Suche
 
Folgen Sie uns auf:

Argent Minerals Limited: Presentation - Shareholder/Investor Briefings

22.09.2015  |  ABN Newswire
Sydney, Australia (ABN Newswire) - Argent Minerals Ltd. (ASX:ARD) are pleased to provide a Company Presentation - Shareholder/Investor Briefings, titled "Drill Testing Kempfield for Australia's Next High Grade Lead/Zinc Discovery."

WHY INVEST IN ARGENT MINERALS

Three Projects in Highly Productive Terrane

- Kempfield Polymetallic Project (Argent 100%)
* High grade base and precious metals potential
* Near term production potential (JORC 2012 Resource)

- West Wyalong (Argent 51%, right to earn 70%)
* Large porphyry copper-gold target identified
* 37 km from Lake Cowal mine taken over by Evolution Mining for $US550M

- Sunny Corner (Argent 70%)
* Historic silver/polymetallic mine - very high grades (direct shipped ore to London)
* Potential feedstock for Kempfield

Three Drivers for a Potential Rerate of (ASX:ARD) Share Price

1. A high grade base & precious metals discovery at Kempfield featuring lead/zinc
* Preparations underway for 7 hole 3,200 metre deep diamond drilling program

2. A copper gold discovery at West Wyalong
* Additional geophysics performed on large porphyry copper-gold target - results pending

3. Silver price breakout upward (significant leverage to silver)
* (ASX:ARD) high of $0.29 in 2011 as silver price surged toward $US50/oz

Board Strength and Management Experience

- Depth of experience: mining, finance, commodities & corporate governance

- Compelling track record in high grade base and precious metal discovery
* Todd McGilvray: eg. 22Mt for mine life extension to 88 years at MMG's Rosebery Mine
* Professor Ross Large/CODES (advisory role): Pre-eminent Australian authority

To view the presentation, please visit:
http://media.abnnewswire.net/media/en/docs/ASX-ARD-734327.pdf


About Argent Minerals Limited:

Argent Minerals Ltd. (ASX:ARD) is an Australian publicly listed company with a 100% interest in a silver/gold project at Kempfield NSW. Work is underway on the preparation of an EIS and a feasibility study for the first stage of the project which will involve heap leaching some 8.8 million tonnes of mainly oxide and transitional material to produce over 9.5 million ounces of silver and 15,000 ounces of gold over a 5 year mine life. Argent is also earning up to a 70% interest in two other NSW projects - gold at West Wyalong and base metals at Sunny Corner.



Contact:

David Busch Managing Director
Argent Minerals Ltd.
T: +61-2-9262-2211
F: +61-2-9475-5346
E: admin@argentminerals.com.au
www.argentminerals.com.au
Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!




Mineninfo
Argent Minerals Ltd.
Bergbau
A0NFAM
AU000000ARD1
Minenprofile
Alle Angaben ohne Gewähr! Copyright © by GoldSeiten.de 1999-2024.
Die Reproduktion, Modifikation oder Verwendung der Inhalte ganz oder teilweise ohne schriftliche Genehmigung ist untersagt!

"Wir weisen Sie ausdrücklich auf unser virtuelles Hausrecht hin!"