Adamera Minerals Corp. Drills +60 Metres of Disseminated Sulfides on Buckhorn 2.0 Gold Project
The two holes were drilled to the south from a single site. Both holes intersected zones of sulfides at the depths modelled from the geophysical data. The first hole which was drilled at an inclination of -85o, intersected zones with disseminated sulfides in locally fragmental and altered limestone / marble over a 60-metre core interval. The second hole which was drilled at an inclination of -50o, repeated the mineralization and lithologies but over a 90-metre core interval. The true thickness of these intervals has not been determined. Samples are being submitted to an accredited laboratory for assay. Other zones of disseminated sulfides intersected in each drill hole will also be submitted for gold assay.
"The modelled dimensions of the VTEM-30 target based on geophysics is 1000 metres long and 400 metres wide. The discovery of a thick body of non outcropping disseminated sulfides coincident with the geophysics and only 1.5 kms from the former Buckhorn Gold Mine is potentially very significant. We eagerly await assay results," says Mark Kolebaba, President and CEO of Adamera Minerals Corp.
The Buckhorn Gold Mine was operated as an underground mine by Kinross Gold Corp until 2017. It is reported to have produced approximately 1.3 million ounces of gold at an average grade of 13 g/t gold. Much of the gold in the Buckhorn mine was associated with disseminated sulfides.
Jim Ebisch P. Geo is a qualified person that has reviewed the drill core associated with the drill holes.
About Adamera
Adamera Minerals Corp. is exploring for a high-grade gold deposit near Republic Washington. This area has reportedly produced 8 million ounces of gold. Adamera is the dominant regional explorer in the area.
On behalf of the Board of Directors,
Mark Kolebaba
President & CEO
For additional information please contact:
Email: info@Adamera.com
Website: www.Adamera.com
The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release. Statements in this press release, other than purely historical information, including statements relating to the Company's future plans and objectives or expected results, may include forward-looking statements. Forward-looking statements are based on numerous assumptions and are subject to all of the risks and uncertainties inherent in resource exploration and development. As a result, actual results may vary materially from those described in the forward-looking statements.