Suche
 
Folgen Sie uns auf:

African Gold Group Completes Phase 1 Drilling Campaign at Kobada Gold Project With Better Than Expected Results

29.01.2020  |  GlobeNewswire
Including 5.34 g/t Gold Over 6.0 m and 1.67 g/t Gold Over 21.60 m

TORONTO, Jan. 29, 2020 - African Gold Group Inc. (TSX-V: AGG) (“AGG” or the “Company”) is pleased to report the final results for the Phase 1 drilling campaign at the Kobada Gold Project. The Phase 1 drilling campaign focused on confirming and upgrading the confidence level of the resource in the feasibility study from 2016 (the “2016 Feasibility Study”) and the previously established structural mineralization model. The Company expects to issue an updated mineral resource statement in February 2020.

The results from the Phase I drilling campaign returned better than expected grades within the central zone of the Kobada main shear and reinforced the predictiveness of our geological model. High-grade intersections over a greater thickness together with additional resources in the satellite orebodies is expected to complement the resource model favourably.

Highlights include:

  • Drill hole KP19_P1_03 returned 1.65 g/t gold over 4.90 m, including 3.09 g/t gold over 2.5 m
  • Drill hole KP19_P1_11 returned 12.60 g/t gold over 1.0 m
  • Drill hole KP19_P1_12 returned 5.34 g/t gold over 6.0 m including 29.70 g/t gold over 1.05 m
  • Drill hole KP19_P1_17 returned 1.59 g/t gold over 11.0 m, including 19.0 g/t gold over 0.8 m
  • Drill hole KP19_P1_17 returned 1.40 g/t gold over 5.0 m, including 6.39 g/t gold over 1.0 m
  • Drill hole KP19_P1_18 returned 0.94 g/t gold over 49.0 m, including 2.11 g/t gold over 5.71 m
  • Drill hole KP19_P1_18 returned 11.60 g/t gold over 1.55 m and 5.96 g/t gold over 1.0 m
  • Drill hole KP19_P1_20 returned 26.50 g/t gold over 1.0 m
  • Drill hole KP19_P1_21 returned 1.67 g/t gold over 21.60 m, including 11.9 g/t gold over 2.0 m and 7.14 g/t gold over 1.1 m
  • Drill hole KP19_P1_31 returned 2.67 g/t gold over 5.61 m, including 5.25 g/t gold over 2.61 m
  • Drill hole KP19_P1_33 returned 1.58 g/t gold over 15.06 m, including 12.40 g/t gold over 1.4 m
  • Drill hole KP19_P1_36 returned 12.30 g/t gold over 1.0 m and 3.14 g/t gold over 1.5 m
  • Drill hole KP19_P1_37 returned 1.45 g/t gold over 19.0 m, including 4.96 g/t gold over 1.82 m and 13.20 g/t gold over 1.3 m

“The very compact high-grade intersections over several metres in the area of the future open pit are very encouraging,” says Dr. Andreas Rompel, Vice President Exploration of the Company. “We are very pleased with the completion of the Phase 1 drilling program and are keenly expecting the revised resource model and more positive results from Phase 2. The Kobada ore body is exhibiting significant upside potential and our focus now is on targeting extensions to the main shear zone where the drilling has been focused, but also to explore other shear zones on the concession. To date we have still only drilled approximately 4km of the main shear zone, in which the updated resource will be targeted. There are an additional 26 strike kilometres of identified shear zones, exhibiting identical geological characteristics to the Kobada shear. Based upon the work done to date, it becomes obvious that there is great potential to significantly increase the Kobada resource on the back of additional exploration drilling.”

The Phase 1 drilling campaign, which focused on confirming and upgrading the confidence level of the previous Mineral Resource, has confirmed a strong correlation with the geological model of the 2016 Feasibility Study. AGG drilled 34 drill holes totaling 5,302.8 metres of core during Phase 1. The returned assays were tested by fire assay with AAS finish in the accredited SGS laboratory in Bamako, Mali. The laboratory operates a quality system according to the ISO 17 025 standards.

AGG has implemented quality assurance and quality control (QAQC) protocols for the drilling campaign to ensure consistent quality. Every 10th sample is either a blank sample, certified reference material (CRM) of various grades or duplicate samples.

All samples were core samples of HQ or NQ size. The laterite, saprolite and transition zones were drilled HQ size and the harder, less weathered sulphide zone was drilled using NQ. Overall core recovery throughout Phase 1 was approximately 85% in Saprolite and 95% in fresh/hard rock.

Phase 2 Drilling Campaign

The Phase 2 drilling campaign is already 75% complete and is progressing to the north of the central zone with the aim to expand the total Mineral Resource. The Company is anticipating the assay results for Phase 2 over the coming weeks. Continuous mineralization north of the central zone is expected to further confirm our view that the Kobada project is larger than previously suggested in the 2016 feasibility study.

“The completion of Phase 1 ahead of schedule, and commencement of Phase 2 drill programme is an exciting advancement of the Kobada project,” says Danny Callow Chief Operating Officer of AGG. “Not only have we updated and gained significant confidence as a result of Phase 1 drilling, the upside potential from Phase 2 and the Gosso target is potentially huge. As part of the definitive feasibility study work, we intended to upgrade the resource model, the ESIA and deliver a very robust study document that will allow us to move quickly into construction on this project. Everything we have seen so far points to a better than expected orebody, which is easy to mine and process, with oxide ore close to surface and mineralized throughout the Phase 1 holes. I am excited to start to deliver key components of the DFS throughout this first quarter and the resource model due at the end of January is the first key document.”

Qualified Persons

The scientific and technical information contained in this press release has been reviewed, prepared and approved by Dr. Andreas Rompel, PhD, Pr. Sci. Nat. (400274/04), FSAIMM, Vice President Exploration of AGG, who is a “Qualified Person” as defined by National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101“) and by Mr. Uwe Engelmann (BSc (Zoo. & Bot.), BSc Hons (Geol.), Pr.Sci.Nat. No. 400058/08, MGSSA), a director of Minxcon (Pty) Ltd and a member of the South African Council for Natural Scientific Professions.

About African Gold Group

African Gold Group is a Canadian listed exploration and development company on the TSX Venture Exchange (TSX V:AGG) with its focus on developing a gold platform in West Africa. Its principal asset is the Kobada Project in Mali.

Assay standards:

Samples <3.0kg are dried in trays, crushed to a nominal 2 mm using a jaw crusher, then <1.5 kg is split using a Jones type riffle. The reject sample is retained in the original bag and stored. The split is pulverised in a LM2 to a nominal 85% passing 75um. Approximately 200g sub-sample is taken for assay, with the pulverised residue retained in a plastic bag. All the preparation equipment is flushed with barren material prior to the commencement of the job. A 50g sub sample is fused with litharge-based flux, cupelled and prill dissolved in aqua regia and gold determined by flame AAS - Detection Limit 0.01ppm.

For more information:

Stan Bharti
Chairman
(416) 861 2267

Cautionary statements

This press release contains "forward looking information" within the meaning of applicable Canadian securities legislation. Forward looking information includes, but is not limited to, management’s, the Company’s development and exploration plans for the Kobada project, expectation of grade and resources at the Kobada gold project, expectation of drill results at the Kobada project, the timeline for the completion of the Phase 2 drilling program, the definitive feasibility study and the updated resource model, expectations for mineralization and location of extensions at the Kobada gold project and expected mining methods at the Kobada gold project, and other statements with respect to the future plans or intentions of the Company. Generally, forward looking information can be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", “aims”, "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved". Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied by such forward-looking information, including but not limited to: general business, economic, competitive, geopolitical and social uncertainties; the actual results of exploration activities; regulatory risks; risks inherent in foreign operations; and other risks of the mining industry. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward looking information. The Company does not undertake to update any forward-looking information, except in accordance with applicable securities laws.

NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.


Table 1: Significant Intersections (Above 1 g/t)

BHID From To Intersection Length (m) Au_Final (g/t)
KB19_P1_02 63.00 64.00 1.00 1.87
KB19_P1_02 64.00 65.00 1.00 2.20
KB19_P1_02 149.00 150.00 1.00 2.00
KB19_P1_03 21.00 23.50 2.50 3.09
KB19_P1_03 82.00 83.00 1.00 1.55
KB19_P1_03 83.00 84.60 1.60 2.13
KB19_P1_03 115.35 116.15 0.80 1.46
KB19_P1_03 116.15 118.00 1.85 1.57
KB19_P1_04 85.00 86.00 1.00 1.94
KB19_P1_05 67.50 68.80 1.30 1.44
KB19_P1_05 68.80 69.80 1.00 1.66
KB19_P1_06 74.00 75.00 1.00 1.55
KB19_P1_06 114.00 115.00 1.00 2.01
KB19_P1_06 118.50 120.50 2.00 3.06
KB19_P1_07 102.76 103.75 0.99 2.02
KB19_P1_07 103.75 104.81 1.06 2.61
KB19_P1_08 47.00 49.00 2.00 1.90
KB19_P1_17 58.40 59.20 0.80 19.00
KB19_P1_17 113.00 114.00 1.00 6.39
KB19_P1_17 125.00 126.00 1.00 1.65
KB19_P1_18 12.60 14.00 1.40 1.22
KB19_P1_18 15.89 18.90 3.01 2.35
KB19_P1_18 18.90 21.60 2.70 1.84
KB19_P1_18 24.00 25.00 1.00 1.41
KB19_P1_18 44.10 45.65 1.55 11.60
KB19_P1_18 56.00 57.00 1.00 5.96
KB19_P1_10 0.00 1.00 1.00 2.81
KB19_P1_10 8.00 9.00 1.00 1.47
KB19_P1_10 37.00 38.00 1.00 1.12
KB19_P1_09 6.50 9.00 2.50 2.09
KB19_P1_11 37.00 38.00 1.00 2.02
KB19_P1_11 56.00 56.70 0.70 1.21
KB19_P1_11 60.90 62.15 1.25 1.20
KB19_P1_11 88.00 89.40 1.40 1.97
KB19_P1_11 128.00 129.00 1.00 1.46
KB19_P1_12 158.00 159.05 1.05 29.70
KB19_P1_13 32.00 33.00 1.00 2.12
KB19_P1_13 84.00 85.00 1.00 1.67
KB19_P1_13 89.00 90.00 1.00 3.24
KB19_P1_13 93.00 94.25 1.25 2.16
KB19_P1_15 90.15 91.06 0.91 1.05
KB19_P1_20 62.25 63.50 1.25 1.14
KB19_P1_20 77.00 78.00 1.00 1.18
KB19_P1_20 120.00 121.00 1.00 4.08
KB19_P1_20 123.91 125.10 1.19 1.30
KB19_P1_20 189.00 190.00 1.00 26.50
KB19_P1_20 206.00 207.00 1.00 1.44
KB19_P1_21 18.00 20.00 2.00 11.90
KB19_P1_21 22.10 23.20 1.10 7.14
KB19_P1_21 86.90 88.50 1.60 2.94
KB19_P1_21 88.50 89.50 1.00 2.78
KB19_P1_21 97.50 98.80 1.30 4.93
KB19_P1_21 104.30 105.50 1.20 1.75
KB19_P1_21 108.50 109.50 1.00 1.57
KB19_P1_21 112.40 113.40 1.00 1.20
KB19_P1_21 123.00 124.50 1.50 1.11
KB19_P1_28 123.00 125.50 2.50 1.32
KB19_P1_28 146.63 147.63 1.00 1.95
KB19_P1_28 183.10 184.10 1.00 2.80
KB19_P1_28 189.70 190.70 1.00 1.25
KB19_P1_28 193.70 194.70 1.00 4.13
KB19_P1_28 229.67 230.67 1.00 1.64
KB19_P1_23 46.55 50.00 3.45 1.93
KB19_P1_23 76.00 77.00 1.00 2.59
KB19_P1_23 81.05 82.75 1.70 1.57
KB19_P1_23 83.33 84.45 1.12 1.40
KB19_P1_23 85.45 86.45 1.00 1.75
KB19_P1_23 101.13 102.19 1.06 1.33
KB19_P1_23 105.00 107.00 2.00 1.35
KB19_P1_23 132.00 133.00 1.00 1.71
KB19_P1_23 138.65 139.52 0.87 1.08
KB19_P1_23 141.05 141.96 0.91 5.41
KB19_P1_23 149.95 151.00 1.05 1.44
KB19_P1_27 33.50 35.00 1.50 4.18
KB19_P1_27 39.00 40.00 1.00 1.84
KB19_P1_27 44.00 45.00 1.00 1.37
KB19_P1_32 54.40 55.50 1.10 5.12
KB19_P1_31 126.79 129.40 2.61 5.25
KB19_P1_31 139.00 141.00 2.00 4.79
KB19_P1_31 142.50 143.60 1.10 1.34
KB19_P1_31 153.47 158.10 4.63 1.34
KB19_P1_31 291.72 292.72 1.00 3.76
KB19_P1_33 30.10 33.00 2.90 1.46
KB19_P1_33 36.00 36.80 0.80 6.05
KB19_P1_33 55.65 57.80 2.15 1.17
KB19_P1_33 71.15 72.00 0.85 1.70
KB19_P1_33 98.00 102.00 4.00 1.64
KB19_P1_33 124.44 125.60 1.16 1.80
KB19_P1_33 128.64 129.50 0.86 3.41
KB19_P1_33 130.40 131.80 1.40 12.40
KB19_P1_33 217.12 217.90 0.78 1.72
KB19_P1_35 61.90 64.20 2.30 1.51
KB19_P1_35 83.90 84.90 1.00 1.50
KB19_P1_36 8.80 9.80 1.00 12.30
KB19_P1_36 30.30 31.80 1.50 3.14
KB19_P1_37 63.00 64.00 1.00 5.67
KB19_P1_37 70.00 71.00 1.00 1.97
KB19_P1_37 76.72 77.50 0.78 1.57
KB19_P1_37 79.42 82.60 3.18 4.16
KB19_P1_37 96.00 97.00 1.00 2.00
KB19_P1_37 107.80 109.30 1.50 1.77
KB19_P1_37 134.00 135.82 1.82 4.96
KB19_P1_37 149.70 151.00 1.30 13.20


Table 2: Mineralization Zones

Mineralized Zone Includes
BHID Ore Body From To Composite
Length (m)
Composite
Grade (g/t)
From To Includes
(m)
Includes
(g/t)
KB19_P1_02 Southern Satellite 46.60 51.00 4.40 0.42
KB19_P1_02 Southern Satellite 56.00 57.00 1.00 0.36
KB19_P1_02 Southern Satellite 63.00 65.00 2.00 2.04
KB19_P1_02 Southern Satellite 67.00 69.00 2.00 0.60
KB19_P1_02 Southern Satellite 90.00 92.00 2.00 0.78
KB19_P1_02 Southern Satellite 149.00 150.00 1.00 2.00
KB19_P1_03 Southern Satellite 5.00 6.00 1.00 0.56
KB19_P1_03 Southern Satellite 20.00 24.90 4.90 1.65 21.00 23.50 2.50 3.09
KB19_P1_03 Southern Satellite 71.00 95.60 24.60 0.33 82.00 84.60 2.60 1.91
KB19_P1_03 Southern Satellite 104.00 123.00 19.00 0.34 115.35 118.00 2.65 1.54
KB19_P1_03 Southern Satellite 135.00 137.00 2.00 0.34
KB19_P1_03 Southern Satellite 161.00 163.00 2.00 0.53 161.00 162.00 1.00 0.92
KB19_P1_04 Southern Satellite 24.00 29.00 5.00 0.37 25.00 27.00 2.00 0.55
KB19_P1_04 Southern Satellite 83.00 90.00 7.00 0.49 85.00 87.00 2.00 1.44
KB19_P1_04 Southern Satellite 163.50 167.50 4.00 0.27 163.50 164.50 1.00 0.46
KB19_P1_05 Southern Satellite 64.50 74.00 9.50 0.79 67.50 69.80 2.30 1.54
KB19_P1_06 Southern Satellite 65.50 75.00 9.50 0.41 73.00 75.00 2.00 1.27
KB19_P1_06 Southern Satellite 105.00 120.50 15.50 0.65 114.00 115.00 1.00 2.01
KB19_P1_06 Southern Satellite 118.50 120.50 2.00 3.06
KB19_P1_07 Southern Satellite 100.00 104.81 4.81 1.35 102.76 103.75 0.99 2.02
KB19_P1_07 Southern Satellite 103.75 104.81 1.06 2.61
KB19_P1_08 Main Shear South 47.00 57.50 10.50 0.60 47.00 49.00 2.00 1.90
KB19_P1_17 Main Shear South 50.50 61.50 11.00 1.59 50.50 51.50 1.00 0.92
KB19_P1_17 Main Shear South 58.40 59.20 0.80 19.00
KB19_P1_17 Main Shear South 87.00 93.00 6.00 0.38 88.00 89.00 1.00 0.92
KB19_P1_17 Main Shear South 110.00 115.00 5.00 1.40 113.00 114.00 1.00 6.39
KB19_P1_17 Main Shear South 125.00 126.00 1.00 1.65
KB19_P1_18 Main Shear South 8.00 57.00 49.00 0.94 12.60 14.00 1.40 1.22
KB19_P1_18 Main Shear South 15.89 21.60 5.71 2.11
KB19_P1_18 Main Shear South 24.00 25.00 1.00 1.41
KB19_P1_18 Main Shear South 44.10 45.65 1.55 11.60
KB19_P1_18 Main Shear South 56.00 57.00 1.00 5.96
KB19_P1_19 Main Shear South 28.50 34.00 5.50 0.30 32.00 33.00 1.00 0.60
KB19_P1_19 Main Shear South 68.50 86.00 17.50 0.12
KB19_P1_19 Main Shear South 90.00 94.00 4.00 0.14
KB19_P1_19 Main Shear South 100.00 104.00 4.00 0.12
KB19_P1_19 Main Shear South 108.00 112.10 4.10 0.13
KB19_P1_10 Main Shear South 0.00 9.00 9.00 0.58 0.00 1.00 1.00 2.81
KB19_P1_10 Main Shear South 8.00 9.00 1.00 1.47
KB19_P1_10 Main Shear South 37.00 39.00 2.00 0.72 37.00 38.00 1.00 1.12
KB19_P1_09 Main Shear South 6.50 26.50 20.00 0.42 6.50 9.00 2.50 2.09
KB19_P1_11 Main Shear South 0.00 18.00 18.00 0.15
KB19_P1_11 Main Shear South 37.00 66.00 29.00 0.30 37.00 38.00 1.00 2.02
KB19_P1_11 Main Shear South 56.00 56.70 0.70 1.21
KB19_P1_11 Main Shear South 60.90 62.15 1.25 1.20
KB19_P1_11 Main Shear South 84.00 95.00 11.00 0.33 88.00 89.40 1.40 1.97
KB19_P1_11 Main Shear South 126.00 131.00 5.00 0.38 128.00 129.00 1.00 1.46
KB19_P1_11 Main Shear South 172.00 173.00 1.00 12.60
KB19_P1_12 Main Shear South 94.00 103.09 9.09 0.26
KB19_P1_12 Main Shear South 127.00 141.16 14.16 0.25
KB19_P1_12 Main Shear South 157.00 163.00 6.00 5.34 158.00 159.05 1.05 29.70
KB19_P1_13 Main Shear South 32.00 49.00 17.00 0.48 32.00 33.00 1.00 2.12
KB19_P1_13 Main Shear South 81.00 98.25 17.25 0.58 84.00 85.00 1.00 1.67
KB19_P1_13 Main Shear South 89.00 90.00 1.00 3.24
KB19_P1_13 Main Shear South 93.00 94.25 1.25 2.16
KB19_P1_15 Main Shear South 5.10 7.10 2.00 2.18
KB19_P1_15 Main Shear South 36.00 46.70 10.70 0.37
KB19_P1_15 Main Shear South 80.00 84.00 4.00 0.23
KB19_P1_15 Main Shear South 90.15 92.16 2.01 0.67 90.15 91.06 0.91 1.05
KB19_P1_15 Main Shear South 126.80 138.90 12.10 0.19
KB19_P1_20 Main Shear South 56.00 78.00 22.00 0.30 62.25 63.50 1.25 1.14
KB19_P1_20 Main Shear South 77.00 78.00 1.00 1.18
KB19_P1_20 Main Shear South 114.00 135.00 21.00 0.47 120.00 121.00 1.00 4.08
KB19_P1_20 Main Shear South 123.91 125.10 1.19 1.30
KB19_P1_20 Main Shear South 156.00 191.90 35.90 0.87 189.00 190.00 1.00 26.50
KB19_P1_20 Main Shear South 200.00 209.00 9.00 0.41 206.00 207.00 1.00 1.44
KB19_P1_22 Main Shear South 4.00 14.00 10.00 0.09
KB19_P1_21 Main Shear South 14.00 35.60 21.60 1.67 18.00 20.00 2.00 11.90
KB19_P1_21 Main Shear South 22.10 23.20 1.10 7.14
KB19_P1_21 Main Shear South 58.60 129.30 70.70 0.46 86.90 88.50 1.60 2.94
KB19_P1_21 Main Shear South 88.50 89.50 1.00 2.78
KB19_P1_21 Main Shear South 97.50 98.80 1.30 4.93
KB19_P1_21 Main Shear South 104.30 105.50 1.20 1.75
KB19_P1_21 Main Shear South 108.50 109.50 1.00 1.57
KB19_P1_21 Main Shear South 112.40 113.40 1.00 1.20
KB19_P1_21 Main Shear South 123.00 124.50 1.50 1.11
KB19_P1_21 Main Shear South 155.00 157.00 2.00 0.11
KB19_P1_28 Main Shear South 110.00 111.00 1.00 0.64
KB19_P1_28 Main Shear South 117.00 161.10 44.10 0.40 123.00 125.50 2.50 1.32
KB19_P1_28 Main Shear South 146.63 147.63 1.00 1.95
KB19_P1_28 Main Shear South 177.10 194.70 17.60 0.56 183.10 184.10 1.00 2.80
KB19_P1_28 Main Shear South 189.70 190.70 1.00 1.25
KB19_P1_28 Main Shear South 193.70 194.70 1.00 4.13
KB19_P1_28 Main Shear South 218.64 219.64 1.00 6.07
KB19_P1_28 Main Shear South 228.67 230.67 2.00 0.92 229.67 230.67 1.00 1.64
KB19_P1_28 Main Shear South 246.67 258.18 11.51 0.19
KB19_P1_23 Main Shear South 28.20 31.80 3.60 0.38
KB19_P1_23 Main Shear South 42.00 50.00 8.00 1.01 46.55 50.00 3.45 1.93
KB19_P1_23 Main Shear South 62.75 64.34 1.59 0.57
KB19_P1_23 Main Shear South 73.00 160.30 87.30 0.43 76.00 77.00 1.00 2.59
KB19_P1_23 Main Shear South 81.05 82.75 1.70 1.57
KB19_P1_23 Main Shear South 83.33 84.45 1.12 1.40
KB19_P1_23 Main Shear South 85.45 86.45 1.00 1.75
KB19_P1_23 Main Shear South 101.13 102.19 1.06 1.33
KB19_P1_23 Main Shear South 105.00 107.00 2.00 1.35
KB19_P1_23 Main Shear South 132.00 133.00 1.00 1.71
KB19_P1_23 Main Shear South 138.65 139.52 0.87 1.08
KB19_P1_23 Main Shear South 141.05 141.96 0.91 5.41
KB19_P1_23 Main Shear South 149.95 151.00 1.05 1.44
KB19_P1_27 Main Shear South 27.00 45.00 18.00 0.69 33.50 35.00 1.50 4.18
KB19_P1_27 Main Shear South 39.00 40.00 1.00 1.84
KB19_P1_27 Main Shear South 44.00 45.00 1.00 1.37
KB19_P1_27 Main Shear South 56.00 62.40 6.40 0.32
KB19_P1_29 Main Shear South 40.79 42.00 1.21 0.42
KB19_P1_32 Main Shear South 26.00 36.80 10.80 0.13 33.00 33.80 0.80 0.39
KB19_P1_32 Main Shear South 50.00 55.50 5.50 1.13 54.40 55.50 1.10 5.12
KB19_P1_24 Main Shear South 0.00 7.00 4.00 0.28 6.00 7.00 1.00 0.56
KB19_P1_31 Main Shear South 0.00 1.10 1.10 0.41 0.60 1.10 0.50 0.74
KB19_P1_31 Main Shear South 123.79 129.40 5.61 2.67 126.79 129.40 2.61 5.25
KB19_P1_31 Main Shear South 134.00 164.79 30.79 0.86 139.00 141.00 2.00 4.79
KB19_P1_31 Main Shear South 142.50 143.60 1.10 1.34
KB19_P1_31 Main Shear South 153.47 158.10 4.63 1.34
KB19_P1_31 Main Shear South 209.90 214.00 4.10 0.13
KB19_P1_31 Main Shear South 252.15 257.15 5.00 0.09
KB19_P1_31 Main Shear South 265.15 269.81 4.66 0.24
KB19_P1_31 Main Shear South 279.48 286.61 7.13 0.12
KB19_P1_31 Main Shear South 291.72 292.72 1.00 3.76
KB19_P1_31 Main Shear South 300.33 303.81 3.48 0.36
KB19_P1_33 Main Shear Central 26.00 36.80 10.80 0.92 30.10 33.00 2.90 1.46
KB19_P1_33 Main Shear Central 36.00 36.80 0.80 6.05
KB19_P1_33 Main Shear Central 55.65 76.00 20.35 0.29 55.65 57.80 2.15 1.17
KB19_P1_33 Main Shear Central 71.15 72.00 0.85 1.70
KB19_P1_33 Main Shear Central 96.75 116.83 20.08 0.48 98.00 102.00 4.00 1.64
KB19_P1_33 Main Shear Central 124.44 139.50 15.06 1.58 124.44 125.60 1.16 1.80
KB19_P1_33 Main Shear Central 128.64 129.50 0.86 3.41
KB19_P1_33 Main Shear Central 130.40 131.80 1.40 12.40
KB19_P1_33 Main Shear Central 173.00 178.00 5.00 0.34
KB19_P1_33 Main Shear Central 198.85 200.92 2.07 0.29
KB19_P1_33 Main Shear Central 217.12 217.90 0.78 1.72
KB19_P1_34 Main Shear Central 3.00 7.50 4.50 0.28
KB19_P1_34 Main Shear Central 44.00 45.00 1.00 0.67
KB19_P1_34 Main Shear Central 93.20 97.20 4.00 0.16
KB19_P1_35 Main Shear Central 57.00 67.00 10.00 0.60 61.90 64.20 2.30 1.51
KB19_P1_35 Main Shear Central 83.00 86.30 3.30 0.98 83.90 84.90 1.00 1.50
KB19_P1_36 Main Shear North 4.80 31.80 27.00 0.72 8.80 9.80 1.00 12.30
KB19_P1_36 Main Shear North 30.30 31.80 1.50 3.14
KB19_P1_36 Main Shear North 59.80 64.80 5.00 0.60
KB19_P1_37 Main Shear North 41.10 85.78 44.68 0.69 63.00 64.00 1.00 5.67
KB19_P1_37 Main Shear North 70.00 71.00 1.00 1.97
KB19_P1_37 Main Shear North 76.72 77.50 0.78 1.57
KB19_P1_37 Main Shear North 79.42 82.60 3.18 4.16
KB19_P1_37 Main Shear North 93.00 110.30 17.30 0.40 96.00 97.00 1.00 2.00
KB19_P1_37 Main Shear North 107.80 109.30 1.50 1.77
KB19_P1_37 Main Shear North 132.00 151.00 19.00 1.45 134.00 135.82 1.82 4.96
KB19_P1_37 Main Shear North 149.70 151.00 1.30 13.20

Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!




Mineninfo
Toubani Resources Inc.
Bergbau
A3DU7R
AU0000241416
Minenprofile
Alle Angaben ohne Gewähr! Copyright © by GoldSeiten.de 1999-2024.
Die Reproduktion, Modifikation oder Verwendung der Inhalte ganz oder teilweise ohne schriftliche Genehmigung ist untersagt!

"Wir weisen Sie ausdrücklich auf unser virtuelles Hausrecht hin!"