Suche
 
Folgen Sie uns auf:

First Energy Drills 1.03 Percent Lithium Oxide Over 5 Meters At Augustus Lithium Property

17.10.2022  |  CNW

VANCOUVER, Oct. 17, 2022 - First Energy Metals Ltd. (CSE: FE) ("First Energy" or the "Company) is pleased to announce results of Phase 2 exploration program drill holes LC21-33 to 37 at its Augustus Lithium Property in Quebec, Canada. The drill hole LC21-35 intersected a 11.20-meter-wide zone with 0.91 percent (%) lithium oxide (Li2O) at 146 metres (m), including a 5 m zone with 1.03% Li2O at 146 m and 3.2 m with 1% Li2O at 154 m. This drill hole also has a lower seven meters wide zone with 0.54% Li2O at 165m drilled depth and several other smaller intercepts with variable lithium grades (see Table 2 for details).

Highlights

  • Drill hole LC 21-33 intersected two zones; a 13.20-meter-wide zone with 0.08% Li2O at 2.7 m, and a 59.2- meters- wide zone with 0.07% Li2O at 34.8 m drilled depth.
  • Drill hole LC 21-34 intersected two zones; a 11.73-meter-wide zone with 0.09% Li2O at 1.7 m, and a 75.3- meters- wide zone with 0.08% Li2O at 67.63 m drilled depth including a one-meter section of 1.49% Li2O at 81 m.
  • The drill hole LC21-35 intersected a 11.20-meter-wide zone with 0.91 % Li2O at 146 m, including a 5 m zone with 1.03% Li2O at 146 m and 3.2 m with 1% Li2O at 154 m. There is another seven meters wide zone with 0.54% Li2O at 165 m drilled depth including 2.06% Li2O over one meter at 169 m. This drill hole also intercepted several smaller intercepts with variable grades as shown in Table 2.
  • Drill hole LC 21-36 intersected two weakly anomalous zones; a 9.8-meter-wide zone with 0.05% Li2O at 171 m, and a 7.5- meters- wide zone with 0.04% Li2O at 198 m drilled depth.
  • Drill hole LC 21-37 intersected multiple weakly anomalous zones with widths in the range of 3 to 10 metres and 0.06-0.09% Li2O. This is the only drill hole completed at the Valor prospect.

Table 1: Drill Hole Details

Drill Hole ID

Prospect

Location (NAD 1983,
Zone 18N)

Azimuth
(deg)

Dip (deg)

Total Drilled Depth (m)

LC21-33

Beluga / Canadian Lithium

284891E, 5368350N

257

-51

261

LC21-34

Beluga / Canadian Lithium

284891E, 5368350N

257

-81

213

LC21-35

Augustus

287205E, 5367935N

220.2

-50.39

203

LC21-36

Augustus

287120E, 5367956N

212.85

-49

234

LC21-37

Valor

283716E, 5363632N

236.21

42.3

175.14

All intercepts reported are based on drilled widths and have not been converted to the true width. The results of remaining drill holes from Phase 2 drill program are pending.

To date a total of 41 drill holes with a cumulative core drilling of over 7,500 m has been completed on the Property. The drill core is being logged and sampled at the core shack using a rock saw. For quality control and quality assurance (QA/QC), field duplicates, standards and blanks are being inserted at industry standard intervals.

The samples were bagged and tagged using best practices and were delivered to Activation Laboratories ("ACTLABS"), Ancaster, Ontario for sample preparation and analyses using laboratories code Ultratrace 7 and sodium peroxide fusion (Na2O2) as summarized below. ACTLABS is an independent commercial, accredited ISO Certified Laboratory.

Afzaal Pirzada, P.Geo., Geological Consultant of the Company, and a "Qualified Person" for the purposes of National Instrument 43-101 - Standards of Disclosure for Mineral Projects, has reviewed and approved the scientific and technical information contained in this news release.

ON BEHALF OF THE BOARD OF
First Energy Metals Ltd.

"Gurminder Sangha"
Gurminder Sangha
CEO & Director

Neither the Canadian Securities Exchange (CSE) nor its Regulation Services Provider accepts responsibility for the adequacy or accuracy of this news release and has neither approved nor disapproved the contents of this news release.

Forward-looking Information

Except for the statements of historical fact, this news release contains "forward-looking information" within the meaning of the applicable Canadian securities legislation that is based on expectations, estimates and projections as at the date of this news release. "Forward-looking information" in this news release includes information about the Company's information concerning the intentions, plans and future actions of the parties to the transactions described herein and the terms thereon.

The forward-looking information in this news release reflects the current expectations, assumptions and/or beliefs of the Company based on information currently available to the Company. In connection with the forward-looking information contained in this news release, the Company has made assumptions about the Company's ability to obtain required approvals. The Company has also assumed that no significant events occur outside of the Company's normal course of business. Although the Company believes that the assumptions inherent in the forward-looking information are reasonable, forward-looking information is not a guarantee of future performance and accordingly undue reliance should not be put on such information due to the inherent uncertainty therein.

Table 2: Drill Hole LC21-35 Sample assays highlights

Depth From
(m)

Depth To
(m)

Width
(m)

Lithium
(ppm)

Li2O
%

104.9

106

1.10

20

0.00

106

107

1.00

55

0.01

107

107.65

0.65

58

0.01

109

110.3

1.30

2240

0.48

110.3

110.8

0.50

3050

0.66

111.62

112.5

0.88

3400

0.73

118.75

119.25

0.50

2230

0.48

123.4

124.4

1.00

86

0.02

139.65

140.5

0.85

4110

0.88

140.5

141

0.50

624

0.13

141

142

1.00

4260

0.92

145.5

146

0.50

92

0.02

Main Lithium Intercept

146

147

1.00

4760

1.02

147

148

1.00

6660

1.43

148

149

1.00

2660

0.57

149

150

1.00

4500

0.97

150

151

1.00

5280

1.14

151

152

1.00

1790

0.38

Including 5.0 m @1.03%Li2O @146 m

152

153

1.00

4300

0.92

153

154

1.00

2510

0.54

154

155

1.00

3240

0.70

155

156

1.00

5950

1.28

156

157.2

1.20

4720

1.01

Including 3.2 m @1.0% Li2O at 154 m

146

157.2

11.20

4215

0.91

157.2

157.7

0.50

575

0.12

163.35

164

0.65

2170

0.47

164

165

1.00

172

0.04

Second Lithium Intercept

165

166

1.00

546

0.12

166

167

1.00

951

0.20

167

168

1.00

1100

0.24

168

169

1.00

3300

0.71

169

170

1.00

9600

2.06

170

171

1.00

1420

0.31

171

172

1.00

614

0.13

165

172

7.00

2504

0.54

172

173.45

1.45

148

0.03

173

173.45

0.45

47

0.01

Note: A standard conversion factor of 2.15 was used to report Li to Li2O values

All intersections reported are based on drilled width and have not been converted to the true width.

SOURCE First Energy Metals Ltd.



Contact
please contact the Company at: gsangha@firstenergymetals.com or (604) 375-6005
Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!




Mineninfo
FE Battery Metals Corp.
Bergbau
A3D08G
CA31422Y1007
Minenprofile
Alle Angaben ohne Gewähr! Copyright © by GoldSeiten.de 1999-2024.
Die Reproduktion, Modifikation oder Verwendung der Inhalte ganz oder teilweise ohne schriftliche Genehmigung ist untersagt!

"Wir weisen Sie ausdrücklich auf unser virtuelles Hausrecht hin!"