Kerr Mines Awards Key Contracts for the 2017 Exploration Program and Pre-Feasibility Study
TORONTO, Aug. 8, 2017 /CNW/ - Kerr Mines Inc. ("Kerr" or the "Company") (TSX: KER, OTC: KERMF, FRA: 7AZ1) is pleased to announce that it has completed the tender process and has awarded the three key contracts to support the execution of the 2017 Copperstone Mine exploration program and pre-feasibility study.
Hard Rock Consulting ("HRC") of Colorado, has been appointed to conduct the Copperstone Mine pre-feasibility study, which is estimated to be completed by Q1 2018. The pre-feasibility study will be the basis for the decision to proceed towards production of the Copperstone Mine.
In addition, Godbe Drilling LLC ("Godbe") of Arizona, has been awarded the drilling contract, which includes both the surface and underground drilling programs.
DMC Mining Services Corporation ("DMC") of Utah, has been awarded the contract for underground development. The inclusion of the underground development allows the 2017 Copperstone Mine exploration program to access high-priority targets previously unavailable.
HRC is recognized for delivering expertise and providing value added service directly from the highly experienced principals to a variety of mining clients ranging from due diligence to full feasibility studies. This allows HRC to take a hands-on role in providing a cost-effective and prudent move forward strategy. Both Godbe and DMC have extensive experience in their core businesses and share a proven ability to achieve safe performance and deliver excellent results under a variety of conditions. These appointments establish a key milestone in the Company's development strategy by employing strong expertise in engineering, drilling and mine development, in order to advance the Copperstone Mine project towards a production decision.
A competitive bidding, evaluation and selection process was carried out by senior management, which led to these awards. "We are very pleased to have completed the process of selection of the engineering, drilling and mine development contractors, enabling Kerr to execute the 2017 Copperstone exploration program and pre-feasibility study. Detailed planning of the program is well underway and contractors are preparing to mobilize," said Martin Kostuik, President, Kerr Mines.
About Kerr Mines Inc.
Kerr Mines is a North American gold development and exploration company currently advancing the fully permitted past-producing Copperstone Mine project. Copperstone is a high-grade gold project located along the Walker Lane mineral belt in mining-friendly Arizona. The project demonstrates significant upside exploration potential within 12,000 acre a land package which includes a production history of over 500,000 ounces of gold. The Company's current focus is on maximizing Copperstone's potential by defining and expanding current resources and strengthening the mine's economics leading to a production decision.
Cautionary Note Regarding Forward Looking Statements
This news release contains forward-looking statements, including current expectations on the timing of the commencement of production and the rate of production, if commenced. These forward-looking statements entail various risks and uncertainties that could cause actual results to differ materially from those reflected in these forward-looking statements. Such statements are based on current expectations, are subject to a number of uncertainties and risks, and actual results may differ materially from those contained in such statements. These uncertainties and risks include, but are not limited to, the strength of the Canadian economy; the price of gold; operational, funding, and liquidity risks; the degree to which mineral resource estimates are reflective of actual mineral resources; and the degree to which factors which would make a mineral deposit commercially viable are present; the risks and hazards associated with underground operations. Risks and uncertainties about Kerr Mines' business are more fully discussed in the Company's disclosure materials, including its annual information form and MD&A, filed with the securities regulatory authorities in Canada and available at www.sedar.com and readers are urged to read these materials. Kerr Mines assumes no obligation to update any forward-looking statement or to update the reasons why actual results could differ from such statements unless required by law.
Neither TSX nor its Regulation Services Provider (as that term is defined in the policies of the TSX) accepts responsibility for the adequacy or accuracy of this release and no stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.
SOURCE Kerr Mines Inc.
Contact
Claudio Ciavarella, Chief Executive Officer, cciavarella@kerrmines.com, 647-229-0503