Altiplano Metals Inc. is pleased to report on the May 2022 operating results from the Farellon Copper-Gold mine located near La Serena, Chile. During the month of May, approximately 3,432 tonnes of mineralized copper-gold material was produced at Farellon and approximately 2,750 tonnes were shipped and processed. A slight improvement is noted in [...]
Altiplano Metals Inc. is pleased to report on the April 2022 operating results from the Farellon Copper-Gold mine located near La Serena, Chile. During the month of April, approximately 3,420 tonnes of mineralized copper-gold material was produced at Farellon and approximately 2,240 tonnes were shipped and processed. Production improved by 34% over [...]
Altiplano Metals Inc. is pleased to provide an update on decline progress and ongoing exploration activities at the Maria Luisa Project , located 100 km north of La Serena within the Atacama region in Incahuasi, Chile. Program Highlights The Company has completed 245 metres of the NW-SE trending Maria Luisa decline and is now approximately 90 [...]
Altiplano Metals Inc. is pleased to provide an update on ongoing surface reconnaissance work that has identified a large 3.5 x 1.5 km alteration corridor at the Pastillas Gold-Copper project , located within the prolific Maricunga Gold Belt in northern Chile's Atacama region . Figure 1: Aerial photograph of the Pastillas Alteration Corridor. To [...]
Altiplano Metals Inc. is pleased to report on the Q1 2022 results from the Farellon Copper-Gold-Iron mine located near La Serena, Chile. During Q1, 2022, the Company extracted a total 10,075 tonnes of mineralized Cu-Au material at Farellon and processed 6,676 tonnes at an average copper grade of approximately 1.99%. Sales of 281,949 pounds of [...]
Altiplano Metals Inc. is pleased to report on the ongoing construction activity at the El Peñón processing facility being built to support copper-gold-iron production from the Farellon mine located near La Serena, Chile. Highlights The first shipments of the stock-piled material from the Farellon Mine have begun, in anticipation of the completion [...]
Altiplano Metals Inc. is pleased to report on the February 2022 results from the Farellon Copper-Gold mine located near La Serena, Chile. Approximately 3,720 tonnes in total of mineralized copper-gold material was extracted at Farellon and 2,303 tonnes were processed during the month of February. This work represented a 4% improvement over the [...]
Altiplano Metals Inc. is pleased to provide an update on the exploration activities at the Company's newly optioned Pastillas gold exploration project , located within the prolific Maricunga Gold Belt in the Atacama region of northern Chile. Altiplano's geologists have arrived on site at Pastillas and the adjacent La Isla projects to conduct an [...]
Altiplano Metals Inc. is pleased to announce the commencement of a surface and underground delineation and exploration diamond drill program and provide a general activity update at its Maria Luisa project, located 100 km north of La Serena within the Atacama Region in Incahuasi, Chile. Highlights: The NE-SW trending Maria Luisa decline has [...]
Altiplano Metals Inc. is pleased to report on the January 2022 results from the Farellon Copper-Gold mine located near La Serena, Chile. During January 2022, a total of approximately 3,580 tonnes of mineralized copper-gold material was extracted at Farellon, and 2,221 tonnes were processed. This work represented an 11% improvement over the December [...]
Altiplano Metals Inc. is pleased to announce progress of the decline advance and underground channel sampling of a newly discovered vein system intersected within the Maria Luisa decline . The decline is currently being advanced parallel to projected gold-copper vein mineralization in a southeast direction towards historical underground workings in [...]
Altiplano Metals Inc. is pleased to report on the ongoing construction activity at the El Peñón processing facility being built to support copper-gold-iron production from the Farellon mine located near La Serena, Chile. Highlights Altiplano obtained permit approval to construct and install the copper-gold flotation, iron magnetic separation and a [...]