Osino Resources Corp. is pleased to announce that it has filed a new technical report entitled, "Twin Hills Gold Project, Namibia, NI 43-101 Technical Report" dated effective April 1, 2022 for its increased mineral resource announced in the Company's news release dated April 13, 2022. The 2022 Technical Report was prepared and filed in accordance [...]
Highlights Specialist technical studies towards the Twin Hills Pre-Feasibility Study being completed, based on a simple flowsheet of 3-stage crushing, gravity separation and carbon-in-leach Extensive met testwork, trade-off analyses, detailed cost estimation and surface infrastructure design underway or nearing completion Significant progress made [...]
Highlights 65.0 million tonnes at an average grade of 1.00 g/t Au for a total of 2.1 million ounces of gold in the Indicated mineral resource category. 20.7 Mt at an average grade of 0.93 g/t Au for a total of 0.62 Moz of gold in the Inferred mineral resource category. The mineral resource is reported within a conceptual pit shell using a gold [...]
Highlights Step-out drilling at Twin Hills Central north margin intercepts widest and highest-grade shoot drilled at Twin Hills to-date: OKD355 - 69m @ 2.06g/t incl. 34m @ 3.65g/t , 6m @ 1.18g/t and 21m @ 1.10g/t High-grade shoot is characterized by overprint of extensional quartz sulphide veinlets indicating a second phase of mineralization in [...]
Osino Resources Corp. is pleased to announce that it has received $9,107,455 from the exercise of 8,941,047 previously issued warrants. The funds received will be used to continue to fast-track the development of its flagship Twin Hills Gold Project, to progress other Namibian exploration and project development initiatives as well as for general [...]
Osino Resources Corp. is pleased to announce that it has entered into an agreement to acquire the Ondundu gold exploration property in Namibia from B2Gold Corp. dated December 31, 2021 . Under the terms of the Acquisition Agreement, Osino agreed to purchase all of the issued and outstanding shares of the Namibian company, Razorback Gold Mining [...]
Highlights Fourth phase metallurgical test work underway to define the plant design for final optimisation tests in the new year Detailed tailings storage facility study underway to produce a design in line with global best practise Offer letter from Namibian parastatal power utility to supply mine with grid power accepted by Osino and power supply [...]
Highlights 116,000m of drilling year-to-date comprising 71,000m of infill & step-outs, 30,000m of brownfields, 6,000m of green-fields and 9,000m of feasibility drilling . Bulge and Twin Hills Central continue to produce very wide intercepts with higher grade intervals controlled by northeast plunging shoots including: OKD262 - 153m @ 1.01g/t incl [...]
Highlights Diamond and reverse circulation drilling at Twin Hills West delineates significant new gold discovery 3km west of existing mineral resource at Bulge and Twin Hills Central . Gold mineralization confirmed in three new zones over >1,000m strike length. 54 diamond and reverse circulation holes for 10,472m completed at THW since March 2021 [...]
Osino Resources Corp. hereby notifies that it has filed an amended and restated preliminary economic assessment for Osino's Twin Hills Gold Project, entitled "Amended and Restated Twin Hills Gold Project, Namibia, Preliminary Economic Assessment, National Instrument 43-101 Technical Report" having an effective date of July 14, 2021. The Amended and [...]