Red Pine Exploration Inc., announced that the results of a ground gravity survey conducted in March 2019 confirm the extension of the Jubilee Stock - the host to the Company's Surluga deposit on the Wawa Gold Property. The Wawa gold project comprises a large, 6,519-hectare property located 2 kilometers outside of Wawa in the prolific gold mining [...]
Red Pine Exploration Inc. announces that a ground gravity survey, completed in March 2019, has confirmed the extension of the Jubilee Stock to the SW, where historic mapping previously defined its boundaries. The Jubilee Stock is host to the Surluga Deposit1, one of two deposits currently identified on the Wawa Gold Project. This extension opens [...]
Red Pine Exploration Inc. announces new drilling results from its delineation and exploration drilling in the Wawa Gold Corridor that includes the Surluga Deposit . The Surluga Deposit1 is one of two known resources, identified to date, on the large 6,519 hectares Wawa Gold Property, located near Wawa, Ontario. These latest results will be included [...]
Red Pine Exploration Inc. is pleased to announce the results of its annual and special meeting of Shareholders held today in Toronto, Ontario. At the meeting, all resolutions were passed with the required majority: The shareholders elected Drew Anwyll, Andrew Baumen, Robert Dodds, Peter Kampian, and Quentin Yarie as directors of the Company; The [...]
Red Pine Exploration Inc. announces new results from its delineation drilling of the Surluga Deposit . The Surluga Deposit1 is one of two known resources, identified to date, on the large 6,519 hectares Wawa Gold Property, located near Wawa, Ontario. These latest results will be included a revised NI 43-101 resource estimate for the Deposit [...]
Red Pine Exploration Inc. announces new results from its delineation drilling of the Surluga Deposit . The Surluga Deposit1 is one of two known resources, identified to date, on the large 6,519 hectares Wawa Gold Property, located near Wawa, Ontario. These latest results will be included a revised NI 43-101 resource estimate for the Deposit that is [...]
Red Pine Exploration Inc. announces new results from its exploration/infill drilling in the gaps in the Surluga Deposit , and from its confirmation drilling in the higher grade zones of the Deposit. The Surluga Deposit is one of two known deposits, identified to date, on the large 6,519 hectares Wawa Gold Project, located near Wawa, Ontario. The [...]
Red Pine Exploration Inc. announces that is has identified a new high-grade structure - the Cooper Structure, 1 km east of the northernmost extension of the Surluga Deposit and 2.8 km northeast of the Minto Mine South Deposit . Results from recent channel sampling in the Cooper Structure returned 27 g/t gold over 0.31 metres . Historic drilling [...]
Red Pine Exploration Inc. is pleased to announce that Mr. Drew Anwyll, M.Eng., P.Eng. has been appointed to Red Pine’s Board of Directors effective immediately. Mr. Anwyll is a mining engineer with over 25 years of international experience in operations start-up, construction and project management of both open pit and underground mines. Most [...]
Red Pine Exploration Inc. announces new results from: Figure 1. Plan map of drilling results confirmation drilling in the higher grade zones of the Surluga Deposit1 and from drilling on the Minto Mine South Project2. The Minto Mine South Deposit and the Surluga Deposit are just two of the known deposits on the large 5,568 hectares Wawa Gold Project [...]
Red Pine Exploration Inc. announces new results from its confirmation drilling in the higher-grade zones of the Surluga Deposit and from the drilling on the Minto Mine South Project. With the recent high-grade gold discoveries in the Jubilee Shear, including 5.28 g/t gold over 14.55 metres in SD-17-173 and 4.99 g/t gold over 17.6 metres in [...]
Red Pine Exploration Inc. confirms that it has filed on SEDAR the National Instrument 43-101 technical report in support of the initial Mineral Resource Estimate for the Minto Mine South Project, announced on November 15, 2018. The independent technical report has an effective date of December 31, 2018 and was prepared by Golder Associates Ltd [...]