Suche
 
Folgen Sie uns auf:

Volta Resources intersects 126.0m at 1.90g/t gold (uncut) at its Kiaka Gold Project in Burkina Faso and confirms strike and depth extent towards the north

24.10.2012  |  CNW

- also 81.80 meters at 1.48g/t gold, including 7.0 meters at 10.15g/t gold -
- 249.55 meters at  0.86g/t gold, including 16.90 meters at 2.32g/t gold -

TSX: VTR

TORONTO, Oct. 24, 2012 /CNW/ - Volta Resources Inc. ("Volta Resources" or the "Company") (TSX: VTR) announces additional results from the ongoing 2012 drilling program (Phase 4) on the Central Area at its Kiaka Gold Project in Burkina Faso. The Phase 4 program is focused principally on infill drilling those areas where Inferred category resources occur within the open pit shell defined in the pre-feasibility study ("PFS", see News Release of 3 May 2012). The aim is to enhance a portion of these Inferred Resources into the Indicated category, thereby allowing them to be converted to Mineral Reserves so that they report to ore and not waste. This +30,000m drilling program is also testing the area between the Kiaka Central Area and the Kiaka South Area. Shallow RC drilling has also been undertaken adjacent to identified mineralization to cover the full extent of the proposed PFS pit.

In the Kiaka Central Area, Volta Resources has already defined NI 43-101 compliant resources including 117.42 million tonnes @ 1.07 g/t Au for 4,029,000 ounces in the Measured and Indicated categories and 29.96 million tonnes @ 1.00 g/t Au for 1,000,000 ounces in the Inferred category (see News Release of March 21, 2012) which include Proven and Probable Mineral Reserves of 126.08 million tonnes at a diluted grade of 0.96 g/t Au for 3.89 million ounces of gold within a single open pit (see News Release of May 3, 2012). In addition, Volta Resources has recently announced a maiden NI 43-101 compliant Mineral Resource estimate for the Kiaka South deposit, located some 700m southwest of the Company's Kiaka Central Area. The estimate includes 1.84 million tonnes @ 2.0 g/t Au for 118,000 ounces in the Measured and Indicated categories (see News Release of September 27, 2012).

The current press release includes the results from 110 drill holes located in the northern half of the Kiaka Central Area (see Figure 1), between Section 5650N and Section 6500N as well as one hole located in the southern part of the prospect. These holes, totaling 16,434m of drilling, comprise respectively 32 core holes (11,632m) and 79 reverse circulation holes (4,802m). The results confirm the extension of the gold mineralization at depth and along strike in the Kiaka Central Area. They show that gold mineralization can be continuously traced to over 350m vertical depth in the northernmost part of the area (sections 6100N and 6200N). Intersection highlights (based on uncut assays) from the current reported holes include:

  • KDH346 :   11.00m @ 1.96g/t Au, including   5.0m @ 3.83g/t Au AND
  • KDH346 :   16.70m @ 1.77g/t Au,
  • KDH347 : 170.50m @ 0.83g/t Au, including 19.00m @ 1.51g/t Au
  • KDH350 : 249.55m @ 0.86g/t Au, including 16.90m @ 2.32g/t Au
  • KDH351 : 126.00m @ 1.90g/t Au, including 9.20m   @ 4.84g/t Au AND
                      24.00m @ 3.02g/t Au
  • KDH356 :   73.00m @ 1.39g/t Au, including 5.00m   @ 7.45g/t Au
  • KDH398 :   81.80m @ 1.48g/t Au, including 7.00m   @ 10.15g/t Au AND
  • KDH398 :   15.40m @ 4.10g/t Au, including 7.40m   @ 8.23g/t Au
  • KDH409 :   37.85m @ 1.82g/t Au, including 17.00m @ 2.88g/t Au

Kevin Bullock, Volta Resources' President and CEO, commented, "The results from these drill holes have confirmed the considerable width and tenor of the mineralization from 200m to 350m below surface between sections 5950N and 6200N.  This will convert to additional Measured and Indicated Resources in the Kiaka Central inventory."

Results for the holes are highlighted in Table 1 and locations shown in Figure 1. Analyses of the Volta Resources samples were undertaken by fire assay on a 50g charge at ALS Chemex Laboratories and/or at Actlabs Laboratory, both in Ouagadougou. Volta Resources' sampling and assay procedures included rigorous QA/QC elements that employed the inclusion of certified standards and blanks.

Table 1: Highlights of Gold Intersections for the Reported Holes

HOLE IDFROM
(m)
TO
(m)
INTERVAL
(m)
Au
(g/t)
uncut
Au
(g/t) with
topcut (15g/t)
REMARKS
KDH337175.20202.3027.100.500.50 
AND208.75242.0033.250.540.54 
INCL216.00219.003.001.521.52 
AND256.00259.003.001.121.12 
KDH342176.00215.0039.000.740.74 
INCL187.00192.005.001.101.10 
INCL196.00200.004.002.892.89 
KDH3446.3022.0015.700.780.78core losses 4.0-4.7m, 5.5-6.3m, 7.0-8.1m,
8.5-9.4m and 10.0-11.0m
AND141.00159.2018.201.071.00 
INCL141.00145.004.002.671.00 
KDH34560.00149.0089.000.500.50 
KDH346277.00288.0011.001.961.96286.0-287.0m=12.5 g/t Au
INCL283.00288.005.003.833.83 
AND331.00342.0011.000.610.61 
INCL337.00340.003.001.451.45 
AND348.00362.8014.800.890.89 
AND368.30385.0016.701.771.36284.0-285.0m= 21.7 g/t Au
KDH347345.00355.4510.450.690.69 
AND440.00610.50170.500.830.83 
INCL446.00464.8018.801.161.16 
INCL468.00487.0019.001.511.51 
INCL498.00519.0021.001.151.15 
INCL521.20525.604.401.331.33 
INCL555.00560.005.001.271.27 
KDH348111.00115.004.001.241.24 
KDH349145.00150.005.002.912.91149.0-150.0m=14g/t Au
AND230.00241.0011.000.510.51 
AND295.00298.203.201.381.38 
AND353.60443.0089.400.730.73 
AND451.85491.0039.150.510.51 
INCL455.30459.304.001.281.28 
AND502.00548.0046.000.800.80537.9-539.0m=14.63g/t Au
INCL521.00526.005.001.071.07 
KDH350274.00289.0015.000.510.51 
AND299.00548.55249.550.860.84353-354.1=19.86g/t Au
INCL321.00326.005.001.041.04 
INCL343.00346.003.001.911.91 
INCL353.00369.9016.902.322.04 
INCL374.00387.0013.001.331.33 
INCL390.00398.358.351.411.41 
INCL403.00415.4012.401.471.47 
INCL418.00422.004.001.161.16 
INCL425.80439.0013.201.411.41 
INCL443.00447.004.001.031.03 
INCL451.00458.007.001.201.20 
INCL489.00504.0015.001.081.08 
INCL544.00547.903.901.121.12 
AND571.35586.0014.650.710.71 
INCL580.00585.005.001.031.03 
KDH351102.95107.004.051.311.31 
AND239.00249.0010.000.820.82 
AND330.00456.00126.001.901.72360.0-361.0m=28.3g/t Au, 382.0-383.0m=12.3g/t Au ;
394.0-395.0m=10.65 g/t Au, 444.9-445.5m=11.34g/t
Au; 453.0-454.0=24.2g/t Au
INCL352.80362.009.204.843.40 
INCL364.85376.0011.151.951.95 
INCL378.55396.0017.452.612.61 
INCL403.00407.204.201.101.10 
INCL413.00428.0015.001.221.22 
INCL431.00455.0024.003.022.61 
AND464.45561.2096.750.910.91 
INCL464.45490.0025.551.811.81 
INCL494.00498.004.001.101.10 
INCL505.00508.003.002.062.06 
AND568.35599.0030.651.001.00 
INCL569.00573.004.001.621.62 
INCL581.80594.0012.201.431.43 
AND613.10640.1627.061.181.01615.0-616.0m=19.45g/t Au
INCL614.00617.003.008.108.10 
KDH35335.0039.454.451.361.36 
AND108.00128.0520.050.500.50 
AND263.00295.7532.750.590.59 
INCL282.00290.208.201.021.02 
KDH355243.00250.007.002.562.56248-249=15.55g/t Au
KDH356177.20188.0010.800.700.70 
AND282.00289.007.001.881.88283.0-284.0m=9.36g/t Au
AND343.00416.0073.001.391.33382.0-383.0m=19.3 g/t Au
INCL366.30372.005.701.631.63 
INCL379.00384.005.007.456.59 
INCL386.30402.0015.701.821.82 
INCL407.70411.003.301.831.83 
AND429.50527.0097.500.830.83 
INCL433.65442.308.651.411.41 
INCL448.20467.0018.801.281.28 
INCL470.00496.1026.101.121.12 
INCL499.60503.604.001.241.24 
KDH384139.20152.0012.800.590.59 
KDH38949.1061.0011.900.590.59 
AND129.00147.0018.001.331.33145.0- 146.0m= 11.2g/t Au
INCL135.00138.003.001.681.68 
AND152.15160.107.956.222.33156.0- 157.0m =45.9g/t Au
KDH39092.40110.0017.600.560.56 
AND128.40134.005.601.141.14 
INCL129.00133.004.001.331.33 
AND142.40226.0583.650.540.54ENDED IN MINERALIZATION
INCL168.00175.007.001.071.07 
INCL203.00209.006.001.091.09 
KDH391102.00145.0043.000.670.67 
INCL105.00116.0011.001.391.39 
INCL125.00128.003.001.261.26 
AND174.00178.004.001.791.79 
KDH392117.65165.6047.950.850.85 
INCL129.00134.005.001.591.59 
INCL141.00155.0014.001.571.57 
KDH39372.0093.0021.000.530.53 
AND125.80145.0019.200.660.66 
AND182.00194.8012.800.960.96 
INCL182.00189.007.001.411.41 
AND202.20226.0523.850.870.87 
KDH39491.00124.0033.000.550.55 
AND144.00174.0030.000.560.56 
AND202.00213.0011.000.560.56 
KDH395184.00195.0011.000.710.71 
AND232.00250.9518.950.550.55ENDED IN MINERALIZATION
KDH39693.00168.0075.000.560.56 
AND174.00185.0011.000.570.57 
AND219.00245.0026.000.650.65235.7 -236.45= 8.2125g/t
AND317.00320.003.005.365.36 
KDH397135.00160.0025.000.980.98145- 146= 12.35g/tAu
AND166.00181.0015.000.840.84 
INCL166.00169.003.002.512.51 
KDH39896.00177.8081.801.480.97127- 128 =57g/t Au
INCL123.00130.007.0010.154.15 
INCL168.85177.808.952.022.02 
AND184.00199.4015.404.101.77198- 198.8= 50.88g/t Au
INCL192.00199.407.408.234.31 
AND208.00228.0020.000.630.63 
KDH39987.00169.0082.000.960.85145.3- 146= 24.08g/t Au
INCL113.00122.009.001.121.12 
INCL125.00129.004.001.271.27 
INCL155.00159.004.001.571.57 
AND175.00189.0014.000.540.54 
AND200.00229.3029.300.740.74 
KDH400254.00258.004.001.441.44 
INCL255.00258.003.001.791.79 
KDH401243.00252.009.006.782.01245- 246 =57.9g/t Au
INCL243.00246.003.0019.805.50 
KDH403442.90496.4053.500.840.84 
INCL442.90447.004.101.170.84 
INCL455.00465.0010.001.190.84 
INCL477.00487.4010.401.080.84 
INCL490.10495.004.900.970.84 
AND506.20590.0083.800.900.84 
INCL507.00510.003.001.180.84 
INCL513.00526.0013.001.290.84 
INCL551.00577.0026.001.090.84 
INCL581.00585.004.001.870.84 
AND624.00652.0828.080.730.84ENDED IN MINERALIZATION
INCL636.80643.006.201.200.84 
INCL646.00652.086.081.160.84 
KDH407260.00303.0043.000.590.84 
AND309.10379.0069.900.820.84 
INCL334.00340.006.001.130.84 
INCL343.00359.2516.251.400.84 
INCL365.00371.006.001.500.84 
AND400.00470.0070.000.860.84 
INCL412.00420.008.002.300.84 
INCL451.00456.005.002.110.84 
AND530.00540.4510.450.960.84 
INCL537.00540.453.451.780.84 
AND555.30568.0012.700.830.84 
INCL556.00559.003.002.120.84 
KDH409262.15266.003.851.611.61 
INCL263.00266.003.001.871.87 
AND521.30587.0065.700.870.87 
INCL527.00532.155.151.411.41 
INCL545.00561.0016.001.351.35 
INCL568.25572.003.751.201.20 
AND603.00640.8537.851.821.77608 -609 =16.8g/ t Au
INCL607.00624.0017.002.882.77 
INCL631.20640.008.801.811.81 
AND648.00682.0034.000.870.87 
INCL653.20657.003.803.463.46 
AND689.00701.0312.030.760.76ENDED IN MINERALIZATION
KKRC40637.0045.008.005.032.6438- 39= 34.1 g/t Au

Notes on Table 1:

  1. Intervals are core length. True width is unknown at this time.
  2. Intersections are based on a 0.3 g/t gold cut-off with maximum internal dilution (MID) of 5m for the lower grade mineralization envelope, except for hole KDH349 (451.85-491.0m) and KDH350 (299.0-548.55m) where it has been increased to 6 and 5.55m respectively.
  3. In order to highlight the continuity of the high grade zone, a 0.8 g/t gold cut-off with maximum internal dilution of 2m has been used.
  4. Average gold grades (g/t) are presented with and without topcut applied in separate columns. The values with topcut have applied a grade capping of 15g/t Au.
  5. Where core losses were reported in the mineralized intercepts, the width of the entire mineralized intercept is reported at the weighted average grade of the remaining samples.
  6. The intersections listed in the table represent sections of at least 3m in excess of 1g/t Au and/or sections of at least 10m in excess of 0.5g/t Au.
  7. The intersections represent sections drilled by reverse circulation (RC) and/or cored drilling (see Table 2).
  8. The RC portions of the drill holes were sampled at 1m intervals. Dry samples were riffle-split to provide 2 kg samples sent to the laboratory. Wet samples were dried in the field, then riffle-split in the same way. The cored portion of the drill holes were sampled at one meter intervals and cut in half using a diamond saw. Half-core is archived at the core storage facility on site while the other half was sent to the laboratory.
  9. Samples were then sent to ALS Chemex and/or Actlabs in  Ouagadougou for Fire Assay on a 50g charge.
  10. Certified standards were inserted every 15 samples, field duplicates (in the RC portions) about every 25 and blanks about every 10 samples. The blanks, certified standards and duplicate assays confirm that all assays used to compile the intersections quoted here have passed Volta Resources's rigorous QA/QC checks.

TABLE 2 : Collar Coordinates and Orientation Parameters

SECTIONHOLEIDUTM_XUTM_YUTM_ZDEPTH(m)DrillTypeDIPAZIMUTH
5200NKDH4077394561289092270.0652.44DD-60315
5650NKKRC6587397741289411270.0100.00RC-55135
5700NKDH3847394981289757270.0202.00DD-57315
KKRC4257392791289976270.075.00RC-55135
KKRC4267393501289906270.075.00RC-55135
KKRC4277397391289517270.075.00RC-55135
KKRC4287397741289481270.075.00RC-55135
KKRC4297398101289446270.075.00RC-55135
KKRC4307398451289411270.075.00RC-55135
KDH3557393171289942273.0271.35DD-55135
5750NKDH3517397991289534267.0640.16DD-60315
KDH3857395441289782270.0202.00DD-55315
KKRC6557398451289481270.088.00RC-55135
5800NKDH3507398291289572271.0592.70DD-60315
KDH4037398631289534270.0652.08DD-60315
KDH4097393851290012270.0701.03DD-60135
KKRC6397398631289534270.0100.00RC-55135
5850NKDH3477394891289973272.0622.45DD-60135
KKRC6407398521289616270.0100.00RC-55135
KKRC6417398871289580270.081.00RC-55135
5900NKDH3567395411289999270.0601.84DD-60135
KDH3887396681289870270.0187.10DD-55315
KDH3927399161289623270.0178.07DD-55315
KDH4017394561290082270.0255.90DD-58135
KKRC4207394561290082270.075.00RC-55135
KKRC4217394911290047270.075.00RC-55135
KKRC4227399161289623270.075.00RC-55135
KKRC4237399511289587270.075.00RC-55135
KKRC4247399861289552270.075.00RC-55135
KDH3487398171289735270.4175.00DD-55135
5950NKDH3497395591290049270.9601.80DD-55135
KDH3897397031289906270.0174.14DD-55315
KKRC6927399161289694270.098.00RC-55135
KKRC6937399511289658270.084.00RC-55135
KKRC6947399861289623270.093.00RC-55135
KDH3537396741289940272.3403.55DD-60135
6000NKDH3937397741289906270.0226.05DD-57315
KDH4007395551290125270.0501.82DD-60135
KKRC5537399511289729270.0100.00RC-55135
KKRC5547399861289694270.0100.00RC-55135
KKRC5557400221289658270.0100.00RC-55135
6050NKDH3947399161289835270.0253.23DD-58315
KDH3977398101289941270.0226.10DD-57315
KKRC6517399861289764270.0100.00RC-55135
KKRC6957399511289800270.081.00RC-55135
6100NKDH3377398121290014269.8265.40DD-58135
KDH3427397061290121269.5487.63DD-60135
KDH3967399511289870270.0381.97DD-58315
KKRC5527400571289764270.0100.00RC-55135
6150NKDH3447397531290131268.7259.33DD-58135
KDH3457398621290027268.9266.05DD-58135
KDH3907398451290047270.0226.05DD-57135
KDH3987399691289923270.0251.06DD-58315
6200NKDH3467400581289907266.8421.40DD-60315
KDH3997399931289969270.0250.71DD-58315
6250NKDH3917399161290118270.0251.10DD-58135
KDH3957400571289976270.0250.95DD-58315
6300NKKRC3667398271290277267.049.00RC-55135
KKRC3677398451290259266.649.00RC-55135
KKRC3687398631290241266.640.00RC-55135
KKRC3697398801290224266.649.00RC-55135
KKRC3707398981290206266.749.00RC-55135
KKRC3717399161290188267.049.00RC-55135
KKRC3727399331290171266.849.00RC-55135
KKRC3737399511290153266.546.00RC-55135
KKRC3747399691290135266.546.00RC-55135
KKRC3757399861290118266.546.00RC-55135
KKRC3767400041290100266.646.00RC-55135
KKRC3777400221290082266.446.00RC-55135
KKRC3787400391290065266.246.00RC-55135
KKRC3797400571290047265.946.00RC-55135
KKRC3807400751290030265.846.00RC-55135
KKRC3817400921290012265.450.00RC-55135
KKRC3827401101289994264.850.00RC-55135
KKRC3837401271289978264.650.00RC-55135
6400NKKRC3847398981290348265.550.00RC-55135
KKRC3857399161290330265.650.00RC-55135
KKRC3867399341290312265.550.00RC-55135
KKRC3877399511290295265.450.00RC-55135
KKRC3887399691290277265.350.00RC-55135
KKRC3897399871290260265.950.00RC-55135
KKRC3907400041290242265.450.00RC-55135
KKRC3917400221290224265.450.00RC-55135
KKRC3927400401290207265.450.00RC-55135
KKRC3937400571290189265.150.00RC-55135
KKRC3947400761290171265.150.00RC-55135
KKRC3957400931290153264.950.00RC-55135
KKRC3967401111290136264.950.00RC-55135
KKRC3977401281290118264.550.00RC-55135
KKRC3987401461290100264.150.00RC-55135
KKRC3997401641290082263.850.00RC-55135
KKRC4007401811290066263.750.00RC-55135
KKRC4017402001290046263.550.00RC-55135
6500NKKRC4027399691290418264.150.00RC-55135
KKRC4037399861290401270.050.00RC-55135
KKRC4047400041290383270.050.00RC-55135
KKRC4057400221290365270.050.00RC-55135
KKRC4067400391290348270.050.00RC-55135
KKRC4077400571290330270.050.00RC-55135
KKRC4087400751290312270.050.00RC-55135
KKRC4097400921290295270.050.00RC-55135
KKRC4107401101290277270.050.00RC-55135
KKRC4117401281290259270.050.00RC-55135
KKRC4127401451290242270.050.00RC-55135
KKRC4137401631290224270.050.00RC-55135
KKRC4147401811290206270.050.00RC-55135
KKRC4157401981290189270.050.00RC-55135
KKRC4167402161290171270.050.00RC-55135
KKRC4177402341290153270.050.00RC-55135
KKRC4187402511290135270.050.00RC-55135
KKRC4197402691290118270.050.00RC-55135

Under the guidelines of National Instrument 43-101, the qualified person for the Kiaka Gold Project is Mr. Guy Franceschi, Vice President, Exploration for Volta Resources. Mr. Franceschi is a member of the European Federation of Geologists and has reviewed and approved the contents of this news release.

About Volta Resources:

Volta Resources has a portfolio of quality gold exploration projects in Burkina Faso and Ghana, both mining-friendly West African jurisdictions with proven world-class gold deposits.  VTR will focus on fast-tracking its flagship Kiaka Gold Project (NI-43-101 compliant resources include 117.42 million tonnes @ 1.07 g/t Au for 4,029,000 ounces in the Measured and Indicated categories and 29.96 million tonnes @ 1.00 g/t Au for 1,000,000 ounces in the Inferred category [Please see VTR press release dated March 21, 2012] including 34.38 million tonnes @ 1.04 g/t Au for 1,145,969 ounces of gold in the Proven category and 91.70 million tonnes @ 0.93 g/t Au for 2,742,353 ounces of gold in the Probable category [Please see VTR press release dated May 3, 2012]) towards a development decision, aiming to complete a Feasibility Study in Q3, 2013. Recent acquisition of properties around Kiaka have provided VTR with an extensive ground position along the highly prospective Markoye Fault Corridor in an important emerging gold province.

Forward Looking Information Caution:

This press release presents "forward-looking statements" within the meaning of Canadian securities legislation that involve inherent risks and uncertainties.  Forward-looking statements include, but are not limited to, statements with respect to the future price of gold and other minerals and metals, the estimation of mineral reserves and resources, the realization of mineral reserve estimates, the capital expenditures, costs and timing of the resources, the realization of mineral reserve estimates, the capital expenditures, costs and timing of the development of new deposits, success of exploration activities, permitting time lines, currency exchange rate fluctuations, requirements for additional capital, government regulation of mining operations, environmental risks, unanticipated reclamation expenses, title disputes or claims and limitations on insurance coverage.  Generally, these forward-looking statements can be identified by the use of forward looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved". Forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of Volta Resources to be materially different from those expressed or implied by such forward looking statements, including but not limited to: risks related to international operations, risks related to the integration of acquisitions; risks related to joint venture operations; actual results of current exploration activities; actual results of current or future reclamation activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; future prices of gold and other minerals and metals; possible variations in ore reserves, grade or recovery rates; failure of equipment or processes to operate as anticipated; accidents, labour disputes and other risks of the mining industry; and delays in obtaining governmental approvals or financing or in the completion of development or construction activities.  Although the management and officers of Volta Resources believe that the expectations reflected in such forward-looking statements are based upon reasonable assumptions and have attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements.  Volta Resources does not undertake to update any forward-looking statements that are incorporated by reference herein, except in accordance with applicable securities laws.

  

 

SOURCE Volta Resources Inc.

Image with caption: "Figure 1: Kiaka Project Central Area (CNW Group/Volta Resources Inc.)". Image available at: http://photos.newswire.ca/images/download/20121024_C9562_PHOTO_EN_19688.jpg

For further information, please refer to our website www.Voltaresources.com or contact:

Kevin Bullock, P.Eng., President & CEO      
Tel:  (416) 867-2299
Fax: (416) 867-2298
Email: kbullock@Voltaresources.com

or

Andreas Curkovic, Investor Relations 
Tel: (416) 577-9927


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!




Mineninfo
Volta Resources Inc.
Bergbau
-
-
Minenprofile
Alle Angaben ohne Gewähr! Copyright © by GoldSeiten.de 1999-2024.
Die Reproduktion, Modifikation oder Verwendung der Inhalte ganz oder teilweise ohne schriftliche Genehmigung ist untersagt!

"Wir weisen Sie ausdrücklich auf unser virtuelles Hausrecht hin!"