E79 Resources Commences Maiden Diamond Drilling Program at Happy Valley Gold Prospect
Rory Quinn, E79's President and Chief Executive Officer stated, "This represents an important milestone in the evolution of the Company from one that has previously been focused on generating high-quality surface gold targets to a Company that is now actively drilling to discover primary hard-rock gold mineralization.
We are excited to have the drill bit turning at Happy Valley. The Company is targeting down-dip extensions of high-grade gold (31g/t Au)1 historically mined at Happy Valley. This 7-8km trend of intermittent shallow workings has never been systematically explored at depth or along strike.
We look forward to communicating early results from this drilling, soon."
Highlights
- Drilling currently underway
- Initial plan is for 1,000 meters of diamond drilling targeting down-dip extensions of previously mined quartz lodes at the Happy Valley Gold Mine, which historically produced at 31g/t Au1
- The majority of historic gold mining operations terminated at the water table, due to limited pumping capacity at the time
- The Happy Valley Mining Centre sits along a multi-kilometer trend which is defined by historic workings and has never seen modern, systematic exploration
Happy Valley Gold Prospect
The Happy Valley Prospect is situated in the south eastern portion of the Company's Exploration Licence EL006724 located in Victoria, Australia (Figure 2). The Happy Valley Mining Centre has documented historic production of 34,200 ounces of gold1 predominantly during the period 1866 - 1875. Since that time only limited exploration has been conducted, despite the high-grade nature of the mineralization.
Next Steps
- All core will be geologically and structurally logged, assessed for hydrothermal alteration and sampled for Au and multi-element geochemistry to aid in defining new target areas
- The Company will use the observations from the initial results to develop a comprehensive structural model for the Happy Valley target area
- A permit wide review and re-processing of geophysical data from the Myrtleford exploration license has begun to define additional targets
- This interpretation will be integrated with the drilling results to drive further targeting at Happy Valley and across the entire project area
Qualified Person
Peter de Vries, MAIMM, MAIG a "Qualified Person" as defined by National Instrument 43-101, has read and approved all technical and scientific information contained in this news release. Mr. de Vries is the owner of Geological, Educational and Mining Services (GEMS) Pty Ltd, a geological consulting services company based in Victoria, Australia, and is Exploration Manager for E79 Resources.
About E79 Resources Corp.
E79 Resources is focused on exploring for Fosterville-type mineralization at its Beaufort and Myrtleford properties in the Victorian Goldfields, Australia. At Beaufort, an opportunity exists to explore for a hard rock source of a major alluvial goldfield along a structure that is known to host gold in the region. The Myrtleford property represents the consolidation of an entire historic gold camp with over 70 past producing gold mines on the property, where the bulk of historic mining stopped at the water table. The Company continues to evaluate corporate development opportunities in the underexplored and historically prolific Victorian Goldfields.
1. | NI 43-101 Technical Report EL006724 Myrtleford Northeast Region, Victoria, Australia prepared for E79 and filed on SEDAR, Oct 26, 2020. |
Cautionary Note Regarding Forward-Looking Statements | |
Neither the Canadian Securities Exchange nor its Regulation Services Provider accepts responsibility for the adequacy or accuracy of this release. |
SOURCE E79 Resources Corp.
Contact
Rory Quinn, President, Chief Executive Officer and Director, E79 Resources Corp., Email: info@E79resources.com, Website: www.E79resources.com