Suche
 
Folgen Sie uns auf:

Volta confirms and extends gold mineralization in the north of its proposed open pit area at its Kiaka Gold Project in Burkina Faso

29.11.2011  |  CNW

- Intersects 213.0m @ 1.38g/t gold, including 6.0m @ 11.27g/t gold -

TSX: VTR

TORONTO, Nov. 29, 2011 /CNW/ - Volta Resources Inc. ('Volta' or the 'Company')

announces the drill results from 4 holes from Phase 3 of the on-going program at its Kiaka Gold Project in Burkina Faso. Phase 3 comprises approximately 50,000m of drilling being undertaken to extend resources in the Central Area, to follow up positive results in the South Area, to test several more ground geophysical targets and undertake scout drilling on regional targets on the Kiaka property (see News Release of 13 October 2011).

Results have been received to date for 4 holes, located on 2 sections, respectively 5750N (Figure 2) and 5800N (figure 3). The 4 holes, comprising a total of 2,104.5m, confirm the continuity of wide mineralization, typical of the Kiaka Main Zone (KMZ) deposit.  Significantly, the drilling confirms that the well mineralized, and wide, KMZ zone persists beneath a shallow southeasterly dipping fault down to a vertical depth exceeding 400m. These holes should also result in the conversion of a significant portion of the current Inferred Resources to the Indicated Category in this area. The mineralization remains open towards the northeast and is currently being tested by the on-going drilling program.

The highlights from current drilling on these sections include:


-- KDH299 : 136.0m @ 1.04g/t gold, including 12.0m @ 2.27g/t gold
-- KDH300 : 213.0m @ 1.38g/t gold, including 6.0m @ 11.21g/t gold
AND 6.0m @ 2.51g/t gold
-- KDH301 : 11.3m @ 3.32g/t gold
-- KDH301 : 97.0m @ 0.63g/t gold, including 4.0m @ 1.17g/t gold
-- KDH301 : 57.0m @ 0.78g/t gold, including 21.0m @ 1.21g/t gold
-- KDH302 : 229.0m @ 0.83g/t gold, including 13.0m @ 1.47g/t gold
AND 25.0m @ 1.42g/t gold

Kevin Bullock, Volta's CEO, said, 'These outstanding results will be incorporated into our next resource estimate and should have a positive impact on the quality of resources and the total amount of resources.  These results again display the characteristic exceptional consistency of the Kiaka deposit with broad widths of notable mineralization.  We are also pleased that these results will be incorporated into the parameters of our Pre-Feasibility study, which will be concluded late in Q1/12.'

Results for the holes are highlighted in Table 1 and in locations shown in Figure 1.  Analyses of the Volta samples were undertaken by fire assay on a 50g charge at ALS Chemex Laboratories in Ouagadougou. Volta's sampling and assay procedures included rigorous QA/QC elements that employed the inclusion of certified standards and blanks.

Table 1: Highlights of gold intersections for the reported boreholes


_____________________________________________________________________
|HOLE ID |FROM |TO |INTERVAL|GRADE|COMMENTS |
|________|________|____________|________|_____|_______________________|
|KDH299 | 206.00| 219.00| 13.00| 0.52| |
|________|________|____________|________|_____|_______________________|
|AND | 257.30| 274.00| 16.70| 0.51| |
|________|________|____________|________|_____|_______________________|
|AND | 286.80| 296.00| 9.20| 0.54| |
|________|________|____________|________|_____|_______________________|
|AND | 321.80| 328.70| 6.90| 0.88| |
|________|________|____________|________|_____|_______________________|
|AND | 400.00| 536.00| 136.00| 1.04| |
|________|________|____________|________|_____|_______________________|
| INCL| 427.00| 459.00| 32.00| 1.39| |
|________|________|____________|________|_____|_______________________|
| INCL| 462.00| 471.00| 9.00| 1.84| |
|________|________|____________|________|_____|_______________________|
| INCL| 477.00| 486.00| 9.00| 1.30| |
|________|________|____________|________|_____|_______________________|
| INCL| 494.00| 506.00| 12.00| 2.27| |
|________|________|____________|________|_____|_______________________|
|KDH300 | 128.80| 132.00| 3.20| 1.60| |
|________|________|____________|________|_____|_______________________|
|AND | 157.00| 171.00| 14.00| 0.64| |
|________|________|____________|________|_____|_______________________|
| INCL| 159.00| 163.65| 4.65| 1.27| |
|________|________|____________|________|_____|_______________________|
|AND | 329.00| 542.00| 213.00| 1.38|395.0-396.0m = 59.1g/t |
| | | | | |Au; 452.0-452.85m |
| | | | | |= 11.73g/t Au; |
| | | | | |484.0-485.0m = 13.65g/t|
| | | | | |Au |
|________|________|____________|________|_____|_______________________|
| INCL| 363.00| 367.00| 4.00| 2.49| |
|________|________|____________|________|_____|_______________________|
| INCL| 379.00| 391.00| 12.00| 1.29| |
|________|________|____________|________|_____|_______________________|
| INCL| 394.00| 400.00| 6.00|11.21| |
|________|________|____________|________|_____|_______________________|
| INCL| 403.00| 409.00| 6.00| 2.51| |
|________|________|____________|________|_____|_______________________|
| INCL| 443.00| 461.65| 18.65| 1.67| |
|________|________|____________|________|_____|_______________________|
| INCL| 466.50| 501.00| 34.50| 2.09| |
|________|________|____________|________|_____|_______________________|
|KDH301 | 18.00| 29.30| 11.30| 3.32|19.0-20.1 = 28.05g/t Au|
|________|________|____________|________|_____|_______________________|
|AND | 43.80| 58.00| 14.20| 1.08| |
|________|________|____________|________|_____|_______________________|
| INCL| 44.60| 47.00| 2.40| 3.27| |
|________|________|____________|________|_____|_______________________|
|AND | 246.00| 343.00| 97.00| 0.63| |
|________|________|____________|________|_____|_______________________|
| INCL| 278.00| 282.00| 4.00| 1.02| |
|________|________|____________|________|_____|_______________________|
| INCL| 306.00| 310.00| 4.00| 1.17| |
|________|________|____________|________|_____|_______________________|
| INCL| 332.00| 335.00| 3.00| 1.13| |
|________|________|____________|________|_____|_______________________|
|AND | 348.75| 407.00| 58.25| 0.84| |
|________|________|____________|________|_____|_______________________|
| INCL| 375.00| 397.45| 22.45| 1.16| |
|________|________|____________|________|_____|_______________________|
| INCL| 400.00| 404.90| 4.90| 1.41| |
|________|________|____________|________|_____|_______________________|
|AND | 414.00| 471.00| 57.00| 0.78| |
|________|________|____________|________|_____|_______________________|
| INCL| 421.00| 442.00| 21.00| 1.21| |
|________|________|____________|________|_____|_______________________|
|AND | 480.00| 500.00| 20.00| 0.42| |
|________|________|____________|________|_____|_______________________|
|KDH302 | 238.00| 467.00| 229.00| 0.83| |
|________|________|____________|________|_____|_______________________|
| INCL| 262.00| 273.00| 11.00| 1.23| |
|________|________|____________|________|_____|_______________________|
| INCL| 298.00| 301.00| 3.00| 1.59| |
|________|________|____________|________|_____|_______________________|
| INCL| 315.00| 333.00| 18.00| 1.20| |
|________|________|____________|________|_____|_______________________|
| INCL| 349.00| 354.00| 5.00| 1.19| |
|________|________|____________|________|_____|_______________________|
| INCL| 357.00| 370.00| 13.00| 1.47| |
|________|________|____________|________|_____|_______________________|
| INCL| 373.00| 398.00| 25.00| 1.42| |
|________|________|____________|________|_____|_______________________|
| INCL| 407.00| 429.00| 22.00| 1.20| |
|________|________|____________|________|_____|_______________________|
| INCL| 437.00| 440.00| 3.00| 1.28| |
|________|________|____________|________|_____|_______________________|
|AND | 474.00| 502.20| 28.20| 0.54|ENDED IN MINERALIZATION|
|________|________|____________|________|_____|_______________________|


Notes on Table 1:

1) Intervals are core length. True width is unknown at this time.

2) Intersections are based on a 0.3 g/t gold cut-off with maximum internal dilution (MID) of 5m for the lower grade mineralization envelop, except for hole KDH302 (238.0-467.0m intercept) where it has been increased to 6m.

3) In order to highlight the continuity of the high grade zone, a 0.8 g/t gold cut-off with maximum internal dilution of 2m has been used.

4) No top cut has been applied.

5) The intersections listed in the table represent sections of at least 3m in excess of 1g/t Au and/or sections of at least 10m in excess of 0.5g/t Au.

6) The intersections represent sections drilled cored drilling (see Table 2).

7) The drill core was sampled at one meter intervals and cut in half using a diamond saw. Half-core is archived at the core storage facility on site while the other half was sent to the laboratory.

8) Samples were sent to ALS Chemex in Ouagadougou for standard preparation followed by Fire Assay on a 50g charge.

9) Certified standards were inserted every 15 samples, field duplicates (in the RC portions) about every 20 and blanks about every 30 samples. The blanks, certified standards and duplicate assays confirm that all assays used to compile the intersections quoted here have passed Volta's rigorous QA/QC checks.

TABLE 2: Collar coordinates and orientation parameters for the reported boreholes


________________________________________________________________________
| | Hole | | | | | | |
|SECTION| ID |Easting|Northing|Elevation| Depth | Dip | Azimuth |
|_______|______|_______|________|_________|__________|_________|_________|
| | | | | (m) | (m) |(degrees)|(degrees)|
|_______|______|_______|________|_________|__________|_________|_________|
| 5750 |KDH299|739438 |1289888 | 270| 550.00| -60| 135|
|_______|______|_______|________|_________|__________|_________|_________|
| 5750 |KDH301|739491 |1289835 | 270| 502.12| -60| 135|
|_______|______|_______|________|_________|__________|_________|_________|
| 5800 |KDH300|739474 |1289923 | 270| 550.18| -60| 135|
|_______|______|_______|________|_________|__________|_________|_________|
| 5800 |KDH302|739527 |1289870 | 270| 502.20| -60| 135|
|_______|______|_______|________|_________|__________|_________|_________|


Under the guidelines of National Instrument 43-101, the qualified person for the Kiaka Gold Project is Mr. Guy Franceschi, Vice President, Exploration for Volta. Mr. Franceschi is a member of the European Federation of Geologists and has reviewed and approved the contents of this news release.

Volta is a mineral exploration company primarily focused on becoming a leader in the identification, acquisition and exploration of gold properties in West Africa. The Company is currently fast-tracking its flagship Kiaka Gold Project, located in Burkina Faso, toward a development decision.

Forward Looking Information Caution:

This press release presents 'forward-looking statements' within the meaning of Canadian securities legislation that involve inherent risks and uncertainties.  Forward-looking statements include, but are not limited to, statements with respect to the future price of gold and other minerals and metals, the estimation of mineral reserves and resources, the realization of mineral reserve estimates, the capital expenditures, costs and timing of the resources, the realization of mineral reserve estimates, the capital expenditures, costs and timing of the development of new deposits, success of exploration activities, permitting time lines, currency exchange rate fluctuations, requirements for additional capital, government regulation of mining operations, environmental risks, unanticipated reclamation expenses, title disputes or claims and limitations on insurance coverage.  Generally, these forward-looking statements can be identified by the use of forward looking terminology such as 'plans', 'expects' or 'does not expect', 'is expected', 'budget', 'scheduled', 'estimates', 'forecasts', 'intends', 'anticipates' or 'does not anticipate', or 'believes', or variations of such words and phrases or state that certain actions, events or results 'may', 'could', 'would', 'might' or 'will be taken', 'occur' or 'be achieved'. Forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of Volta to be materially different from those expressed or implied by such forward looking statements, including but not limited to: risks related to international operations, risks related to the integration of acquisitions; risks related to joint venture operations; actual results of current exploration activities; actual results of current or future reclamation activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; future prices of gold and other minerals and metals; possible variations in ore reserves, grade or recovery rates; failure of equipment or processes to operate as anticipated; accidents, labour disputes and other risks of the mining industry; and delays in obtaining governmental approvals or financing or in the completion of development or construction activities.  Although the management and officers of Volta believe that the expectations reflected in such forward-looking statements are based upon reasonable assumptions and have attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements.  Volta Resources does not undertake to update any forward-looking statements that are incorporated by reference herein, except in accordance with applicable securities laws.   

SOURCE Volta Resources Inc.

PDF with caption: 'Figure 1 Kiaka Central Area, Location of holes.pdf'. PDF available at: http://stream1.newswire.ca/media/2011/11/29/20111129_C2111_DOC_EN_7575.pdf

PDF with caption: 'Figure 2 Section 5750N.pdf'. PDF available at: http://stream1.newswire.ca/media/2011/11/29/20111129_C2111_DOC_EN_7576.pdf

PDF with caption: 'Figure 3 Section 5800N.pdf'. PDF available at: http://stream1.newswire.ca/media/2011/11/29/20111129_C2111_DOC_EN_7577.pdf

Volta Resources Inc.

CONTACT: Please refer to our website www.voltaresources.com or contact:





Kevin Bullock, P.Eng., President & Andreas Curkovic, Investor

CEO Relations



Tel: (647) 388-1842 or Tel: (416) 577-9927



Fax: (416) 867-2298



Email: kbullock@voltaresources.com









Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!




Mineninfo
Volta Resources Inc.
Bergbau
-
-
Minenprofile
Alle Angaben ohne Gewähr! Copyright © by GoldSeiten.de 1999-2024.
Die Reproduktion, Modifikation oder Verwendung der Inhalte ganz oder teilweise ohne schriftliche Genehmigung ist untersagt!

"Wir weisen Sie ausdrücklich auf unser virtuelles Hausrecht hin!"