VANCOUVER, 08/02/12 - Rockgate Capital Corp. (TSX: RGT) (the "Company") is pleased to announce assay results from infill diamond drilling completed along strike of the southeast-trending Plateau Edge Structure ("PES"). The PES is a major mineralized structural zone within the North Zone at Rockgate's 100% owned Falea Project hosting high-grade uranium-silver-copper mineralization. This first half of the 2012 diamond drilling program builds upon the January 2012 mineral resource estimate, focussing on developing Measured and Indicated ("M & I") mineral resources. An update of mineral resources is planned for later this fall.
Highlights:
- 22 DDH's extend high-grade mineralization on-strike to the southeast (PES SE-Extension) and east to fill gap between North Zone and new Northeast Plateau.
- Infill drilling was highly successful in increasing the number of thick intersections (greater than 4 metres) of uranium and silver-rich mineralization along strike to the southeast of PES.
- 4 drills continue to extend mineralization from the southern boundary of the North Zone, expand Bodi Area mineralization, and step-out on Central Zone.
- Thus far in 2012, 400 diamond drill holes totalling over 88,000 metres have been completed.
Table 1 Drill Highlights - PES SE-Extension
----------------------------------------------------------------------------
Ag
Hole Name From (m) To (m) Length (m) U3O8% XRF (g/tonne) Cu %
----------------------------------------------------------------------------
DF-500 207.5 217.0 9.5 0.19 83.6 0.24
----------------------------------------------------------------------------
DF-513 198.6 206.0 7.4 0.09 122.0 0.16
----------------------------------------------------------------------------
DF-543 195.3 202.7 7.4 0.09 76.1 0.09
----------------------------------------------------------------------------
DF-567 193.4 202.7 8.3 0.15 258.6 0.11
----------------------------------------------------------------------------
All reported intervals are true widths.
The PES SE-Extension infill drill program was designed to:
- Build Measured and Indicated ("M & I") mineral resources by expanding areas of thick, high-grade uranium mineralization.
- Add value by expanding high-grade silver mineralization.
- Fill gaps between PES, eastern parts of the North Zone, and the new Northeast Plateau zone.
PES SE Extension
Several drill holes from previous campaigns indicated the potential for additional thick, high-grade mineralization to the southeast, along strike with the PES. Thus, between December 2011 and February 2012, a series of holes were drilled southeast and east of the PES. Drilling was completed to an average drill-spacing of 50-metres, thus firming up the resource model in the southeastern part of the North Zone.
Results from this phase of drilling (see Table 2) show that while uranium and silver grades are largely similar to those typically encountered in the PES and thicknesses are very good. Several holes, notably DF-500 (0.19% U3O8, 83.6 g/t Ag, and 0.24% Cu over 9.5m) and DF-502 (0.07% U3O8, 95.7 g/t Ag, and 0.17% Cu over 6.5m), are located 300 to 350 metres southeast of the PES, indicating that PES-style mineralization, i.e. thick and high grade, remains open to the southeast. Nine additional diamond drill holes have been completed on two sections in an attempt to extend this trend further to the southeast.
Drilling south of PES, particularly DF-513 (0.09% U3O8, 122.0 g/t Ag, and 0.16% Cu over 7.4m) and DF-515 (0.15% U3O8, 153.0 g/t Ag, and 0.01% Cu over 1.0m), suggested that high-grade mineralization may extend further south and southwest into an area of limited drilling. Results from diamond drilling on those mineralized trends are expected soon.
Table 2PES SE Extension Results
2012 Diamond Drill Program
Rockgate's 2012 drill program, 4 diamond drills exploring several areas outside the current resource boundary, has been suspended as of August 1st due to the onset of intense seasonal rains. Step-out drilling was focused in 3 main areas:
1. Bodi Area - to confirm and expand near-surface mineralization north of the Falea plateau with the aim of identifying potential open pit resources and access to underground at North Zone.
2. North Zone South Block - to extend high-grade mineralization into a 400 metre x 500 metre block immediately south of the North Zone and east of the Road Fault. Two fences of 9 holes further east on the PES SE Extension are also underway.
3. Central Zone - to extend mineralization to the east, northeast, and southeast.
Christopher J. Wild, P.Eng., Project Manager for Falea, is the Qualified Person for the Company under NI 43-101. All core samples are cut in half on site and sent to ALS-Chemex in Bamako for direct shipment to ALS-Chemex in Johannesburg, South Africa, for ICP-MS and XRF analysis. The company inserts a standard, blank and requests a duplicate sample be run in every batch of 20 samples. In addition, the lab inserts in-house blanks, standards, and duplicates with each shipment. Data that falls outside the control limits are checked and repeated as necessary.
HQ-size core (63.5 mm diameter) was drilled in the PES SE Extension. Mineralized core was sawn in half and one half sawn into quarters. One quarter core was sent for assay, quarter retained as a permanent record, and half core was collected for pilot plant-scale metallurgical test work
For more information please visit our website at www.rockgatecapital.com
To view a Drill Hole Location Plan Map, please visit the following link:
http://media3.marketwire.com/docs/rgt731i.pdf
ON BEHALF OF THE BOARD OF DIRECTORS OF ROCKGATE CAPITAL CORP.
Karl Kottmeier
President
Neither Toronto Stock Exchange nor its Regulation Services Provider (as that term is defined in the policies of the Exchange) accepts responsibility for the adequacy or accuracy of this release.
Contacts:
Rockgate Capital Corp.
Karl Kottmeier, President
(604) 678 8941
(604) 689 7442 (FAX)
Rockgate Capital Corp.
Kirk Gamley, VP Corporate Development
(604) 678 8941
(604) 689 7442 (FAX)
www.rockgatecapital.com
Highlights:
- 22 DDH's extend high-grade mineralization on-strike to the southeast (PES SE-Extension) and east to fill gap between North Zone and new Northeast Plateau.
- Infill drilling was highly successful in increasing the number of thick intersections (greater than 4 metres) of uranium and silver-rich mineralization along strike to the southeast of PES.
- 4 drills continue to extend mineralization from the southern boundary of the North Zone, expand Bodi Area mineralization, and step-out on Central Zone.
- Thus far in 2012, 400 diamond drill holes totalling over 88,000 metres have been completed.
Table 1 Drill Highlights - PES SE-Extension
----------------------------------------------------------------------------
Ag
Hole Name From (m) To (m) Length (m) U3O8% XRF (g/tonne) Cu %
----------------------------------------------------------------------------
DF-500 207.5 217.0 9.5 0.19 83.6 0.24
----------------------------------------------------------------------------
DF-513 198.6 206.0 7.4 0.09 122.0 0.16
----------------------------------------------------------------------------
DF-543 195.3 202.7 7.4 0.09 76.1 0.09
----------------------------------------------------------------------------
DF-567 193.4 202.7 8.3 0.15 258.6 0.11
----------------------------------------------------------------------------
All reported intervals are true widths.
The PES SE-Extension infill drill program was designed to:
- Build Measured and Indicated ("M & I") mineral resources by expanding areas of thick, high-grade uranium mineralization.
- Add value by expanding high-grade silver mineralization.
- Fill gaps between PES, eastern parts of the North Zone, and the new Northeast Plateau zone.
PES SE Extension
Several drill holes from previous campaigns indicated the potential for additional thick, high-grade mineralization to the southeast, along strike with the PES. Thus, between December 2011 and February 2012, a series of holes were drilled southeast and east of the PES. Drilling was completed to an average drill-spacing of 50-metres, thus firming up the resource model in the southeastern part of the North Zone.
Results from this phase of drilling (see Table 2) show that while uranium and silver grades are largely similar to those typically encountered in the PES and thicknesses are very good. Several holes, notably DF-500 (0.19% U3O8, 83.6 g/t Ag, and 0.24% Cu over 9.5m) and DF-502 (0.07% U3O8, 95.7 g/t Ag, and 0.17% Cu over 6.5m), are located 300 to 350 metres southeast of the PES, indicating that PES-style mineralization, i.e. thick and high grade, remains open to the southeast. Nine additional diamond drill holes have been completed on two sections in an attempt to extend this trend further to the southeast.
Drilling south of PES, particularly DF-513 (0.09% U3O8, 122.0 g/t Ag, and 0.16% Cu over 7.4m) and DF-515 (0.15% U3O8, 153.0 g/t Ag, and 0.01% Cu over 1.0m), suggested that high-grade mineralization may extend further south and southwest into an area of limited drilling. Results from diamond drilling on those mineralized trends are expected soon.
Table 2PES SE Extension Results
----------------------------------------------------------------------------
Ag
Hole Name From (m) To (m) Length (m) U3O8% XRF (g/tonne) Cu %
----------------------------------------------------------------------------
DF-495 206.4 207.7 1.3 0.066 60.0 0.04
----------------------------------------------------------------------------
DF-497 209.4 210.8 1.4 0.082 50.7 0.01
----------------------------------------------------------------------------
DF-500 207.5 217.0 9.5 0.188 83.6 0.24
----------------------------------------------------------------------------
DF-502 212.3 218.8 6.5 0.074 95.7 0.17
----------------------------------------------------------------------------
incl 213.3 214.2 0.9 0.276 498.0 0.26
----------------------------------------------------------------------------
DF-505 201.5 204.1 2.6 0.160 9.5 0.14
----------------------------------------------------------------------------
DF-507 209.9 211.4 1.5 0.020 33.7 1.92
----------------------------------------------------------------------------
DF-510 200.0 200.7 0.7 0.054 10.6 0.26
----------------------------------------------------------------------------
and 207.5 208.0 0.5 0.066 20.0 0.14
----------------------------------------------------------------------------
DF-513 198.6 206.0 7.4 0.090 122.0 0.16
----------------------------------------------------------------------------
incl 204.8 206.0 1.2 0.500 657.0 0.73
----------------------------------------------------------------------------
DF-515 201.1 202.6 1.5 0.110 125.0 0.01
----------------------------------------------------------------------------
DF-526 195.5 203.7 8.2 0.026 118.0 0.10
----------------------------------------------------------------------------
incl 196.6 200.2 3.6 0.045 136.8 0.07
----------------------------------------------------------------------------
DF-529 202.2 203.8 1.6 0.220 35.9 0.16
----------------------------------------------------------------------------
DF-531 192.3 201.7 9.4 0.043 30.1 0.12
----------------------------------------------------------------------------
DF-533 199.6 200.4 0.8 0.181 944.0 0.17
----------------------------------------------------------------------------
DF-539 193.1 196.6 3.5 0.023 59.7 0.01
----------------------------------------------------------------------------
DF-543 195.3 202.7 7.4 0.090 76.1 0.09
----------------------------------------------------------------------------
incl 196.9 197.6 0.7 0.480 239.0 0.05
----------------------------------------------------------------------------
DF-546 198.4 203.4 5.0 0.041 76.1 0.10
----------------------------------------------------------------------------
DF-551 190.0 190.5 0.5 0.030 13.7 0.41
----------------------------------------------------------------------------
DF-553 192.9 196.7 3.8 0.030 35.7 0.02
----------------------------------------------------------------------------
DF-556 192.0 196.2 4.2 0.033 50.6 0.01
----------------------------------------------------------------------------
incl 195.5 196.2 0.7 0.120 276.0 0.03
----------------------------------------------------------------------------
DF-561 194.9 196.4 1.5 0.875 126.8 0.21
----------------------------------------------------------------------------
DF-567 193.4 202.7 8.3 0.150 258.6 0.11
----------------------------------------------------------------------------
2012 Diamond Drill Program
Rockgate's 2012 drill program, 4 diamond drills exploring several areas outside the current resource boundary, has been suspended as of August 1st due to the onset of intense seasonal rains. Step-out drilling was focused in 3 main areas:
1. Bodi Area - to confirm and expand near-surface mineralization north of the Falea plateau with the aim of identifying potential open pit resources and access to underground at North Zone.
2. North Zone South Block - to extend high-grade mineralization into a 400 metre x 500 metre block immediately south of the North Zone and east of the Road Fault. Two fences of 9 holes further east on the PES SE Extension are also underway.
3. Central Zone - to extend mineralization to the east, northeast, and southeast.
Christopher J. Wild, P.Eng., Project Manager for Falea, is the Qualified Person for the Company under NI 43-101. All core samples are cut in half on site and sent to ALS-Chemex in Bamako for direct shipment to ALS-Chemex in Johannesburg, South Africa, for ICP-MS and XRF analysis. The company inserts a standard, blank and requests a duplicate sample be run in every batch of 20 samples. In addition, the lab inserts in-house blanks, standards, and duplicates with each shipment. Data that falls outside the control limits are checked and repeated as necessary.
HQ-size core (63.5 mm diameter) was drilled in the PES SE Extension. Mineralized core was sawn in half and one half sawn into quarters. One quarter core was sent for assay, quarter retained as a permanent record, and half core was collected for pilot plant-scale metallurgical test work
For more information please visit our website at www.rockgatecapital.com
To view a Drill Hole Location Plan Map, please visit the following link:
http://media3.marketwire.com/docs/rgt731i.pdf
ON BEHALF OF THE BOARD OF DIRECTORS OF ROCKGATE CAPITAL CORP.
Karl Kottmeier
President
Neither Toronto Stock Exchange nor its Regulation Services Provider (as that term is defined in the policies of the Exchange) accepts responsibility for the adequacy or accuracy of this release.
Contacts:
Rockgate Capital Corp.
Karl Kottmeier, President
(604) 678 8941
(604) 689 7442 (FAX)
Rockgate Capital Corp.
Kirk Gamley, VP Corporate Development
(604) 678 8941
(604) 689 7442 (FAX)
www.rockgatecapital.com