- Channel sampling of the north and south faces of the vein system exposed in the cross cut has returned an average of 9.89 g/t Au, 46 g/t Ag and 2.44% Cu over a true width of 2.7 metres - K92 has commenced mining a 2,000 tonne bulk sample from the intercepted Kora Vein and expects to treat this material through the existing process plant at the [...]
VANCOUVER, BRITISH COLUMBIA--(Marketwired - Aug 18, 2017) - K92 Mining Inc. ("K92") (TSX VENTURE:KNT)(OTCQB:KNTNF) is pleased to announce it has completed the first 150 metres development of the Kora exploration drive and footwall drive designed to allow more efficient and effective diamond drilling of the projected Kora Vein system. The first [...]
VANCOUVER, BRITISH COLUMBIA--(Marketwired - Aug 10, 2017) - K92 Mining Inc. ("K92") (TSX VENTURE:KNT)(OTCQB:KNTNF) is pleased to report the appointment of Mr. John Lewins as Chief Executive Officer. Mr. Lewins is a Mineral Engineer with over 35 years of international leadership experience in the mining industry. He has held senior positions with [...]
VANCOUVER, BRITISH COLUMBIA--(Marketwired - Aug 3, 2017) - Stope production achieved from the Irumafimpa deposit 450 tonnes of gold copper concentrates shipped during July with another 250 tonnes of gold copper concentrates sent to port and available for shipment extensive program of diamond drilling to commence early August from underground set [...]
VANCOUVER, BRITISH COLUMBIA--(Marketwired - June 27, 2017) - THIS NEWS RELEASE IS INTENDED FOR DISTRIBUTION IN CANADA ONLY AND IS NOT AUTHORIZED FOR DISTRIBUTION TO UNITED STATES NEWSWIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES. K92 Mining Inc. ("K92" or the "Company") (TSX VENTURE:KNT) is pleased to announce that it has closed its [...]
VANCOUVER, BRITISH COLUMBIA--(Marketwired - Jun 19, 2017) - Intercepts include: 8.2m at 24.65 g/t AuEq plus 3.2m at 4.77 g/t AuEq in hole GCDD0074 4m at 60.57 g/t AuEq, including 1m at 77.99 g/t AuEq and 1m @ 95.30 g/t AuEq, plus 0.3m at 14.49 g/t AuEq in hole GCDD0071 *see Table 1 for full details on drill holes K92 Mining Inc. ("K92") (TSX [...]
TORONTO, ONTARIO--(Marketwired - June 6, 2017) - THIS NEWS RELEASE IS INTENDED FOR DISTRIBUTION IN CANADA ONLY AND IS NOT AUTHORIZED FOR DISTRIBUTION TO UNITED STATES NEWSWIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES. K92 Mining Inc. ("K92" or "KNT" or the "Company") (TSX VENTURE:KNT) is pleased to announce that it has entered into an [...]
VANCOUVER, BRITISH COLUMBIA--(Marketwired - May 29, 2017) - K92 Mining Inc. ("K92") (TSX VENTURE:KNT)(OTCQB:KNTNF) is pleased to announce the results of its Annual General Meeting of Shareholders ("AGM") held Wednesday, May 24, 2017 in Vancouver, Canada. Shareholders voted in favour of all items put forward by the Board of Directors and management [...]
VANCOUVER, BRITISH COLUMBIA--(Marketwired - May 24, 2017) - 5.4 metres at 11.68 g/t Au, 25.5 g/t Ag and 1.33% Cu including 0.75 metres at 71.94 g/t Au, 168.7 g/t Ag and 8.51% Cu intercepted in first completed exploration hole targeting extensions of the Kora Deposit Intersection reported is above the average grade and thickness for the Kora [...]
VANCOUVER, BRITISH COLUMBIA--(Marketwired - May 18, 2017) - Drilling of the first diamond drill hole from underground from a drill cuddy established off the Kora Drive has commenced The drill hole is currently over 160 metres in, with a designed final depth of 280 metres to end of hole Kora is a large and high grade deposit, open for expansion in [...]
VANCOUVER, BRITISH COLUMBIA--(Marketwired - May 17, 2017) - Intercepts include: 4.1m at 6.01 g/t AuEq plus 1m at 4.33 g/t AuEq in hole GCDD0038 3.2m at 29.6 g/t AuEq, including 0.6m at 130.94 g/t AuEq in hole GCDD0045 1.4m at 174.78 g/t AuEq, including 1m at 244.09 g/t AuEq, plus 3.2m at 6.88 g/t AuEq in hole GCDD0046 2.75m at 21.38 g/t AuEq [...]
VANCOUVER, BRITISH COLUMBIA--(Marketwired - May 16, 2017) - K92 Mining Inc. (TSX VENTURE:KNT)(OTCQB:KNTNF) is pleased to provide a production update on the Kainantu Gold Mine for the March Quarter of 2017. Total production of 23,400 tonnes mined, primarily from development of the 1205 mRL, 1220 mRL and 1235 mRL, a production rate significantly [...]