Condor Gold is pleased to announce that the first phase of infill drilling of 39 drill holes for 3371.58 metres using diamond core drilling has been completed on the Mestiza Open Pit and all assay results received. The results of the infill drilling are consistent with previous drilling grades and widths, demonstrating good continuity in gold [...]
Condor Gold is pleased to announce that drilling has been completed and all assay results returned from exploration drilling at the Cacao Prospect. Fifteen drill holes for 3,500 m were completed to test the geological concept that the near surface gold mineralisation at Cacao is the top of a fully preserved epithermal gold system. Secondly to test [...]
Condor Gold plc is pleased to announce the appointment of Mr. Jair Diaz Navarro as a Senior Mining Engineer to work at its fully permitted La India Project, Nicaragua. Mr. Diaz is a mining engineer with over 10 years' experience in mine planning and operations. Mark Child, Chairman and CEO comments: "As Condor builds a team to take the La India [...]
Condor Gold is pleased to announce the key findings of a technical report on its 100% owned La India Gold Project prepared by SRK Consulting. This technical report presents the results of a strategic mining study to Preliminary Economic Assessment standards completed on the Project in 2021. The strategic study covers two scenarios: Scenario A, in [...]
Condor Gold plc is pleased to announce the appointment of Mr. John Seaberg as Chief Financial Officer with effect from 1 st September 2021. Mr. Seaberg is a seasoned executive with over 25 years' experience in the mining industry. Mark Child, Chairman and CEO comments: "I am delighted that Mr. Seaberg has joined Condor as Chief Financial Officer [...]
Condor Gold is pleased to announce that all assay results have now been received for the 3,370 m drilling programme in the La India starter pit infill and reserve circulation -replacement drill holes completed between December 2020 and June this year. The highlight new drill result is LIDC464 of 6.6 m true width at 10.51 g/t gold. The drilling [...]
Condor Gold plc presents its unaudited interim financial report together with Management's Discussion and Analysis for the three- and six-month periods to 30 June 2021. Both of the above have been posted on the Company's website and are also available on SEDAR. Highlights for the three and six months ended 30 June 2021 Mobilisation in January of a [...]
Condor Gold is pleased to announce assay results from a further twelve diamond core drill holes located between and along strike of the planned high-grade La India Starter Pits, which sit within the fully permitted La India Open Pit Mineral Reserve Estimate of 6.9Mt at 3.1 g/t gold for 675,000 oz gold. The Company is encouraged by higher than [...]
Condor Gold is pleased to announce that it has received the final assay results from the Southern Start Pit whereby all assay results have now been received for forty five diamond core drill holes for 2345.95 m in and just beneath the La India Starter Pits. The two planned high-grade Starter Pits , the Northern and Southern Starter Pits, have now [...]
Condor Gold is pleased to announce a significant drill intercept of 25.93m at 3.94g/t gold from 263.82m, including 4.58m at 7.76g/t gold from 282.12m drill depth in drill hole CCDC033 at the Cacao Prospect. This is the best drilling intercept returned to-date from the Cacao Prospect. This assay result supports the geological model that Cacao is a [...]
Condor Gold is pleased to announce it has selected Hanlon Engineering & Associates of Tucson, Arizona , a wholly owned subsidiary company of GR Engineering Services Limited as the Lead Engineer to develop a Feasibility Study level of design for a new processing plant around Condor's recently acquired new SAG Mill at La India Project, Nicaragua [...]
Condor Gold is pleased to announce that in line with it's intent to develop La India Mine into a production unit it has commenced a 1,700 metre infill geotechnical drilling programme within the permitted La India Open Pit. Two diamond drill rigs have been deployed to expedite progress. The programme is anticipated to take 5-6 weeks to complete. The [...]