Suche
 
Folgen Sie uns auf:

Barkerville Gold Mines Intersects 11.82 G/T (0.34 OZ/T) Au Over 10.10 Metres

03.08.2016  |  The Newswire
Including 68.80 G/T (2.01 OZ/T) Au Over 1.30 Metres In Cow Mountain Phase I Drilling

Vancouver, August 3, 2016 - Barkerville Gold Mines Ltd. (TSXV: BGM) (the "Company" or "BGM") is pleased to announce results from the ongoing Phase I exploration and category conversion drilling program on Cow Mountain at the Company's flagship Cariboo Gold Project (CGP). The results of these drill holes are presented in Table 1. A drill hole location plan map and longitudinal section are offered at the end of this release.

Drilling Highlights:

-BGM-16-366: 16.97 g/t (0.49 oz/t) Au over 2.70 metres including 87.60 g/t (2.56 oz/t) Au over 0.50 metres

-BGM-16-367: 8.70 g/t (0.25 oz/t) Au over 4.50 metres including 20.23 g/t (0.59 oz/t) Au over 1.90 metres including 8.64 g/t (0.25 oz/t) Au over 1.00 metres and 33.10 g/t (0.97 oz/t) Au over 0.90 metres

-BGM-16-369: 20.31 g/t (0.59 oz/t) Au over 5.70 metres including 46.26 g/t (1.35 oz/t) Au over 2.40 metres including 121.50 g/t (3.54 oz/t) Au over 0.80 metres and 12.40 g/t (0.36 oz/t) Au over 1.00 metres

-BGM-16-377: 31.94 g/t (0.93 oz/t) Au over 2.70 metres including 57.33 g/t (1.67 oz/t) Au over 1.50 metres including 21.40 g/t (0.62 oz/t) Au over 0.5 metres and 75.30 g/t (2.20 oz/t) Au over 1.00 metres

-BGM-16-380: 11.82 g/t (0.34 oz/t) Au over 10.10 metres including 9.45 g/t (0.28 oz/t) Au over 1.00 metres and 68.80 g/t (2.01 oz/t) Au over 1.30 metres

-BGM-16-385: 10.98 g/t (0.32 oz/t) Au over 5.50 metres including 33.53 g/t (0.98 oz/t) Au over 1.70 metres including 12.85 g/t (0.37 oz/t) Au over 0.85 metres and 54.20 g/t (1.58 oz/t) Au over 0.85 metres

-BGM-16-400: 13.15 g/t (0.38 oz/t) Au over 4.25 metres including 43.20 g/t (1.26 oz/t) Au over 1.20 metres

*Note: Reported core lengths represent 50-75% true widths.

Phase I Drilling

The ongoing 30,000 metre Phase I drilling program at Cow Mountain is currently optimizing inferred gold mineralization within a conceptual open pit. As per the updated 2015 Cow Mountain resource estimate performed by Snowden Mining Industry Consultants (Snowden), of Vancouver, British Columbia (refer to Company News Release dated March 31, 2015), drilling by previous operators from 1938-1981 was classified as inferred mineralization because of lessened data confidence and was not simply a function of wider drill hole spacing. The BGM Phase I program is explicitly targeting these areas by replacing the historical gold intersections with modern drilling that conforms to CIM best practices and QAQC procedures. Based upon the Phase I drilling results to date, there has been excellent correlation between the historic mineralized intervals and the new 2016 Phase I drilling.

"These latest drill results along with ongoing mapping, underground sampling, geologic modeling and historic data validation, continue to add positively to our confidence level of the Cow Mountain gold mineralization," commented Chris Lodder, President and CEO of BGM. "After completion of this drilling program the rigs will be moved to begin drilling on Island Mountain and thus allow us to analyze the drill data and begin planning the next work program on Cow Mountain. We expect to have a resource statement for all exploration targets sometime in 2017."

Qualified Persons

Exploration activities at the Cariboo Gold Project are jointly administered on site by the Company's Project Managers, Maggie Layman, P.Geo. and Wanda Carter, P.Geo. As per National Instrument 43-101 Standards of Disclosure for Mineral Projects, Paul Geddes, P.Geo. Vice President Exploration, is the Qualified Person for the Company and has prepared, validated and approved the technical content of this news release. The Company strictly adheres to CIM Best Practices Guidelines in conducting, documenting, and reporting its exploration activities on the Cariboo Gold Project.

Quality Assurance - Quality Control

Once received from the drill and processed, all drill core samples are sawn in half, labelled and bagged. The remaining drill core is subsequently stored on site at the Company's secure facility in Wells, BC. Numbered security tags are applied to lab shipments for chain of custody requirements. The Company inserts quality control (QC) samples at regular intervals in the sample stream, including blanks and reference materials with all sample shipments to monitor laboratory performance. The QAQC program was designed and approved by Lynda Bloom, P.Geo. of Analytical Solutions Ltd., and is overseen by
Paul Geddes, P.Geo, Vice President Exploration.

Drill core samples are submitted to ALS Geochemistry's analytical facility in North Vancouver, British Columbia for preparation and analysis. The ALS facility is accredited to the ISO/IEC 17025 standard for gold assays and all analytical methods include quality control materials at set frequencies with established data acceptance criteria. The entire sample is crushed and 250 grams is pulverized. Analysis for gold is by 50g fire assay fusion with atomic absorption (AAS) finish with a lower limit of 5ppb and upper limit of 10,000ppb. Samples with gold assays greater than 10,000ppb are re-analyzed using 50g fire assay with gravimetric finish, as well as 1,000g screen metallic fire assay. Samples are also analyzed using a 48 multi-elemental geochemical package by a 4-acid digestion, followed by Inductively Coupled Plasma Atomic Emission Spectroscopy (ICP-AES) and Inductively Coupled Plasma Mass Spectroscopy (ICP-MS).

For further information on Barkerville Gold Mines Ltd. please contact:

Chris Lodder

President & Chief Executive Officer

Suite 400-365 Bay Street

Toronto, Ontario, Canada

clodder@barkervillegold.com

About Barkerville Gold Mines Ltd.

The Company is focused on developing its extensive land package located in the historical Cariboo Mining District of central British Columbia. Barkerville's mineral tenures cover 1,164 square kilometres along a strike length of 60 kilometres which includes several past producing hard rock mines of the historic Barkerville Gold Mining Camp near the town of Wells, British Columbia. The QR Project, located approximately 110 kilometres by highway and all weather road from Wells was acquired by Barkerville in 2010 and boasts a fully permitted 900 tonne/day gold milling and tailings facility. Test mining of the Bonanza Ledge open pit was completed in March of 2015 with 91,489 tonnes of ore milled producing 25,464 ounces of gold. The Company has completed a number of drilling and exploration programs over the past 20 years and is currently compiling this data with all historical information in order develop geologic models which will assist new management and provide the framework to continue to explore the Cariboo Gold Project. An extensive drill program is currently underway with the goal of delineating additional high grade gold mineralization.

Cautionary Statement on Forward -Looking Information

Neither the TSX Venture Exchange ("TSXV") nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein. This news release contains forward-looking information which is not comprised of historical facts. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward looking information in this news release includes, but is not limited to, the Company's objectives, goals or future plans, statements regarding exploration results and exploration plans. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to, capital and operating costs varying significantly from estimates, the preliminary nature of metallurgical test results, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, uncertainties relating to the availability and costs of financing needed in the future, changes in equity markets, inflation, fluctuations in commodity prices, delays in the development of projects and the other risks involved in the mineral exploration and development industry, and those risks set out in the Company's public documents filed on SEDAR. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.

Table 1: Length weighted gold composites for drill holes BGM-16-362 through BGM-16-400:

HOLE-ID

FROM (M)

TO (M)

CORE LENGTH (M)

AU (G/T)

AU (OZ/T)

BGM-16-362

67.00

68.10

1.10

38.88

1.13

INCL

67.00

67.65

0.65

55.20

1.61

AND

67.65

68.10

0.45

15.30

0.45

BGM-16-362

89.50

90.00

0.50

6.10

0.18

BGM-16-363

6.61

8.00

1.39

6.52

0.19

BGM-16-363

85.50

86.00

0.50

7.58

0.22

BGM-16-364

10.50

23.10

12.60

1.17

0.03

BGM-16-365

27.15

28.35

1.20

60.80

1.77

BGM-16-366

154.50

157.20

2.70

16.97

0.49

INCL

155.20

155.70

0.50

87.60

2.56

BGM-16-367

46.50

51.00

4.50

8.70

0.25

INCL

48.00

49.90

1.90

20.23

0.59

INCL

48.00

49.00

1.00

8.64

0.25

AND

49.00

49.90

0.90

33.10

0.97

BGM-16-367

58.00

59.00

1.00

14.20

0.41

BGM-16-368

NSA

BGM-16-369

59.00

64.70

5.70

20.31

0.59

INCL

59.00

61.40

2.40

46.26

1.35

INCL

59.00

59.80

0.80

121.50

3.54

AND

60.40

61.40

1.00

12.40

0.36

BGM-16-370

24.00

25.50

1.50

2.66

0.08

BGM-16-371

50.65

54.50

3.85

5.60

0.16

INCL

51.15

51.85

0.70

7.45

0.22

AND

54.00

54.50

0.50

26.60

0.78

BGM-16-372

44.90

46.00

1.10

9.08

0.26

BGM-16-373

PENDING

BGM-16-374

32.00

33.80

1.80

14.63

0.43

INCL

32.00

33.00

1.00

16.50

0.48

AND

33.00

33.80

0.80

12.30

0.36

BGM-16-374

52.50

53.10

0.60

19.50

0.57

BGM-16-374

63.50

65.00

1.50

6.32

0.18

BGM-16-375

38.50

39.70

1.20

3.39

0.10

BGM-16-376

11.00

12.00

1.00

8.18

0.24

BGM-16-377

62.30

65.00

2.70

31.94

0.93

INCL

62.30

63.80

1.50

57.33

1.67

INCL

62.30

62.80

0.50

21.40

0.62

AND

62.80

63.80

1.00

75.30

2.20

BGM-16-378

NSA

BGM-16-379

14.50

15.20

0.70

6.68

0.19

BGM-16-379

32.45

34.60

2.15

8.31

0.24

INCL

32.45

33.10

0.65

25.00

0.73

BGM-16-379

58.60

59.55

0.95

11.20

0.33

BGM-16-379

71.40

72.90

1.50

31.00

0.90

BGM-16-380

37.50

47.60

10.10

11.82

0.34

INCL

37.50

38.50

1.00

9.45

0.28

AND

46.30

47.60

1.30

68.80

2.01

BGM-16-381

69.00

72.00

3.00

8.45

0.25

INCL

69.00

69.80

0.80

20.70

0.60

AND

69.80

70.60

0.80

10.25

0.30

BGM-16-382

NSA

BGM-16-382

NSA

BGM-16-383

14.10

15.00

0.90

7.42

0.22

BGM-16-383

49.35

50.00

0.65

12.30

0.36

BGM-16-383

54.00

55.50

1.50

12.65

0.37

BGM-16-384

NSA

BGM-16-385

54.50

60.00

5.50

10.98

0.32

INCL

55.35

57.05

1.70

33.53

0.98

INCL

55.35

56.20

0.85

12.85

0.37

AND

56.20

57.05

0.85

54.20

1.58

BGM-16-386

41.00

44.25

3.25

13.29

0.39

INCL

42.40

43.00

0.60

34.70

1.01

AND

43.00

44.25

1.25

13.00

0.38

BGM-16-386

60.30

61.70

1.40

5.54

0.16

BGM-16-387

PENDING

BGM-16-388

PENDING

BGM-16-389

57.40

58.00

0.60

14.85

0.43

BGM-16-389

57.40

58.00

0.60

14.85

0.43

BGM-16-389

68.57

69.10

0.53

17.20

0.50

BGM-16-389

68.57

69.10

0.53

17.20

0.50

BGM-16-389

70.55

71.05

0.50

11.15

0.33

BGM-16-389

70.55

71.05

0.50

11.15

0.33

BGM-16-389

76.90

77.35

0.45

6.01

0.18

BGM-16-389

76.90

77.35

0.45

6.01

0.18

BGM-16-390

NSA

BGM-16-391

ABANDONED

BGM-16-392

NSA

BGM-16-393

NSA

BGM-16-394

25.00

26.00

1.00

6.63

0.19

BGM-16-394

41.67

42.50

0.83

13.55

0.40

BGM-16-394

79.52

80.35

0.83

5.58

0.16

BGM-16-394

93.85

94.72

0.87

5.18

0.15

BGM-16-394

105.50

106.15

0.65

7.55

0.22

BGM-16-395

NSA

BGM-16-396

48.15

49.00

0.85

16.25

0.47

BGM-16-397

47.00

48.00

1.00

23.50

0.69

BGM-16-397

115.00

116.00

1.00

18.00

0.53

BGM-16-398

53.50

54.00

0.50

15.70

0.46

BGM-16-399

47.60

48.12

0.52

11.75

0.34

BGM-16-399

50.35

51.10

0.75

6.49

0.19

BGM-16-399

52.20

53.00

0.80

34.70

1.01

BGM-16-400

31.75

36.00

4.25

13.15

0.38

INCL

31.75

32.95

1.20

43.20

1.26

Notes:

*Core lengths represent 50-75% true widths. Rock not recovered by drilling was assigned zero grade and not included in the composites. Top cuts have not been applied to high grade assays. Conversion factor: 1.0 oz/t = 34.2857 g/t. NSA - No Significant Assays.

Table 2: Drill hole Collar Orientations

HOLE-ID

AZIMUTH

DIP

HOLE-ID

AZIMUTH

DIP

BGM-16-362

137.3

-46

BGM-16-381

328.3

-43.6

BGM-16-363

139.3

-71

BGM-16-382

321.9

-69.3

BGM-16-364

136.3

-48.7

BGM-16-383

137.2

-61.9

BGM-16-365

140.5

-68.5

BGM-16-384

143

-59.5

BGM-16-366

138.4

-64.5

BGM-16-385

138.2

-65.2

BGM-16-367

138.7

-55.5

BGM-16-386

137.8

-64.5

BGM-16-368

149.2

-77.9

BGM-16-387

139.6

-61.8

BGM-16-369

143.1

-61.9

BGM-16-389

139.9

-69.4

BGM-16-370

134.8

-45.6

BGM-16-390

142.6

-68.3

BGM-16-371

324

-66.2

BGM-16-391

138.2

-58.7

BGM-16-372

132.2

-66.8

BGM-16-392

138.6

-66.7

BGM-16-373

321.6

-67.4

BGM-16-393

134.7

-45.8

BGM-16-374

133.8

-67

BGM-16-394

137.9

-71.1

BGM-16-375

137.2

-69.1

BGM-16-395

320.6

-81

BGM-16-376

143.1

-50

BGM-16-396

148

-55.3

BGM-16-377

327.9

-45.5

BGM-16-397

137

-68.7

BGM-16-378

323.1

-59.7

BGM-16-398

135.7

-67.6

BGM-16-379

143.9

-56.3

BGM-16-399

137.8

-67.2

BGM-16-380

140.4

-71

BGM-16-400

133.6

-65


Click Image To View Full Size


Click Image To View Full Size

Copyright (c) 2016 TheNewswire - All rights reserved.

Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!




Mineninfo
Barkerville Gold Mines Ltd.
Bergbau
-
-
Minenprofile
Alle Angaben ohne Gewähr! Copyright © by GoldSeiten.de 1999-2024.
Die Reproduktion, Modifikation oder Verwendung der Inhalte ganz oder teilweise ohne schriftliche Genehmigung ist untersagt!

"Wir weisen Sie ausdrücklich auf unser virtuelles Hausrecht hin!"