Newrange Gold Corp. is pleased to announce that the Company has initiated a 52 line km IP and Resistivity survey being conducted by Géophysique TMC of Val-d'Or at the Company's Pamlico project in Nevada. The survey is designed to expand and increase resolution of the large "Line 5" chargeability anomaly and a separate but potentially related [...]
Newrange Gold Corp. is pleased to provide the following corporate update. The Company has exercised its option to acquire a 100% interest in the H Lake Property, which forms the western portion of its North Birch Project east of Red Lake, Ontario. Pursuant to the Option Agreement signed with Bounty Gold Corp. on January 13, 2020, Newrange has paid [...]
Newrange Gold Corp. is pleased to provide an update on the ongoing reverse circulation drilling program at its Pamlico gold project in Nevada. The holes reported herein were drilled in the Gold Box Canyon, Merritt, and Good Hope areas and demonstrate the extent of shallow oxide gold mineralization across the Pamlico District, covering an area of [...]
Newrange Gold Corp. is pleased to announce that it is finalizing plans for a winter exploration program to begin in January on its North Birch Project east of Red Lake. The Company is planning on conducting approximately 90 line kilometres of Induced Polarization geophysics and the results will be used to generate targets for follow up diamond [...]
Newrange Gold Corp. is pleased to announce that it has discovered a new zone of gold mineralization at its Pamlico Gold Project in Nevada. Hole P20-091, drilled more than 1,300 meters north-northeast of Pamlico Ridge to test a near-surface Induced Polarization chargeability anomaly near the historic Central and Sunset Mines, intersected 0.744 grams [...]
Newrange Gold Corp. is pleased to provide an update on the reverse circulation drill program at the Pamlico Gold Project in Nevada. Since commencing the program in late May, the Company has drilled 65 holes for a total of 6,538.04 meters. Assay results for the last 26 of these holes are still pending. Given this backlog of assays, the Company is [...]
Newrange Gold Corp. is pleased to report that the Company is in receipt of all necessary permits and has commenced road and drill site construction to drill test high-grade gold mineralization previously reported by the Company in the Good Hope Mine area of Pamlico Ridge. Gold-silver mineralization was sampled on and between several levels of the [...]
Newrange Gold Corp. is pleased to report that drilling has commenced in the Gold Box Canyon area of the Pamlico Project, Nevada. As announced September 21, 2020, drill hole P20-65 confirmed the presence of important gold mineralization over 4.6 m and 0.113 g/t Au over 22.9 m 600 m east of the Merritt Zone in the Gold Box Canyon area of the [...]
Newrange Gold Corp. is pleased to announce that hole P20-82 in the Merritt Zone of the Pamlico Project intersected near surface oxide gold mineralization averaging 14.85 grams gold per metric tonne and 3.57 grams silver per metric tonne over the 9.15 m interval from 53.35 to 62.50 m. This mineralized zone contained a high-grade core returning 34.11 [...]
Newrange Gold Corp. is providing an update on the reverse circulation drilling program at the Pamlico Gold Project in Nevada. During the Company's 2020 program, thirty-four holes have been drilled to date, for 3,462 meters, mostly along an 800-meter length of Pamlico Ridge between the area of the high-grade mineralization drilled in 2017 and the [...]
Newrange Gold Corp. is pleased to provide the first results from the ongoing reverse circulation drilling program at the Pamlico Gold Project in Nevada. Employees and the drill crew are successfully working under a strict COVID-19 protocol, both on and off site, to ensure the health and safety of all. Mineral County, in which Pamlico is situated [...]
Newrange Gold is pleased to announce that a drilling contractor is mobilizing to the Pamlico Gold Project in Nevada and drilling is scheduled to commence this Thursday. Road work and site preparation have been completed for the first holes and applications have been submitted to the BLM for permitting the balance of the program. Importantly, the [...]