Suche
 
Folgen Sie uns auf:

Landore Resources Limited - Progress Report BAM East Gold Prospect Junior Lake Property

12.01.2017  |  CNW

(AIM Ticker: LND.L)

LONDON, UK, Jan. 12, 2017 /CNW/ - Landore Resources Ltd. (AIM:LND) ("Landore Resources" or "the Company") is pleased to provide this progress report on extension drilling of the BAM East Gold prospect on its Junior Lake Property, Ontario, Canada ("BAM East Gold Prospect").

Highlights:

  • Drilling results continue to report wide zones of gold mineralisation including high grade intersections with drill-hole 0416-555 reporting 18.27 metres (m) at 3.69 grams/tonne (g/t) gold  including 2.00m at 21.49g/t gold and drill-hole 0416-557 reporting 30.00m at 2.27g/t gold including 5.00m at 4.17g/t.
  • The Central Zone of the BAM East Gold Prospect has now been extended to over 800 metres of strike length from 2100E to 2900E and to > 250m down dip. The Zone remains open down dip and to the east and west along strike.
  • Drilling and exploration on the BAM East Gold Prospect has concluded for the year with all results now received and submitted for inclusion towards the Maiden Resource and Technical Report due for release in Q1 2017.

Commenting on this report, Chief Executive Officer of Landore Resources, Bill Humphries, said:

"Since Landore's discovery of the BAM East Gold Prospect in late 2015 drilling has successfully delineated a significant gold occurrence in the Central Zone, over 800 metres in length and 250+ metres down dip, together with identifying other highly prospective gold occurrences with similar lithology along a potential 2.7 kilometre strike length.
Landore awaits with excited anticipation receipt of the Maiden Resource and Technical Report for the BAM East Gold Prospect in Q1 2017."

BAM East Gold Prospect:
This new gold prospect is located approximately midway along a 2.7-kilometre long, east-southeast to west-northwest trending MaxMin geophysical anomaly (MM-7), at the western end of which is located the historical BAM gold zone discovered by Landore Resources in 2003.  

Since drilling commenced on the BAM East Gold project in December 2015, 44 (6HQ and 38NQ) diamond drill holes, for 8,539 metres, have been drilled, successfully delineating a significant gold occurrence in the Central Zone and identifying other highly prospective areas with similar lithology along the 2.7 kilometre potential strike length.

All results have now been received and submitted for inclusion towards the Maiden Resource and Technical Report due for release in Q1 2017.

Fall Drilling Campaign:
The fall drilling campaign has been completed with 15 (6-HQ and 9-NQ) diamond drill holes (0416-546 to 0416-560), for 3,682 metres, having been drilled to test the east, west and down dip extensions of the new gold zone.

Latest results received include the following.

Easting

Northing

Drill-hole

From

Interval*

Au



No

Metres

Metres

g/t

1000E

500N

0416-550

15.50

1.10

2.37

1000E

400N

0416-551

107.70

6.10

1.25



including

112.10

0.70

6.44

2100E

228N

0416-560

66.44

5.01

1.37

2100E

100N

0416-556

199.22

6.32

1.15

2200E

70N

0416-555

186.00

18.27

3.69



including

202.27

2.00

21.49

2397E

00N

0416-557

126.71

9.45

0.74



and

161.72

3.00

1.02



and

172.72

30.00

2.27



including

175.72

5.00

4.17



including

193.72

1.00

11.70

2550E

10S

0416-558

149.00

8.16

1.39



including

149.00

0.65

8.85

* Drill Holes 0416-557 and 558 were drilled north at 55 degrees with the remaining drill-holes at 45 degrees into a lithological package dipping approximately 40 degrees to the south. The actual true thickness of mineralisation is estimated to represent between 80-85% for 0416-557 and 558 and between 85-90% for the remaining drill holes for the intervals shown in the above table.

 

Drilling completed on lines 1000E and 1600E intersected similar lithologies to the Central Zone with gold mineralisation reporting up to 6.44g/t in drill-hole 0416-551 on line 1000E.

Studies in progress:  
Metallurgical Testing: Drill core material was submitted to ALS Metallurgy Kamloops of British Columbia for Gravity Concentration and Cyanidation Bottle Roll Testing. The preliminary report has been received and is currently being reviewed prior to results being released.

Borehole Surveying: DGI Geoscience of Ontario was engaged to conduct Borehole Surveying, using an Acoustic Televiewer, of selected drill-holes on the Central Zone to provide true orientation of features for structural studies and for future geotechnical studies. The report is scheduled for receipt in Q1 2017 and will be interpreted by a Consultant Structural Engineer.

Resource Estimate: Landore Resources has retained consulting engineers RPA Inc. ("RPA") of Toronto, Canada, in order to complete an initial Mineral Resource estimate and NI 43-101 Technical Report on the Bam East Gold Prospect, scheduled for completion Q1 2017.

Planned Works:
Future Drilling: Planning has commenced for a Winter/Spring drill programme in Q1/Q2 2017 along 400 metres to the west of line 2450E in the Ladle Flats which is highly prospective to contain the near-surface extension of the Central Zone, as well as further drilling to test down dip and East-West strike extension.

Michele Tuomi, (P.Geo., BSc. Geology), Director/VP Exploration of Landore Resources Canada Inc. and a Qualified Person as defined in the Canadian National Instrument 43-101, has reviewed and verified all scientific or technical mining disclosure contained in this announcement.

About Landore Resources
Landore Resources is an exploration company that seeks to grow shareholder value through the acquisition, exploration and development of precious and base metal projects in eastern Canada. The Company is primarily focused on the development of the Junior Lake Project. Landore Resources has mineral rights to five properties in eastern Canada. The Company is headquartered in Guernsey, with an exploration office located in Thunder Bay, Ontario, Canada.

This announcement contains inside information as defined in Article 7 of the Market Abuse Regulation No 596/2014.

SOURCE Landore Resources Ltd.



Contact
Bill Humphries, Chief Executive Officer, Tel: 07734 681262; Richard Prickett, Finance Director, Tel: 07775 651421; Landore Resources Ltd., www.landore.com; James Spinney / Jack Botros, Tel: 020 7409 3494, Strand Hanson Limited, Nominated Advisor and Broker
Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!




Mineninfo
Landore Resources Ltd.
Bergbau
A2QADF
GG00BMX4VR69
Minenprofile
Alle Angaben ohne Gewähr! Copyright © by GoldSeiten.de 1999-2024.
Die Reproduktion, Modifikation oder Verwendung der Inhalte ganz oder teilweise ohne schriftliche Genehmigung ist untersagt!

"Wir weisen Sie ausdrücklich auf unser virtuelles Hausrecht hin!"