Maiden Resource Estimate Expected Shortly VANCOUVER, Sept. 21, 2018 /CNW/ - NRG Metals Inc. The Company is pleased to announce the completion of a second pumping well at the Hombre Muerto North Lithium Project, Salta, Argentina. The well, designated TWW18-02, was drilled to the target depth of 400 meters, and it is located immediately adjacent to [...]
HIGHLIGHTS NRG's second drill hole at the Hombre Muerto North project has been completed to a depth of 280.8 m, and the sample results demonstrate that excellent lithium values are present in the lower portion of the hole. Based on these encouraging results, as well as the excellent results from the pumping well located approximately 2.1 kilometers [...]
NRG Metals Inc. the Company is pleased to report pumping test results for the first 10 inch large-diameter pumping well at the Hombre Muerto North Lithium Project, Argentina. The well is located on the Tramo Claim portion of the project group. This pumping well was drilled immediately adjacent to the first exploration diamond core hole following [...]
- Initial sample results for the second core hole indicate excellent lithium values with very low Mg/Li ratios. The arithmetic average of three samples taken to a depth of 61.5 m is 719 mg/l lithium with a magnesium to lithium ratio ranging from 2.1 to 3.3 VANCOUVER, British Columbia, July 10, 2018 /CNW/ -- NRG Metals Inc. is pleased to report the [...]
VANCOUVER, British Columbia, June 29, 2018 /CNW/ -- HIGHLIGHTS Brine samples collected from 300 to 401 meters show high grade values very similar to the assays previously reported for the samples from surface to a depth of 300 m, with an arithmetic average 918 mg/l lithium and a low magnesium to lithium ratio. The arithmetic average lithium [...]
HIGHLIGHTS • Brine samples collected from 100 meters to 300 meters show high grade values very similar to the assays for the samples from surface to a depth of 100 meters, with an arithmetic average 888 mg/l Li and a low Mg to Li ratio. • The hole has been completed to a depth of 401 meters, and sample results from 300 to the bottom of [...]
Pumping test well drilled to 309 meters Target depth set at 400 meters Geology identical to adjacent core hole. VANCOUVER, May 25, 2018 /CNW/ - NRG Metals Inc. the Company is pleased to report that the drilling of a pump test well at the Hombre Muerto North Lithium Project is progressing on schedule. The rotary hole, which is located 15 meters [...]
Highlights Brine samples collected over the first 100 meters average 905 mg/l Li with a low Mg to Li ratio. The hole is now at 300.5 meters in clastic sediments, and brine samples are currently being collected from 300 to 100 meters. Drilling will resume after the sampling is completed. Adjacent rotary drill hole for pump testing is at a depth of [...]
HIGHLIGHTS Core hole now at 222.5 meters in clastic sediments 10 brine samples to ALS Laboratories from first hole Second rotary drill rig added and at 153 meters Second hole to serve for pump testing VANCOUVER, British Columbia, May 14, 2018 /CNW/ -- NRG Metals Inc. the Company is pleased to report that it has mobilized a rotary drill to the [...]
VANCOUVER, British Columbia, May 8, 2018 /CNW/ -- NRG Metals Inc. is pleased to report that drilling at the Salar Escondido Lithium Project has progressed ahead of schedule, and an 8.5 inch rotary hole has been completed to the target depth of 400 meters. The hole will now be reamed to a diameter of 12.25 inches so that perforated casing can be [...]
VANCOUVER, British Columbia, May 3, 2018 /CNW/ -- NRG Metals Inc. the Company is pleased to report that drilling at the Salar Hombre Muerto North lithium project is underway and progressing as planned. The first diamond core hole has been advanced to a depth of 105 meters with a target depth of up to 350 meters. The geological profile observed so [...]
VANCOUVER, April 19, 2018 /CNW/ - NRG Metals Inc. is pleased to announce that drilling on a second test well is progressing at the Salar Escondido Lithium Project, comprised of 29,180 hectares , and located in Catamarca Province, Argentina. A rotary drill operated by drilling contractor Water Drilling had completed 87 meters as of Tuesday, April [...]