VANCOUVER, British Columbia - , March 17, 2023 -- March 17, 2023 NEWS RELEASE OROCO CLOSES NON-BROKERED PRIVATE PLACEMENT VANCOUVER, British Columbia - Oroco Resource Corp. is pleased to announce that it has closed a non-brokered private placement raising gross proceeds of $4,758,727.55 through the sale of a total of 6,344,970 units at a price of [...]
Oroco Resource Corp. announces assay results from drill holes S004 through S018 of its South Zone drilling program at its Santo Tomas property located in northwestern Mexico . To view an interactive 3D model that includes the South Zone results announced today, please use the following link: https://vrify.com or visit Oroco's website [...]
Oroco Resource Corp. announces further assay results from the North Zone drilling program at its Santo Tomas project located in northwestern Mexico. Holes N039 to N043 totalled 2,668 m of drilling which demonstrated continuity of good grade mineralization, including 135 m of 0.60 CuEq . The strike length of the North Zone now spans approximately [...]
Oroco Resource Corp. announces that its shareholders have approved the Company's amended 10% rolling stock option plan at its Annual General Meeting of Shareholders held on December 16, 2022 . The Plan The maximum number of common shares which may be issued under the Plan is 10% of the Company's issued and outstanding share capital at the date of [...]
Oroco Resource Corp. announces assay results from drill holes N032 through N038 of its drilling program in the North Zone of its Santo Tomas property located in northwestern Mexico . The Company is continuing to confirm and expand the 2009 Gradeshell model of Cu >0.30% derived from the historical drilling described in the Company's 2019 Technical [...]
Oroco Resource Corp. announces assay results from drill holes S001 through S003 of its drilling program in the South Zone of its Santo Tomas property located in northwestern Mexico . The South Zone 2022 drill program is designed to confirm and expand the historical South Zone resource and define shallow seated mineralization along strike with the [...]
Oroco Resource Corp. announces assay results from an additional 2,668 m of drilling from Holes N027 through N031 of its drilling program in the North Zone and 1,456 m of drilling from holes B006 and B007 in the Brasiles Zone of its Santo Tomas property located in northwestern Mexico. To view an interactive 3D model that includes the North Zone [...]
Oroco Resource Corp. announces assay results from an additional 3,594 m of drilling from Holes N019 through N026 of its drilling program in the North Zone of its Santo Tomas property located in northwestern Mexico derived from the historical drilling described in the Company's 2019 Technical Report. A total of 35 holes have now been completed in [...]
Oroco Resource Corp. is pleased to announce the commencement of a Preliminary Economic Assessment for the North and South Zones of the Santo Tomas Project located in NE Sinaloa, Mexico . The Company has appointed Ausenco Engineering USA South Inc. to lead the Study, with SRK Consulting Inc. to complete an updated Mineral Resource Estimate and [...]
Oroco Resource Corp. is pleased to announce assay results from an additional 3,050 m of drilling from holes N015 through N018 of its drilling program in the North Zone of its Santo Tomas property in northwestern Mexico derived from the historical drilling described in the Company's 2019 Technical Report. A total of 26 holes have now been completed [...]
Oroco Resource is pleased to announce the receipt of additional assay results from its drilling campaign at the Santo Tomas property in northwestern Mexico, having received and quality controlled the drill results from Holes N013 and N014 in the North Zone deposit. Assay results through the first fourteen drill holes (10,293 m of drilling) are now [...]
Oroco Resource is pleased to announce that it has resumed its drilling operations at Santo Tomas as the Federal military operations in the area have ended. Drilling commenced overnight at Brasiles with the resumption of Hole B007, and in the North Zone with the continuation of Hole N020. “A safe and orderly return to drilling has been undertaken [...]