). The Iron Quadrangle contains world-class multi-million-ounce gold deposits such as Morro Velho, Cuiabá, and São Bento. Jaguar holds the second largest gold land position of a gold producer in the Iron Quadrangle with just over 25,000 hectares.

About Jaguar Mining Inc.

Jaguar Mining Inc. is a Canadian-listed junior gold mining, development, and exploration company operating in Brazil with three gold mining complexes and a large land package with significant upside exploration potential from mineral claims covering an area of approximately 64,000 hectares. The Company's principal operating assets are located in the Iron Quadrangle, a prolific greenstone belt in the state of Minas Gerais and include the Turmalina Gold Mine Complex and Caeté Mining Complex (Pilar and Roça Grande Mines, and Caeté Plant). The Company also owns the Paciência Gold Mine Complex, which has been on care and maintenance since 2012. The Roça Grande Mine has been on temporary care and maintenance since April 2018. Additional information is available on the Company's website at www.jaguarmining.com.

For further information, please contact:

Vern Baker
Chief Executive Officer
Jaguar Mining Inc.
vbaker@jaguarmining.com
+55 (31) 3232-7101

Hashim Ahmed
Chief Financial Officer
Jaguar Mining Inc.
hashim.ahmed@jaguarmining.com
416-847-1854

Forward-Looking Statements

Certain statements in this news release constitute "forward-looking information" within the meaning of applicable Canadian securities legislation. Forward-looking statements and information are provided for the purpose of providing information about management's expectations and plans relating to the future. All of the forward-looking information set forth in this news release is qualified by the cautionary statements below and those made in our other filings with the securities regulators in Canada. Forward-looking information contained in forward-looking statements can be identified by the use of words such as "are expected", "is forecast", "is targeted," "approximately," "plans," "anticipates," "projects," "continue," "estimate," "believe," or variations of such words and phrases or statements that certain actions, events or results "may," "could," "would," "might," or "will" be taken, occur or be achieved. All statements, other than statements of historical fact, may be considered to be or include forward-looking information. These forward-looking statements are made as of the date of this news release and the dates of technical reports, as applicable. This news release contains forward-looking information regarding potential and, among other things, expected future mineral resources, potential mineral production opportunities, geological and mineral exploration statistics, ore grades, current and expected future assay results, and definition/delineation/exploration drilling at the Pilar Gold Mine and the Turmalina Gold Mine in Brazil, as well as forward-looking information regarding costs of production, capital expenditures, costs and timing of the development of projects and new deposits, success of exploration, development and mining activities, capital requirements, project studies, mine life extensions, and continuous improvement initiatives. The Company has made numerous assumptions with respect to forward-looking information contained herein, including, among other things, assumptions about the estimated timeline and for the development of the drill program at the Pilar Gold Mine (and its expanded exploration footprint) and the Turmalina Gold Mine; its mineral properties; the supply and demand for, and the level and volatility of the price of, gold; the accuracy of reserve and resource estimates and the assumptions on which the reserve and resource estimates are based; the receipt of necessary permits; market competition; ongoing relations with employees and impacted communities; and political and legal developments in any jurisdiction in which the Company operates being consistent with its current expectations including, without limitation, the impact of any potential power rationing, tailings facility regulation, exploration and mine operating licenses and permits being obtained and renewed and/or there being adverse amendments to mining or other laws in Brazil and any changes to general business and economic conditions. Forward-looking information involves a number of known and unknown risks and uncertainties, including among others: the risk of Jaguar not meeting its plans regarding its operations and financial performance; uncertainties with respect to the price of gold, labor disruptions, mechanical failures, increase in costs, environmental compliance and change in environmental legislation and regulation, weather delays and increased costs or production delays due to natural disasters, power disruptions, procurement and delivery of parts and supplies to the operations; uncertainties inherent to capital markets in general (including the sometimes volatile valuation of securities and an uncertain ability to raise new capital) and other risks inherent to the gold exploration, development and production industry, which, if incorrect, may cause actual results to differ materially from those anticipated by the Company and described herein. In addition, there are risks and hazards associated with the business of gold exploration, development, mining and production, including without limitation environmental hazards, tailings dam failures, industrial accidents and workplace safety problems, unusual or unexpected geological formations, pressures, cave-ins, flooding, chemical spills, and gold bullion thefts and losses (and the risk of inadequate insurance, or the inability to obtain insurance, to cover these risks). Although we have attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking information.

Appendix 1

Infill Drilling Results Orebody A and Orebody C.

Summary of Significant Intersections, Drilling Program
Jaguar Mining Inc. - Turmalina Mine

Hole ID

From (m)

To (m)

DownHole Interval (m)

Estimated True Width (m)

Gold Grade (g/t Au)

GT (ETW)

Date (mm/dd/yyyy)

FTS1626

100.81

102.70

1.89

1.60

3.67

5.87

4/12/2019

112.78

115.33

2.55

1.77

3.20

5.66

147.72

153.17

5.45

3.98

2.01

8.00

FTS1639

113.43

114.56

1.13

1.11

1.02

1.13

8/22/2019

138.43

146.72

8.29

8.00

2.95

23.60

FTS1703

69.02

79.25

10.23

8.85

2.18

19.29

4/8/2019

FTS1704

148.43

151.47

3.04

2.25

7.62

17.15

4/16/2019

FTS1705

60.06

61.03

0.97

0.82

3.04

2.49

4/22/2019

FTS1722

No impact

4/1/2019

FTS1723

66.19

68.02

1.83

1.75

3.95

6.91

4/10/2019

FTS1724

60.03

61.88

1.85

1.53

1.36

2.08

5/28/2019

69.37

73.35

3.98

3.29

1.92

6.32

FTS1727

90.04

94.97

4.93

3.77

1.54

5.81

103.68

118.48

14.80

12.12

2.45

29.69

131.73

146.11

14.38

11.77

5.56

65.44

Including

139.16

143.30

4.14

3.38

12.69

42.91

FTS1728

142.68

151.58

8.90

8.36

15.22

127.24

Including

143.84

149.74

5.90

5.55

20.20

112.13

FTS1729

83.03

89.99

6.96

5.70

4.39

25.02

5/14/2019

FTS1731

94.85

106.08

11.23

9.52

3.35

31.89

5/10/2019

152.25

154.94

2.69

2.55

5.41

13.80

Including

94.85

97.57

2.72

2.30

7.24

16.65

FTS1733

52.86

53.95

1.09

0.83

3.05

2.53

6/5/2019

59.55

63.06

3.51

2.68

1.99

5.33

FTS1734

156.98

157.79

0.81

0.75

2.00

1.50

6/10/2019

FTS1735

130.80

132.01

1.21

1.10

4.83

5.31

6/26/2019

144.05

145.97

1.92

1.85

6.96

12.88

FTS1736

No impact

5/14/2019

FTS1737

104.50

109.75

5.25

2.95

3.13

9.23

6/24/2019

FTS1738

145.37

146.37

1.00

0.80

5.50

4.40

7/8/2019

169.62

173.41

3.79

2.72

4.19

11.40

FTS1740

125.50

136.15

10.65

7.66

8.02

61.43

6/24/2019

Including

130.29

134.12

3.83

2.75

19.35

53.21

FTS1741

40.53

42.56

2.03

0.71

1.48

1.05

7/22/2019

75.25

81.50

6.25

0.78

3.16

2.46

113.73

114.59

0.86

0.74

1.35

1.00

126.51

128.33

1.82

0.77

8.45

6.51

FTS1743

79.52

80.47

0.95

0.72

3.30

2.38

7/15/2019

114.00

114.98

0.98

0.78

1.12

0.87

147.64

155.03

7.39

0.71

1.82

1.29

156.73

157.69

0.96

0.84

1.28

1.08

172.79

173.97

1.18

0.66

11.26

7.43

179.49

188.04

8.55

0.66

3.30

2.18

FTS1745

109.89

111.99

2.10

2.02

2.93

5.92

5/16/2019

FTS1746

62.34

63.29

0.95

0.93

1.32

1.23

7/1/2019

101.19

103.32

2.13

2.09

1.59

3.32

FTS1747

91.24

92.31

1.07

0.85

3.30

2.81

7/4/2019

107.52

109.56

2.04

1.41

2.00

2.82

120.77

124.04

3.27

2.57

2.06

5.29

144.51

150.44

5.93

4.67

5.43

25.36

FTS1748

117.03

124.59

7.56

6.26

1.60

10.02

7/5/2019

132.12

134.40

2.28

1.82

1.90

3.46

146.79

157.82

11.03

9.03

8.62

77.84

Including

151.50

155.23

3.73

3.00

18.64

55.92

FTS1749

162.17

165.12

2.95

2.55

2.79

7.11

7/9/2019

FTS1750

71.58

72.32

0.74

0.74

1.79

1.33

7/22/2019

89.48

95.13

5.65

0.50

3.75

1.88

109.61

110.53

0.92

0.61

1.14

0.70

131.19

133.49

2.30

0.62

1.56

0.97

135.41

137.47

2.06

0.62

5.61

3.48

FTS1754

150.72

156.51

5.79

4.56

5.49

25.03

7/1/2019

FTS1755

68.69

70.77

2.08

1.59

1.32

2.10

7/11/2019

92.86

96.03

3.17

2.65

16.65

44.12

105.15

106.94

1.79

1.50

8.55

12.83

150.32

152.25

1.93

1.41

5.36

7.56

FTS1756

48.23

49.12

0.89

0.77

1.25

0.96

8/5/2019

106.55

107.65

1.10

0.90

1.00

0.90

FTS1757

119.22

120.15

0.93

0.85

1.64

1.39

9/11/2019

121.98

122.73

0.75

0.70

1.70

1.19

FTS1758

90.44

92.44

2.00

1.90

2.89

5.49

9/7/2019

FTS1760

60.89

63.56

2.67

0.17

2.18

0.37

7/29/2019

69.23

70.28

1.05

0.17

1.16

0.20

FTS1761

53.49

54.33

0.84

0.17

4.75

0.81

7/31/2019

55.30

56.49

1.19

0.17

3.09

0.52

61.51

62.50

0.99

0.17

1.19

0.20

86.41

87.36

0.95

0.30

4.66

1.40

FTS1762

50.48

55.06

4.58

4.49

2.06

9.24

7/25/2019

FTS1763

50.64

54.48

3.84

3.58

7.04

25.20

9/13/2019

FTS1764

55.62

58.45

2.83

2.50

29.03

72.58

9/13/2019

FTS1765

61.35

62.48

1.13

1.00

1.06

1.06

9/16/2019

67.42

68.49

1.07

0.95

1.61

1.53

84.29

85.27

0.98

0.90

2.12

1.91

FTS1766

53.88

57.01

3.13

2.90

6.16

17.86

FTS1770

97.27

99.19

1.92

1.85

9.72

17.98

7/3/2019

FTS1771

93.18

96.10

2.92

2.70

2.83

7.64

FTS1782

1.18

2.36

1.18

1.10

1.21

1.33

10/4/2019

79.24

80.44

1.20

1.15

1.98

2.28

FTS1777

41.00

41.84

0.84

0.75

2.37

1.78

10/14/2019

FTS1778

95.12

97.93

2.81

2.50

3.49

8.73

100.60

101.60

1.00

0.90

7.27

6.54

FTS1798

69.13

71.68

2.55

2.45

9.00

22.05

FTS1783

55.44

57.18

1.74

1.50

1.79

2.69

10/24/2019

FTS1784

59.16

63.25

4.09

3.95

2.44

9.64

FTS1768

56.56

60.65

4.09

3.90

3.99

15.56

10/28/2019

FTS1769

58.27

59.97

1.70

1.55

3.35

5.19

FTS1790

97.02

97.71

0.69

0.60

4.18

2.51

11/4/2019

FTS1791

99.35

99.94

0.59

0.55

1.24

0.68

FTS1779

91.70

92.60

0.90

0.85

3.10

2.64

11/5/2019

FTS1796

94.69

95.47

0.78

0.70

2.31

1.62

11/14/2019

FTS1785

No impact

12/16/2019

FTS1786

81.95

83.07

1.12

1.05

1.15

1.21

FTS1787

60.43

64.29

3.86

3.72

4.71

17.52

FTS1788

60.01

65.19

5.18

5.02

2.70

13.55

FTS1789

68.65

69.60

0.95

0.85

1.36

1.16

FTS1800

85.10

86.65

1.55

1.45

1.95

2.83

FTS1801

2.23

3.33

1.10

1.05

2.55

2.68

12/17/2019

FTS1802

97.96

103.47

5.51

5.41

4.28

23.15

FTS1803

65.44

67.58

2.14

2.10

1.15

2.42

12/18/2019

FTS1804

54.62

59.20

4.58

4.39

5.28

23.18

FTS1792

No impact

12/12/2019

FTS1793

37.03

37.94

0.91

0.85

2.87

2.44

74.73

75.40

0.67

0.65

2.24

1.46

FTS1794

60.67

61.49

0.82

0.75

2.11

1.58

12/28/2019

FTS1797

No impact

12/20/2019

FTS1799

139.21

141.08

1.87

1.73

4.80

8.30

12/11/2019

FTS1805

58.31

61.75

3.44

3.22

6.52

20.99

1/6/2020

FTS1806

60.70

61.45

0.75

0.70

1.04

0.73

FTS1807

0.92

3.20

2.28

2.19

4.95

10.84

84.64

85.52

0.88

0.75

1.68

1.26

FTS1808

No impact

FTS1811

118.46

119.61

1.15

1.10

1.33

1.46

122.27

123.64

1.37

1.28

3.57

4.57

FTS1813

111.58

112.54

0.96

0.90

1.20

1.08

FTS1822

205.80

207.60

1.80

1.65

13.45

22.19

1/7/2020

FTS1823

190.80

191.90

1.10

1.00

1.88

1.88

Appendix 2

Drill - Hole location data for holes reported in this Press-Release - Orebody A and Orebody C Drilling.

Hole ID

Easting (m)

Northing (m)

Elevation (m)

Total Depth (m)

Collar Azimuth (°)

Collar Dip (°)

Orebody

Drilling Company

FTS1626

513654.72

7817243.04

-153.61

185.50

7.50

-18.56

A

Jaguar

FTS1703

512781.26

7817136.33

495.14

178.49

258.78

-46.01

C

Jaguar

FTS1704

512781.18

7817136.58

495.90

170.46

268.70

-16.24

C

Jaguar

FTS1705

513054.79

7816987.20

341.11

110.07

163.58

-14.51

C

Jaguar

FTS1722

513054.86

7816987.06

341.31

112.38

179.09

2.46

C

Jaguar

FTS1723

513054.98

7816987.22

341.44

135.78

167.45

2.39

A

Jaguar

FTS1724

513055.32

7816987.64

341.26

91.27

159.04

1.71

C

Jaguar

FTS1727

513654.10

7817243.30

-153.29

162.83

342.43

-4.02

A

Jaguar

FTS1728

513654.00

7817243.27

-153.30

175.96

338.70

-4.82

A

Jaguar

FTS1729

513654.86

7817242.89

-153.40

187.02

16.25

-10.58

A

Jaguar

FTS1731

513654.88

7817242.92

-152.50

188.32

14.99

-15.85

A

Jaguar

FTS1733

513050.29

7816986.26

342.45

89.00

205.08

-15.83

C

Jaguar

FTS1734

512781.28

7817136.47

495.91

188.53

265.34

-4.27

C

Jaguar

FTS1735

512781.28

7817136.13

495.12

170.31

271.53

-28.94

C

Jaguar

FTS1736

512781.52

7817138.12

495.40

115.09

225.42

-37.93

C

Jaguar

FTS1737

512781.24

7817137.59

494.91

130.99

184.83

-39.89

C

Jaguar

FTS1738

512781.45

7817135.99

496.38

178.93

266.11

6.00

C

Jaguar

FTS1740

512781.19

7817136.32

495.44

196.89

277.88

-20.52

C

Jaguar

FTS1741

512781.56

7817135.29

496.38

151.21

240.00

6.16

C

Jaguar

FTS1743

512781.33

7817136.05

496.33

198.45

266.40

2.54

C

Jaguar

FTS1745

512781.08

7817137.49

494.84

150.30

180.67

-37.52

C

Jaguar

FTS1746

512780.67

7817138.33

494.94

122.52

201.37

-43.81

C

Jaguar

FTS1747

513654.19

7817243.21

-153.50

179.43

0.18

-17.84

A

Jaguar

FTS1748

513654.82

7817243.02

-154.11

174.93

346.60

-15.72

A

Jaguar

FTS1749

513653.93

7817243.40

-153.70

180.60

343.88

-16.86

A

Jaguar

FTS1750

513654.44

7817243.28

-153.44

167.49

1.11

-9.07

A

Jaguar

FTS1754

512781.27

7817135.86

496.10

190.00

263.41

0.16

C

Jaguar

FTS1755

513655.12

7817242.98

-153.86

179.33

25.59

-20.56

A

Jaguar

FTS1760

513126.93

7816979.73

331.12

101.23

234.25

-21.15

C

Jaguar

FTS1761

513127.31

7816979.53

331.22

100.06

217.11

-22.08

C

Jaguar

FTS1639

513492.81

7817329.91

-122.58

146.72

59.48

-27.79

A

Jaguar

FTS1750

513654.44

7817243.28

-153.44

167.49

1.11

-9.07

A

Jaguar

FTS1756

513655.31

7817242.83

-153.88

117.10

33.23

-21.14

A

Jaguar

FTS1757

513655.02

7817242.80

-153.48

181.11

24.29

-8.85

A

Jaguar

FTS1758

513655.11

7817242.92

-153.66

179.50

27.75

-14.16

A

Jaguar

FTS1762

513127.60

7816979.40

331.28

101.63

201.93

-19.24

C

Jaguar

FTS1763

513127.11

7816979.65

331.08

116.35

188.50

21.00

C

Jaguar

FTS1764

513127.56

7816979.37

331.25

131.24

174.99

-14.69

C

Jaguar

FTS1765

513126.06

7816980.84

330.75

97.95

236.64

-35.04

C

Jaguar

FTS1766

513126.31

7816980.32

330.73

98.27

218.09

-37.83

C

Jaguar

FTS1770

513482.92

7817330.09

-182.65

132.90

331.34

4.06

A

Jaguar

FTS1771

513483.03

7817330.20

-182.86

125.42

337.33

3.24

A

Jaguar

FTS1782

513130.28

7816978.06

331.56

182.66

152.60

-10.09

C

Jaguar

FTS1777

513484.45

7817329.45

-183.13

108.57

33.83

-10.51

A

Jaguar

FTS1778

513484.32

7817329.62

-183.24

120.90

27.58

-15.63

A

Jaguar

FTS1798

513482.45

7817330.29

-182.80

159.38

323.01

1.19

A

Jaguar

FTS1783

513126.97

7816979.48

331.60

80.88

188.62

-6.00

C

Jaguar

FTS1784

513126.69

7816979.53

332.11

84.61

196.54

7.27

C

Jaguar

FTS1768

513127.61

7816979.63

330.65

84.48

169.59

-45.52

C

Jaguar

FTS1769

513127.69

7816979.31

331.22

86.12

169.29

-30.21

C

Jaguar

FTS1790

513483.89

7817329.91

-183.16

126.87

8.25

-14.21

A

Jaguar

FTS1791

513483.69

7817329.98

-183.17

129.72

358.77

-14.37

A

Jaguar

FTS1779

513484.12

7817329.72

-183.23

120.72

17.39

-15.69

A

Jaguar

FTS1796

513483.42

7817329.85

-182.28

122.46

326.48

14.27

A

Jaguar

FTS1785

513128.15

7816979.13

330.98

90.00

164.62

-57.20

C

Jaguar

FTS1786

513128.40

7816979.22

330.53

100.00

147.10

-67.07

C

Jaguar

FTS1787

513127.29

7816979.32

332.39

85.00

213.29

4.53

C

Jaguar

FTS1788

513127.76

7816979.32

332.32

85.00

187.45

7.28

C

Jaguar

FTS1789

513128.10

7816979.21

332.32

95.00

167.42

6.75

C

Jaguar

FTS1800

513129.26

7816978.68

332.29

110.00

160.29

6.07

C

Jaguar

FTS1801

513129.32

7816978.62

332.08

95.00

158.98

-2.34

C

Jaguar

FTS1802

513129.74

7816978.41

332.06

115.00

146.18

-2.64

C

Jaguar

FTS1803

513127.67

7816979.20

332.01

83.00

229.70

-4.13

C

Jaguar

FTS1804

513128.16

7816979.01

332.01

75.00

210.61

-5.12

C

Jaguar

FTS1792

513483.19

7817330.11

-182.84

119.70

345.21

-16.45

A

Jaguar

FTS1793

513483.42

7817329.85

-182.28

122.46

334.48

-13.45

A

Jaguar

FTS1794

513483.56

7817329.98

-182.89

135.00

353.94

-5.76

A

Jaguar

FTS1797

513482.45

7817330.29

-182.80

159.38

331.27

-4.13

A

Jaguar

FTS1799

513485.53

7817328.81

-183.20

150.28

50.43

-17.52

A

Jaguar

FTS1805

513129.26

7816978.68

332.29

110.00

176.25

-5.11

C

Jaguar

FTS1806

513129.32

7816978.62

332.08

95.00

154.67

-28.62

C

Jaguar

FTS1807

513129.74

7816978.41

332.06

115.00

142.08

-24.07

C

Jaguar

FTS1808

513127.67

7816979.20

332.01

83.00

142.55

-41.02

A

Jaguar

FTS1811

513128.16

7816979.01

332.01

75.00

36.69

-21.73

A

Jaguar

FTS1813

513484.98

7817329.24

-183.50

126.00

21.65

-22.90

A

Jaguar

FTS1822

513301.72

7817175.83

65.53

250.00

208.98

9.40

C

Jaguar

FTS1823

513300.92

7817176.30

65.49

240.00

225.73

8.52

C

Jaguar

SOURCE: Jaguar Mining Inc.



View source version on accesswire.com:
https://www.accesswire.com/574280/Jaguar-Announces-Turmalina-Mine-Infill-Diamond-Drill-Results-Resumption-Of-Growth-Exploration-Drilling


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!




Mineninfo
Jaguar Mining Inc.
Bergbau
A2QA7P
CA47009M8896
Minenprofile
Alle Angaben ohne Gewähr! Copyright © by GoldSeiten.de 1999-2024.
Die Reproduktion, Modifikation oder Verwendung der Inhalte ganz oder teilweise ohne schriftliche Genehmigung ist untersagt!

"Wir weisen Sie ausdrücklich auf unser virtuelles Hausrecht hin!"