Palladium One Initial Infill Drilling Delivers High-Grades and Continuity at Kaukua South in Finland
Toronto, January 18, 2021 - Palladium One Mining Inc. (TSXV: PDM) (FSE: 7N11) (OTC Pink: NKORF) (“Palladium One” or the "Company") announced initial infill drilling results from the 17,500-meter Phase II drill program have delivered superior grades and demonstrate broad zones of continuity with multiple intercepts of high-grade, open-pit resource potential at the Kaukua South zone of the LK PGE-Ni-Cu project in Finland.
Starting at only 43 meters down hole, hole LK20-028, returned 53 meters at 2.1 g/t Pd_Eq*, with a core interval starting 47 meters down hole of 25 meters at 2.9 g/t Pd_Eq. Hole LK20-029 returned 25 meters at 2.6 g/t Pd_Eq starting at only 38 meters down hole, with a high-grade core starting 56 meters down hole of 5.5 meters grading 4.3 g/t Pd_Eq.
These first seven holes represent a series of step out holes from Phase I drill holes LK20-016 and 018 which returned 63 meters of 3.5 g/t Pd_Eq and 35 meters of 2.8 g/t Pd_Eq. respectively (see news release October 22, 2020).
"Initial Phase II infill drill results at Kaukua South demonstrate shallow disseminated sulphide mineralization the same as the Kaukua Deposit and support the belief that LK hosts a very large-scale mineralized system." said Derrick Weyrauch, President and CEO. "With a greater than 4-kilometer, drilling proven, mineralized strike length at Kaukua South, plus up to an additional 2-kilometer strike length potential east of our existing Induced Polarization (IP) survey, we are on track to potentially define a multi-million ounce resource at Kaukua South," said Weyrauch.
Highlights
- Excellent grade and width continuity at Kaukua South demonstrated by the first seven holes, returning Palladium-rich mineralization ranging from 25 to 60 meters drilled width returning between 1.8 to 2.6 g/t Pd_Eq.
- Near surface mineralization continues to be intersected with hole LK20-031 collaring into mineralized bedrock at 18 meters down hole.
- Higher-grade core zones continue to be intersected such as 5.5 meters returning 4.3g/t Pd_Eq in hole LK20-029.
- Drilling supports the potential of an economically robust open pit resource at Kaukua South.
- As at December 31, 2020, the Company had a cash balance of $7.2 million dollars (unaudited).
Kaukau South Expansion Potential
Regional Magnetic data suggests that favourable, mafic/ultramafic, Kaukua South host rocks continue to the east off the current Kaukau South IP survey grid (Figure 4). The Company has applied to upgrade its Exploration Reservation in this area into an Exploration Permit for future drill testing. Plans are underway for a high-resolution drone magnetic and IP survey over this extended area.
Updated NI 43-101 Resource Report for the Kaukua Deposit of the Läntinen Koillismaa (LK") PGE -Ni-Cu Project
On January 15, 2021, an updated NI43-101 Resource Report was filed, at www.SEDAR.com, in respect of the Läntinen Koillismaa (LK") PGE -Ni-Cu Project. This new report includes revised property boundaries and all Phase I exploration drilling data.
Table 1: Initial Phase 2 Drill Results
Zone | Hole | From (m) | To (m) | Width (m) | Pd_Eq g/t* | PGE g/t (Pd+Pt+Au) | Pd g/t | Pt g/t | Au g/t | Cu % | Ni % |
Kaukua South | LK20-016 | 23.5 | 86.2 | 62.7 | 3.52 | 2.62 | 1.84 | 0.64 | 0.14 | 0.18 | 0.15 |
Inc. | 23.5 | 66.0 | 42.5 | 4.15 | 3.14 | 2.21 | 0.77 | 0.16 | 0.21 | 0.17 | |
Inc. | 47.5 | 66.0 | 18.5 | 4.58 | 3.55 | 2.51 | 0.86 | 0.18 | 0.22 | 0.17 | |
Inc. | 60.5 | 64.5 | 4.0 | 5.12 | 4.02 | 2.86 | 1.00 | 0.16 | 0.23 | 0.19 | |
Kaukua South | LK20-019 | 17.3 | 52.3 | 35.0 | 2.76 | 2.00 | 1.41 | 0.48 | 0.12 | 0.16 | 0.12 |
Inc. | 26.5 | 37.0 | 10.5 | 3.29 | 2.48 | 1.77 | 0.56 | 0.15 | 0.18 | 0.13 | |
Kaukua South | LK20-027 | 103.4 | 155.0 | 51.6 | 1.98 | 1.07 | 0.72 | 0.27 | 0.08 | 0.17 | 0.15 |
Inc. | 105.6 | 113.0 | 7.4 | 2.58 | 1.34 | 0.90 | 0.31 | 0.13 | 0.26 | 0.18 | |
And | 149.5 | 155.0 | 5.5 | 3.12 | 1.96 | 1.34 | 0.52 | 0.10 | 0.27 | 0.17 | |
Inc. | 153.5 | 155.0 | 1.5 | 6.14 | 4.09 | 2.79 | 1.15 | 0.15 | 0.56 | 0.28 | |
Kaukua South | LK20-028 | 42.6 | 95.5 | 52.9 | 2.06 | 1.44 | 1.00 | 0.36 | 0.08 | 0.11 | 0.11 |
Inc. | 46.9 | 72.0 | 25.1 | 2.92 | 2.08 | 1.44 | 0.52 | 0.12 | 0.17 | 0.14 | |
Inc. | 50.5 | 60.0 | 9.5 | 3.56 | 2.52 | 1.75 | 0.61 | 0.16 | 0.23 | 0.16 | |
Kaukua South | LK20-029 | 37.5 | 62.9 | 25.4 | 2.57 | 1.87 | 1.30 | 0.46 | 0.11 | 0.15 | 0.11 |
Inc. | 47.0 | 62.0 | 15.0 | 3.16 | 2.36 | 1.65 | 0.58 | 0.13 | 0.17 | 0.13 | |
Inc. | 56.5 | 62.0 | 5.5 | 4.34 | 3.36 | 2.36 | 0.82 | 0.18 | 0.20 | 0.16 | |
Inc | 56.5 | 57.7 | 1.2 | 6.15 | 4.97 | 3.54 | 1.26 | 0.17 | 0.25 | 0.21 | |
Kaukua South | LK20-030 | 26.4 | 86.5 | 60.1 | 1.88 | 1.00 | 0.68 | 0.24 | 0.07 | 0.17 | 0.14 |
Inc. | 47.0 | 68.0 | 21.0 | 2.44 | 1.43 | 0.98 | 0.35 | 0.10 | 0.21 | 0.16 | |
Inc. | 53.0 | 54.5 | 1.5 | 3.94 | 2.69 | 1.78 | 0.78 | 0.12 | 0.28 | 0.20 | |
Kaukua South | LK20-031 | 17.9 | 61.5 | 43.6 | 1.94 | 1.12 | 0.76 | 0.27 | 0.09 | 0.16 | 0.13 |
Inc. | 17.9 | 55.5 | 37.6 | 2.17 | 1.25 | 0.85 | 0.30 | 0.10 | 0.19 | 0.14 | |
Inc. | 24.5 | 35.0 | 10.5 | 2.81 | 1.60 | 1.09 | 0.39 | 0.11 | 0.27 | 0.18 | |
Kaukua South | LK20-032 | 60.3 | 108.3 | 48.0 | 1.81 | 0.84 | 0.57 | 0.21 | 0.06 | 0.16 | 0.16 |
Inc. | 61.4 | 75.0 | 13.7 | 2.12 | 0.90 | 0.58 | 0.23 | 0.09 | 0.22 | 0.20 | |
Kaukua South | LK20-033 | 41.3 | 85.0 | 43.7 | 1.76 | 0.87 | 0.58 | 0.21 | 0.07 | 0.18 | 0.14 |
Inc. | 42.7 | 56.3 | 13.7 | 2.33 | 1.21 | 0.83 | 0.28 | 0.10 | 0.21 | 0.18 |
* Reported widths are "drilled widths" not true widths.
** Orange shaded values are previously released (see press release October 22, 2020)
Figure 1. Kaukua area plan map, showing current NI 43-101 Kaukua Deposit conceptual pit outline (dashed yellow), Kaukua South IP chargeability anomalies, and Phase I drill hole locations.
To view an enhanced version of Figure 1, please visit:
https://orders.newsfilecorp.com/files/6502/72230_04a669172475c9b6_001full.jpg
Figure 2. Plan map of Initial Infill drilling near holes LK20-016 & 019. Background is IP chargeability.
To view an enhanced version of Figure 2, please visit:
https://orders.newsfilecorp.com/files/6502/72230_04a669172475c9b6_002full.jpg
Figure 3. Cross section of holes LK20-028 and 029.
To view an enhanced version of Figure 3, please visit:
https://orders.newsfilecorp.com/files/6502/72230_04a669172475c9b6_003full.jpg
Figure 4. Kaukua area property outlines and IP grids, (yellow lines represent the present Exploration Permits, red lines represent the present Exploration Reservation) and expansion potential for Kaukua south mineralization in black.
To view an enhanced version of Figure 4, please visit:
https://orders.newsfilecorp.com/files/6502/72230_04a669172475c9b6_004full.jpg
*Palladium Equivalent
Palladium equivalent is calculated using US$1,100 per ounce for palladium, US$950 per ounce for platinum, US$1,300 per ounce for gold, US$6,614 per tonne for copper, and US$15,4332 per tonne for nickel. This calculation is consistent with the calculation in the Company's September 2019 NI 43-101 Kaukua resource estimate.
QA/QC
The Phase I drilling program was carried out under the supervision of Neil Pettigrew, M.Sc., P. Geo., Vice President of Exploration and a director of the Company.
Drill core samples were split using a rock saw by Company staff, with half retained in the core box and stored indoors in a secure facility, in Taivalkoski, Finland. The drill core samples were transported by courier from the Company's core handling facility in Taivalkoski, Finland, to ALS Global ("ALS") laboratory in Outokumpu, Finland. ALS, is an accredited lab and are ISO compliant (ISO 9001:2008, ISO/IEC 17025:2005). PGE analysis was performed using a 30 gram fire assay with an ICP-MS or ICP-AES finish. Multi-element analyses, including copper and nickel were analysed by four acid digestion using 0.25 grams with an ICP-AES finish.
Certified standards, blanks and crushed duplicates are placed in the sample stream at a rate of one QA/QC sample per 10 core samples. Results are analyzed for acceptance at the time of import. All standards associated with the results in this press release were determined to be acceptable within the defined limits of the standard used
Qualified Person
The technical information in this release has been reviewed and verified by Neil Pettigrew, M.Sc., P. Geo., Vice President of Exploration and a director of the Company and the Qualified Person as defined by National Instrument 43-101.
About Palladium One
Palladium One Mining Inc. is an exploration stage company focused on discovering Green Energy Meals (Metals for Clean Air). The Company has four district scale, platinum-group-element (PGE)-copper-nickel deposits in Finland and Canada. Its most advanced project is the Läntinen Koillismaa or LK Project, a palladium-dominant platinum group element-copper-nickel project in north-central Finland, ranked by the Fraser Institute as one of the world's top countries for mineral exploration and development. Exploration at LK is focused on targeting disseminated sulfides along 38 kilometers of favorable basal contact and building on an established NI 43-101 open pit resource.
ON BEHALF OF THE BOARD
"Derrick Weyrauch"
President & CEO, Director
For further information contact:
Derrick Weyrauch, President & CEO
Email: info@palladiumoneinc.com
Neither the TSX Venture Exchange nor its Market Regulator (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
This press release is not an offer or a solicitation of an offer of securities for sale in the United States of America. The common shares of Palladium One Mining Inc. have not been and will not be registered under the U.S. Securities Act of 1933, as amended, and may not be offered or sold in the United States absent registration or an applicable exemption from registration.
Information set forth in this press release may contain forward-looking statements. Forward-looking statements are statements that relate to future, not past events. In this context, forward-looking statements often address a company's expected future business and financial performance, and often contain words such as "anticipate", "believe", "plan", "estimate", "expect", and "intend", statements that an action or event "may", "might", "could", "should", or "will" be taken or occur, or other similar expressions. By their nature, forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause our actual results, performance or achievements, or other future events, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Such factors include, among others, risks associated with project development; the need for additional financing; operational risks associated with mining and mineral processing; fluctuations in palladium and other commodity prices; title matters; environmental liability claims and insurance; reliance on key personnel; the absence of dividends; competition; dilution; the volatility of our common share price and volume; and tax consequences to Canadian and U.S. Shareholders. Forward-looking statements are made based on management's beliefs, estimates and opinions on the date that statements are made and the Company undertakes no obligation to update forward-looking statements if these beliefs, estimates and opinions or other circumstances should change. Investors are cautioned against attributing undue certainty to forward-looking statements.
To view the source version of this press release, please visit https://www.newsfilecorp.com/release/72230